• Title/Summary/Keyword: Treatment Plant

Search Result 6,969, Processing Time 0.035 seconds

Effect of the Cold Treatment Period on a Plant's Dormancy Breaking in the Winter Production of Gomchwi's New Varieties (Ligularia fischeri (Ledeb.) Turcz)

  • Suh, Jong Taek;Kim, Ki Deog;Kim, Su Jeong;Sohn, Hwang Bae;Hong, Su Young;Kim, Yul Ho
    • Korean Journal of Plant Resources
    • /
    • v.32 no.6
    • /
    • pp.683-688
    • /
    • 2019
  • This study was conducted to determine the number of days required to break a plant's dormancy and promote subsequent crop growth in new varieties of Gomchwi through the 4℃ treatment. Three new varieties of Gomchwi namely, 'Sammany', 'Gommany', and 'Damogy' were observed in this study. The rate of leaf emergence of 'Sammany' after 15-day of 4℃ treatment was 100%, while 'Gommany', and 'Damogy' took 20-days and 10-days, respectively to reach to 97.9% rate of leaf emergence. After 10-days of 4℃ treatment, 'Damogy' grew faster than the other varieties. and Harvest time for 'Damogy' was on January 18th, after 5-days of 4℃ treatment and yield was observed to be the highest at 15-days of 4℃ treatment. 'Sammany' was next with a minimum of 10-days of 4℃ treatment, although 15-days is more preferred for better harvest. 'Gommany' on the other hand, did not grow enough for harvest by January 18th, and its harvest time was delayed to January 31st. It needed a minimum of 15-days and preferentially 20-days of 4℃ treatment to grow normally and be ready for harvest. The plant height, leaf length and leaf petiole length appeared to grow better by extending duration of the 4℃ treatment. The number of leaves of 'Sammany' and 'Gommany' varieties was three leaves for the 5-days treatment which may be due to the incomplete breaking of dormancy. Regarding the yield per plant, 'Sammany' yielded 112.3 grams (g) in 15-days treatment, and 'Gommany' yielded 106.5 g in 25-days treatment. In the case of 'Damogy', it yielded 123.5 g and 183 g in the 10-days and 25-days treatment respectively. It is concluded that 'Damogy', 'Sammany' and 'Gommany requires 10, 15, and 20 days of 4℃ treatment to break the plant's dormancy and promote better plant growth.

Effects of Gibberellin Biosynthetic Inhibitors on Oil, Secoisolaresonolodiglucoside, Seed Yield and Endogenous Gibberellin Content in Flax

  • Kim, Sang-Kuk;Kim, Hak-Yoon
    • Korean Journal of Plant Resources
    • /
    • v.27 no.3
    • /
    • pp.229-235
    • /
    • 2014
  • Flax (Linum usitatissimum L.) has been used for the edible oil in Korea. The evaluate the effect of plant growth retardants on flaxseed yield, oil content, and gibberellin level, chloromequat chloride (CMC), paclobutrazol (PBZ), and prohexadione-Ca (PHC) were used as plant growth retardants in this study. These plant growth retardants were foliar-sprayed to flax plant at 55 days after seeding. The concentrations of each plant growth retardant were as followed: CMC 250, 500, 1000 ppm, PBZ 40, 80, 160 ppm and PHC 500, 1000, 2000 ppm. PHC treatment to forming bolls was more stimulated than CMC and PBZ. The highest ripened seed rate was observed in PHC treatment at 2000ppm. The high see yields were obtained in PHC treatment following PBZ and CMC, in turn. Seed yield that significantly increased in PBZ and PHC was found to be increased 12.4 ~ 23.9% as compared to the control. The PHC showed higher flaxseed production and oil yield than that of CMC and PBZ. The results obtained in the present study suggest that higher concentration of plant growth retardant (PHC) increased flaxseed yield and oil content. The optimal concentration of PHC treatment was observed in 2000 ppm. It concludes that the foliar application of PHC 2000 ppm may be useful for the increasing oil and higher seed production in flax plants.

Performance Anaysis of Small Hydropower Plant Using Treated Effluent in Wastewater Treatment Plant (하수처리장 방류수를 이용한 소수력발전 성능분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.494-497
    • /
    • 2012
  • A methodology to predict the output performance of small hydro power using treated effluent in wastewater treatment plant has been studied. Existing plant located Kyunggi-Do were selected and the output performance characteristics for these plants were analyzed. As a result, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power in wastewater treatment plant. Additionally, primary design specifications such as design flowrate, capacity, operational rate and annual electricity production were estimated and discussed.

