• Title/Summary/Keyword: Trenching depth

Search Result 8, Processing Time 0.022 seconds

Effects of Trenching Depth on Tuber Characteristics and Yield in Dioscorea opposita Thunb (Trench 깊이가 마 괴경의 특성과 수량에 미치는 영향)

  • Park, Sang-Gu;Kang, Dong-Kyoon;Kim, Young-Hyo;Chung, Sang-Hwan;Choi, Boo-Sull
    • Korean Journal of Medicinal Crop Science
    • /
    • v.7 no.3
    • /
    • pp.167-171
    • /
    • 1999
  • This experiment was conducted to determine effects of trenching depth on characteristics and yield of tubers in Chinese yam (Dioscorea opposita Thunb). Self-propelled trencher, ‘NF-827H’ produced by KAWABE company, was used for trenching. When trenched, tuber's length and weight were longer and heavier, tuber's shape was better, and marketable tuber yield was remarkably increased than those of conventional plowing and soil preparation by a tractor. The size and yield of tubers were greatly enhanced by trenching in long-tuber variety than that in short-tuber variety. The depth of trenching is recommended to be more than 60cm for short-tuber variety and more than 80cm for long-tuber variety considering the size, shape and yield of the tllbers.

  • PDF

Study on Performance Evaluation of Subsea Waterjet Trenching Machine Using Water Tank (수조실험을 통한 해저지반 굴삭용 워터젯 장비의 성능평가에 관한 연구)

  • Na, Kyoung-Won;Jo, Hyo-Jae;Baek, Dong-Il;Hwan, Jae-Hyuk;Han, Sung-Hoon;Jang, Min-Suk;Kim, Jae-Heui
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.6
    • /
    • pp.470-474
    • /
    • 2015
  • The demand for subsea cables and pipelines that transfer marine energy resources onshore has recently increased. Laying these underground after trenching is one engineering method to stabilize exposed subsea cables and pipelines. This experimental study found the optimum conditions for operating two types of waterjet arms mounted on an ROV trencher. A waterjet arm for trenching the seabed was scaled down at a ratio of 1:6, and a comparative analysis was conducted using diverse parameters. The results of this research provide a practical fundamental database to assist in making decisions about the ROV trencher performance in advance.

A Fundamental Study to Estimate Construction Performance of Subsea Waterjet Trenching Machine (해저지반 굴삭용 워터젯 장비의 시공성능 추정에 관한 기초적 연구)

  • Na, Kyoung-Won;Beak, Dong-Il;Hwang, Jae-Hyuk;Han, Sung-Hoon;Jang, Min-Suk;Kim, Jae-Heui;Jo, Hyo-Jae
    • Journal of Navigation and Port Research
    • /
    • v.39 no.6
    • /
    • pp.539-544
    • /
    • 2015
  • There is drift toward moving offshore structures operating sites to deep water that brings subsea systems and types of apparatus to meet more severe environment than onshore. At this moment, climatic condition and seabed state affect trenching efficiency so trenching process is need to make steady progress in a short time. This paper is research on estimation about construction performance of waterjet trenching machine mounted on ROV trencher. Optimal number of nozzles that can maximize trenching efficiency is selected by considering clearance and angle of nozzles through CFD. Then verified effectiveness of waterjet apparatus on the result of trenching depth and velocity by model test analogized performance for construction work of waterjet trenching machine.

Desiccation Characteristics of Dredged Soft Clay by Large Model Test (모형토조시험을 통한 준설매립토의 건조특성에 관한 연구)

  • 정하익;오인규;지성현;이승원;이영남
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.591-596
    • /
    • 2001
  • The purpose of this paper Is to present and discuss some of evaporation and desiccation observed in laboratory experiments under controlled conditions, and is to improve PTM(Progressive Trenching Method) operating technique. PTM is the technically feasible and economically justifiable dewatering and desiccation technique for dredged material containment areas. A series of laboratory experiments with large model test were carried out to get evaporation rate and strength increase. Surface desiccation of dredged material is basically changed by evaporation characteristics which is controlled by weather and trench type, etc. This study shows that trench depth and rain fall are important factors in desiccation of dredged soft clay.

  • PDF

Antitank Mine Detection with Geophysical Prospecting (물리탐사를 이용한 대전차 지뢰 탐지)

  • Cho, Seong-Jun;Kim, Jung-ho;Son, Jeong-Sul;Bang, Eun-Seok;Kim, Jong-Wook
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.219-224
    • /
    • 2007
  • We conducted geophysical surveys to detect antitank mine at Namji-eup, Gyeongsangnam-do which had been installed during Korean war. The surveys consisted of 2 stages, at the first stage we divided the survey area into 7 block and carried out magnetic gradient survey and GEM-3 EM survey sequentially for each block. Hence we verified anomaly areas using an excavator and a metal detector. Most of anomalies were found to be garbages such as trash cans, metallic wastes, and so on. And also, the concrete pipe was found at depth of 1 m, which had not referred in any report of that area. At the second stage, after trenching the covered soil down to 75 cm the same surveys were conducted. We could not find the strong signal to be inferred from a antitank mine, but we pointed out some anomalies to need careful handling because demining is very dangerous work even though there is few possibility that is mine.

