• Title/Summary/Keyword: Trial construction

Search Result 266, Processing Time 0.024 seconds

Consideration on the trial operation of 765kV substation (765kV 변전소 시운전에 관한 고찰)

  • Byun, Gang;Jung, S.H.;Park, K.W.;Lee, S.M.;Choi, M.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.29-31
    • /
    • 2002
  • Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.

  • PDF

Analyzing consolidation data to predict smear zone characteristics induced by vertical drain installation for soft soil improvement

  • Parsa-Pajouh, Ali;Fatahi, Behzad;Vincent, Philippe;Khabbaz, Hadi
    • Geomechanics and Engineering
    • /
    • v.7 no.1
    • /
    • pp.105-131
    • /
    • 2014
  • In this paper, the effects of variability of smear zone characteristics induced by installation of prefabricated vertical drains on the preloading design are investigated employing analytical and numerical approaches. Conventional radial consolidation theory has been adopted to conduct analytical parametric studies considering variations of smear zone permeability and extent. FLAC 2D finite difference software has been employed to conduct the numerical simulations. The finite difference analyses have been verified using three case studies including two embankments and a large-scale laboratory consolidometer with a central geosynthetic vertical drain. A comprehensive numerical parametric study is conducted to investigate the influence of smear zone permeability and extent on the model predictions. Furthermore, the construction of the trial embankment is recommended as a reliable solution to estimate accurate smear zone properties and minimise the post construction settlement. A back-calculation procedure is employed to determine the minimum required waiting time after construction of the trial embankment to predict the smear zone characteristics precisely. Results of this study indicate that the accurate smear zone permeability and extent can be back-calculated when 30% degree of consolidation is obtained after construction of the trial embankment.

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

Trial Construction for the Prevention of Fire Spread in Piloti Building (필로티건축물의 화재확산방지를 위한 시범시공)

  • Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.87-88
    • /
    • 2019
  • In case of Korea, The Large-scale fire is consistently being such as 2015 Uijeongbu Fire, 2017 Jecheon Fire, 2018 Sejong Hospital Fire. Such a fire has a problem that the fire is spreading upper due to external flame spread. As a countermeasure the fire safety, the study about axial temperature prediction of external flame spread is consistently doing. But in korea, Vertical spandrel is specified as 40cm, and improvement is urgently needed. In this study, a repair material was selected to prevent the fire from spreading to a building where a flammable exterior material was installed and then pilot construction was carried out. Also, fire safety measures for buildings constructed with flammable exterior materials were examined.

  • PDF

A Low-Cost Approach for Path Programming of Terrestrial Drones on a Construction Site

  • Kim, Jeffrey;Craig, James
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.319-327
    • /
    • 2022
  • Robots for construction sites, although not deeply widespread, are finding applications in the duties of project monitoring, material movement, documentation, security, and simple repetitive construction-related tasks. A significant shortcoming in the use of robots is the complexity involved in programming and re-programming an automation routine. Robotic programming is not an expected skill set of the traditional construction industry professional. Therefore, this research seeks to deliver a low-cost approach toward re-programming that does not involve a programmer's skill set. The researchers in this study examined an approach toward programming a terrestrial-based drone so that it follows a taped path. By doing so, if an alternative path is required, programmers would not be needed to re-program any part of the automated routine. Changing the path of the drone simply requires removing the tape and placing a different path - ideally simplifying the process and quickly allowing practitioners to implement a new automated routine. Python programming scripts were used with a DJI Robomaster EP Core drone, and a terrain navigation assessment was conducted. The study examined the pass/fail rates for a series of trial run over different terrains. The analysis of this data along with video recording for each trial run allowed the researchers to conclude that the accuracy of the tape follow technique was predictable on each of the terrain surfaces. The accuracy and predictability inform a non-coding construction practitioner of the optimal placement of the taped path. This paper further presents limitations and suggestions for some possible extended research options for this study.

  • PDF

Trial Construction of FRP-Concrete Composite Deck for Cable-Stayed Bridge (사장교용 FRP-콘크리트 합성바닥판의 시험시공)

  • Kim, Sung-Tae;Park, Sung-Yong;Cho, Keun-Hee;Cho, Jeong-Rae;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.43-44
    • /
    • 2010
  • We developed a new FRP-concrete composite deck applicable to a cable-stayed bridge, and applied to a trial bridge for test purpose. From this trial construction, we verified constructability and structural performances of this deck system.

  • PDF

Development of intermediate roll which has a long life for cold rolling mills (냉간압연용 장수명 중간롤 개발)

  • Park Y. C.;Kim B. H.;Kim I. B.;Kim J. T.;KIM H. M.;Lee W. D.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2004.08a
    • /
    • pp.207-215
    • /
    • 2004
  • There are various characteristics called for in work roll and intermediate rolls for cold rolling mills. Among these characteristics, the two main requirements are to ensure the quality of the rolled products and to reduce roll cost. To achieve these needs, resistance to wear, to thermal shock and to contact fatigue are especially important. This paper describes that new material(named DSR1) for intermediate rolls which greatly increases rolling campaign and improves resistance to wear has been developed. DSR1 was successfully manufactured and has been used in the cold rolling mill. It showed that Trial product was homogenous in hardness distribution and sufficient usable diameter. Also in service test, trial product is much more excellent rolling performance than conventional $5\%Cr$.

  • PDF

Stability of Railway Bridge Abutment with Earth Pressure and Internal Friction Angle of Backfill (내부마찰각과 토압 산정방법에 따른 철도교대의 안정성 비교 연구)

  • Choi, Chan Yong;Kim, Hun Ki;Yang, Sang Beom;Kim, Byung Il
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.6
    • /
    • pp.765-776
    • /
    • 2016
  • In this study, a standard section of a railway bridge abutment wall was designed to satisfy the external stability condition in accordance with the design criteria; this design was used to compare and analyze the active earth pressure and to calculate various types of earth pressure acting on the virtual back (wall, plane) according to the frictional angle of the backfill materials. Also, the external stability, member force and construction cost were analyzed according to the frictional angle of the backfill materials using various theories of earth pressure such as Rankine, Coulomb, Trial Wedge, and Improved Trial Wedge. As for the results, it was found that lateral earth pressure at the virtual back plane was higher than at the virtual back wall, and that these values decreased with the increase of the frictional angle of the backfill materials. The increasing of the frictional angle of the backfill materials decreased the active earth pressure (according to Rankine, Coulomb, Trial Wedge, and Improved Trial Wedge results), and the member force as well as the construction cost were reduced.

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF