• 제목/요약/키워드: Turnkey project

검색결과 34건 처리시간 0.021초

경량전철 차량시스템 생명주기와 시스템엔지니어링 적용기술개발에 관한 고찰 (Study on life cycle of LRT systems and technology development applied system engineering)

  • 이성권;전서탁;정계용;김재진;정수영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1629-1635
    • /
    • 2011
  • Because LRT project is large infrastructure projects investing enormous budget and required continuous maintenance after construction, it is the global trend to perform business in terms of life-cycle from the initial construction, operation to disposal. It is very important LRT to manage interfaces efficiently and to integrate vehicle, civil, track, electricity, communications, signals, operations, facilities organically. Global companies of the railway developed countries including Europe are getting orders a large rail project and preempting the world market based on engineering technology. But, domestic LRT systems engineering is the subcontracting level to the lack of practical skills and experience. Thus, technology securement is very urgent for the independence of systems engineering technology and overseas advance based turnkey. In this paper, we are going to study applicable systems engineering technology focusing on LRT system based on international standard ISO/IEC 15288.

  • PDF

턴키 및 대안입찰사업의 설계VE 성과분석 (An Implementation Analysis of Design VE to Turn-key and Alternative Project)

  • 김기한;이현석;임희동;김병수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.1011-1014
    • /
    • 2007
  • 건설시설물의 기능향상과 경제성을 제고하기 위하여 도입된 설계VE제도는 2005년 12월부터 100억 이상 건설공사에 확대 적용되고 있다. 그러나 VE가 형식적이고 결과 중심적으로 실시되고 있어 VE를 통한 가치창출의 극대화라는 VE본연의 목적을 달성하지 못하고 있는 실정이다. 본 연구에서는 그동안 국내에서 실시된 턴키 및 대안입찰사업의 설계VE 사례를 통하여 설계VE의 성과를 분석하고 개선방안을 제시하고자 한다.

  • PDF

IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트 (A Checklist for Assessment of Risks Involved in IT Service Project Contract)

  • 정은주;정승렬
    • 인터넷정보학회논문지
    • /
    • 제15권4호
    • /
    • pp.57-65
    • /
    • 2014
  • 최근 한국의 대규모 IT 서비스 프로젝트의 수익률은 저하되고 있는 것으로 파악된다. IT 서비스 프로젝트의 수익률을 저하시키는 가장 큰 이유는 프로젝트와 관련된 여러 위험 요인들이 프로젝트의 일정 지연 및 비용 초과를 초래한 것으로 파악 된다. 이러한 일정 지연 및 비용 초과 현상을 방지하기 위해서는 프로젝트의 위험 요인들을 계약 체결 전에 식별하는 것이 매우 중요하다. 왜냐하면 발주사와 개발사간 계약 조건 협상 시 식별된 위험 요인들을 제거할 수 있기 때문이다. 본 연구에서는 IT 서비스 프로젝트의 특성으로 인해 프로젝트 수행 과정에서 발생할 수 있는 계약 위험 요인들을 사전에 파악하고 평가할 수 있는 체크리스트를 제시하고, 이를 실제 금융 산업의 IT 서비스 프로젝트에 적용하여 그 효과를 확인하고자 하였다. 적용 사례를 분석한 결과 IT 서비스 프로젝트의 위험 요인들을 식별하고 제거하는데 본 연구에서 제시된 체크리스트가 효과가 있음을 확인하였다.

공공투자사업의 입·낙찰 분석 (Analysis on Procurement Auction System in Public Procurement Service)

  • 김정욱
    • KDI Journal of Economic Policy
    • /
    • 제32권2호
    • /
    • pp.144-170
    • /
    • 2010
  • 공공투자사업에서는 최저가낙찰제, 턴키 제도, 대안입찰제 등 다양한 방식이 사용되고 있다. 최근 가격경쟁을 통한 효율성 제고를 주목적으로 하는 최저가낙찰제가 확대되어 시행되고 있다. 본 논문은 우리나라 입 낙찰 제도의 현황과 특징을 파악하고, 대형 공공투자사업에 주로 적용되는 최저가 낙찰제, 턴키 대안 입찰제도하에서의 가격 경쟁효과가 직접적으로 드러나는 낙찰률을 비교 분석하는 것에 의미가 있다. 각 입찰제도의 성과는 경쟁의 행태에 달려 있음을 고려하여 경쟁률과 낙찰률을 중심으로 여러 입찰제도의 입 낙찰 현황을 분석하였다. 1,000억원 이상 사업의 경우 최저가낙찰제하에서 평균 입찰참여자 수는 33.75명, 평균 낙찰률은 61.18%로 나타나, 턴키 대안 입찰제의 평균 입찰참여자 수 2.94명, 평균 낙찰률 90.20%와 큰 차이를 보였다. 최저가낙찰제의 경우 규모의 차이를 고려한다 하더라도 낙찰률이 현저히 낮으며, 경쟁의 정도가 심한 것을 확인할 수 있다. 이러한 낙찰률의 차이는 근본적으로 제도의 차이로 해석할 수 있으며, 경쟁의 차이로도 일부 해석할 수 있다. 민간투자사업의 경우, 평균 입찰참여자 수는 1.88명이며, 평균 낙찰률은 90%에 이르고 있어 경쟁 활성화를 통해 효율성을 제고할 여지가 있음을 제시하였다.