  • PDF

A Study on Excavation Path Design of Excavator Considering Motion Limits (실차의 거동한계를 고려한 굴착기의 굴착 경로설계 연구)

  • Shin, Dae Young
    • Journal of Drive and Control
    • /
    • v.18 no.2
    • /
    • pp.20-31
    • /
    • 2021
  • An excavator is a construction machine that can perform various tasks such as trenching, piping, excavating, slope cutting, grading, and rock demolishing. In the 2010s, unmanned construction equipment using ICT technology was continuously developed. In this paper, the path design process was studied to implement the output data of the decision stage, and the path design algorithm was developed. For example, the output data of the decision stage were terrain data around the excavator, excavator mechanism information, excavator hydraulic information, the position and posture of the bucket at key points, the speed of the desired bucket path, and the required excavation volume. The result of the path design was the movement of the hydraulic cylinder, boom arm, bucket, and bucket edge. The core functions of the path design algorithm are the function of avoiding impact during the excavation process, the function to calculate the excavation depth that satisfies the required excavation volume, and the function that allows the bucket to pass through the main points of the excavation process while maintaining the speed of the desired path. In particular, in the process of developing the last function, the node tracking method expressed in the path design table was newly developed. The path design algorithm was verified as this path design satisfied the JCMAS H02 requirement.

Ammonium Nitrate Explosion Technique for the Establishment of Orchard (산지과수(山地果樹)의 재식(栽植)을 위(爲)한 폭약이용(爆藥利用)에 관(關)한 연구(硏究))

  • Yoo, S.H.;Koh, K.C.;Park, M.E.
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.12 no.4
    • /
    • pp.169-178
    • /
    • 1980
  • Ammonium nitrate explosion technique was applied to seek a convenient method for the establishment of orchard on the undulating to rolling land or hill side of Pogog clay loam soil (Fine Aquic Fragiudalfs : Planosols) having high bulk density and low permeability. Explosions were made by three ammonium nitrate explosives placed in the bottom of 90cm deep auger hole with every 2m interval (Explosion I) and 4m interval (Explosion II) respectively. The effect of the explosion on physical properties of the soil was investigated and compared with the effect induced by manual digging, excavation of $1m{\times}1m$ in diameter and depth (Manual digging I) and trenching of $1m{\times}1m{\times}25m$ in width, depth, and length (Manual digging II) respectively. The results investigated after 7 months from the treatments are summarized as follows : 1. The explosion or manual digging reduced bulk density and hardness, whereas the treatments increased porosity, hydraulic conductivity, and available moisture-holding capacity of the soil. 2. The explosion of 4 m interval improved physical properties of the soil to optimum level up to 70cm of the distance from the explosion core in the range of depth 0-60cm, while in the case of depth from 60 to 100cm the optimum level was achieved only within 50cm radius. 3. When exploded in 2 m interval, the effect in the 0-60cm depth was overlapped between two explosion cores. The effect in the depth between 60 and 100cm, however, was found to be independent of the explosion intervals. 4. The manual digging was only costly and laborious but effective only within the work-up zone. 5. For the soils having bulk density higher than $1.4g/cm^3$ after the treatments, the field capacity determined 72 hours after a heavy rain was lower than the laboratory estimate at the suction of 1/3 atm. 6. The top growth of apple tree for the first year revealed that the explosion seemed better treatment than the manual digging, even though the difference was insignificant.

  • PDF

Gravity Field Interpretation and Underground Structure Modelling as a Method of Setting Horizontal and Vertical Zoning of a Active Fault Core (활성단층의 3차원적인 규모를 결정하기 위한 중력장 데이터의 해석 및 지각구조 모델링: 양산단층에서의 예)

  • Choi, Sungchan;Kim, Sung-Wook;Choi, Eun-Kyeong;Lee, Young-Cheol;Ha, Sangmin
    • Economic and Environmental Geology
    • /
    • v.54 no.1
    • /
    • pp.91-103
    • /
    • 2021
  • In order to estimate the vertical and horizontal structural in the Yangsan fault core line (Naengsuri area, Pohang), we carried out gravity field measurements and interpretation procedures such as Euler deconvolution method and curvature analysis in addition to the forward modelling technique (i.e. IGMAS+). We found a prominent gravity difference of more than 1.5 mGal across the fault core. This indicates a distinct density difference between the western and eastern crustal area across the Yangsan fault line. Comparing this gravity field interpretation with other existent geologic and geophysical survey data (e.g. LiDAR, trenching, electric resistivity measurements), It is concluded that (1) the prominent gravity difference is caused by the density difference of about 0.1 g/㎤ between the Bulguksa Granite in the west and the Cretaceous Sandstone in the east side, (2) the fault core is elongated vertically into a depth of about 2,000 meters and extended horizontally 3,000 meters to the NNE direction from Naengsuri area. Our results present that the gravity field method is a very effective tool to estimate a three -dimensional image of the active fault core.