  • PDF

공공시설물의 생애주기비용 평가기준 개발 (The Development of Life Cycle Cost Evaluation Index for Public Facilities)

  • 김태희;구본학;김옥규;박태근;이현수
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.216-224
    • /
    • 2008
  • 최근 들어 선진국에서는 LCC에 대한 평가 제도를 활발히 활용 중에 있고, 우리나라는 생애주기비용을 절감하기 위하여 그 제도를 신규로 도입하고 있다. 그리고 새로운 정부공사 발주방식인 “기술제안형 입찰방식” 도입에 따라 시설물의 LCC 평가가 필요하게 되었다. 현재 우리나라는 BTL과 턴키 프로젝트에서 LCC를 평가하고 있으나 평가요소와 기준이 불명확하여 평가에 어려움을 겪고 있고, BTL과 턴키를 제외한 공공건설사업은 LCC 평가가 이루어지지 않고 있는 실정이다. 따라서 본 연구에서는 LCC를 체계적이고 객관적인 평가를 위한 평가기준 및 활용방안을 제시하고자 한다. LCC 평가기준을 도출을 위한 연구방법 및 주요결과는 다음과 같다. (1) 기존의 평가기준을 분석하여 평가기준의 필요성 및 문제점을 파악하고, (2) 보고서분석 및 설문조사를 통하여 LCC 평가기준을 도출하였고, (3) 실무에서 합리적으로 활용할 수 있도록 활용방안 및 평가방법을 제시하였다.

국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點) (Some Practical Issues on the International Construction Contract)

  • 김승현
    • 무역상무연구
    • /
    • 제25권
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구 (A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process)

  • 김경백;이가연;김상범
    • 한국건설관리학회논문집
    • /
    • 제21권2호
    • /
    • pp.30-38
    • /
    • 2020
  • 국내 공공 건설공사 공사비 수준이 시장 상황을 합리적으로 반영하지 못하고 있는 인식이 산업 전반에 널리 펴져 있는 가운데, 총사업비 관리 프로세스 상의 과도한 공사비 조정이 공사비의 적정성 미확보에 대한 핵심 원인 중 하나로 지목되고 있다. 정부는 건설 프로젝트 총사업비 산정 및 관리 프로세스에서 삭감 위주의 정책을 펼치고 있으며, 산업계에서는 예정가격 대비 낙찰가격의 수준은 매우 낮다는 인식이 일반적이다. 본 연구에서는 총사업비 관리 프로세스를 개선하기 위한 목적으로 총사업비 산정 및 관리 프로세스에 대한 분석을 수행한다. 입·낙찰 방식별 총사업비가 단계별 조정되는 과정을 분석하고, 사업구상 단계 대비 낙찰가격의 수준에 대한 정량적 비교분석 결과를 도출한다.

원전건설 발주 및 계약체계에 대한 고찰 (A Study of the Construction Contracts and Delivery System for Nuclear Power Plant)

  • 서용덕;원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.233-235
    • /
    • 2012
  • Continually having growed up overseas construction market for new Nuclear Power Plant(NPP), the exports of Korean Reactor emerges as the key task of National Nuclear Business. The objective of this study is to strengthen the competitiveness of Korean Reactor through the improvement of Construction Project Contract & Delivery System for NPP. This study suggests the method for increasing Korean Reactor's competitiveness of exports by analyzing the business environment of foreign market and comparing Contract & Delivery System between domestic and foreign.

  • PDF

해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안 (Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects)

  • 이원규;박문선;김용수
    • 한국건설관리학회논문집
    • /
    • 제11권5호
    • /
    • pp.3-14
    • /
    • 2010
  • 본 연구는 EPC LSTK 프로젝트의 계획단계에서 계약자가 수행하는 타당성 분석사례들을 조사 및 분석하고, 이에 대한 문제점 및 개선방안 제시를 위하여 수행되었다. 이를 위하여 GCC 국가를 대상으로 한 5개의 타당성분석에 대한 사례를 조사하고 이를 분석하였다. 상기와 같은 목적과 방법에 따라 진행된 본 연구의 결과를 요약하면 다음과 같다. 1) 타당성 분석시 고려변수 등에 대한 영향요인 분석 미흡으로 원가상승, 공기지연 초래 및 품질저하의 문제점이 존재하는 것으로 분석되었다. 2) 상기의 문제점을 바탕으로 원가상승에 대한 문제, 공기지연에 대한 문제, 품질저하의 문제에 대해 타당성 분석 차원의 개선방안을 제시하였다. 3) 해외 플랜트 공사에 있어 상기에서 분석한 문제점 및 개선방안을 준용할 수 있는 사업 타당성 분석 프로세스를 단계 별로 제시하였다.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.