  • PDF

The Case Studies of Artificial Intelligence Technology for apply at The Sewage Treatment Plant (국내 하수처리시설에 인공지능기술 적용을 위한 사례 연구)

  • Kim, Taewoo;Lee, Hosik
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.4
    • /
    • pp.370-378
    • /
    • 2019
  • In the recent years, various studies have presented stable and economic methods for increased regulations and compliance in sewage treatment plants. In some sewage treatment plants, the effluent concentration exceeded the regulations, or the effluent concentration was manipulated. This indicates that the process is currently inefficient to operate and control sewage treatment plants. The operation and control method of sewage treatment plant is mathematically dealing with a physical and chemical mechanism for the anticipated situation during operation. In addition, there are some limitations, such as situations that are different from the actual sewage treatment plant. Therefore, it is necessary to find a more stable and economical way to enhance the operational and control method. AI (Artificial Intelligence) technology is selected among various methods. There are very few cases of applying and utilizing AI technology in domestic sewage treatment plants. In addition, it failed to define specific definitions of applying AI technologies. The purpose of this study is to present the application of AI technology to domestic sewage treatment plants by comparing and analyzing various cases. This study presented the AI technology algorithm system, verification method, data collection, energy and operating costs as methods of applying AI technology.

Differential Growth Response and Gene Expression in Relation to Capsidiol Biosynthesis of Red Pepper Plant and Cultured Cells by γ-Ray and UV Stress (방사선과 자외선에 대한 고추 식물체 및 배양세포의 생장반응과 Capsidiol 생합성 유전자의 발현 차이)

  • An, Jung-Hee;Kim, Jae-Sung;Jeong, Jeong-Hag;Oh, Sei-Myoung;Kwon, Soon-Tae
    • Journal of Plant Biotechnology
    • /
    • v.30 no.2
    • /
    • pp.201-206
    • /
    • 2003
  • Differential responses of red pepper plant and cultured cells to enhanced ${\gamma}$-ray($^{60}$ Co) and ultraviolet(UV) stress were investigated. In seed treatment, 1 Gy of ${\gamma}$-ray increased seedling dry weight up to 19.1%, but 50 Gy treatment markedly ingibited seed germination and subsequent growth of seedling. UV treatment to seed did not change the germination ability of seeds and the growth of seedlings regardless of duration of UV treatment until 24 hrs. In case of UV treatment to seedlings, plant injury was seriously progressed even after the seedlings were returned to no UV condition, and eventually all the leaves showed chlorosis by the stress. However, progress of plant injury by ${\gamma}$-ray stress slower than that caused by UV stress, and even at the high dose of ${\gamma}$-ray 50 Gy, did not caused the cholrosis of stressed plant leaf. Amount of electrolytes leakage from plant leaf by UV treatment for 24hrs was increased up to 28.8 folds in comparison with untreated control, whereas that of 50 Gy of ${\gamma}$-ray was increased only 1.2 folds. UV stress induced the production of capsidiol, antimicrobial phytoalexin, by activation of gene expression involved in capsidiol biosynthesis, such as sesquiterpene cyclase and cyclase and cytochrome P450 hydroxylase in the leaf and cultured cell, but ${\gamma}$-ray stress induced neither the production of capsidiol nor expression of the genes.

The Effect of the Formaldehyde Removal of Fore Temperate Ground Cover Plants (4가지 온대성 지피식물의 실내 포름알데이드 제거효과)

  • Ju, Jin-Hee;Bang, Kwang-Ja;Lee, Jin-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.2 s.121
    • /
    • pp.49-54
    • /
    • 2007
  • This research was performed to investigate the effect of formaldehyde removal and confirm the utility of plants as indoor environment improvement systems. The plant materials used in this study were Fatsia japonica, Ardisia japonica, Ardisia pusilla and Davallia mariesii. Plants were placed in an airtight chamber under artificial formaldehyde. The initial formaldehyde concentration in the chamber was $500{\pm}30ppb$, and the conditions of $1,500{\sim}2,000lux$ light, $25{\pm}5^{\circ}C$ temperature and $80{\sim}90%$ humidity were maintained. Each chamber was treated as no plant, plant-only and Plant+soil. The total leaf number for Davallia mariesii, Ardisia japonica, Ardisia pusilla, and Fatsia japonica was 40.8, 48.6, 62.3, and 11.8 respectively. The total leaf space n of those plant materials were $2,385cm^2,\;1,252cm^2,\;2,468cm^2\;and\;1,262cm^2$ respectively. The formaldehyde concentration was reduced to $80{\sim}90%$ of the initial concentration in plant-only and Plant+Soil treatment chamber of all species in 12 hours. In the plant-only chamber, Fatsia japonica had removed formaldehyde density by 95% after 12 hours while Ardisia japonica had removed 90%. In the case of Ardisia pusilla, the early removal rate was higher in the plant-only treatment chamber than the Plant+Soil treatment chamber. The formaldehyde removal rate of Davallia mariesii was 98% after 12 hours. In the Plant+Soil treatment chamber, the amount of removal of formaldehyde per time of Davallia mariesii, Ardisia japonica, Ardisia pusilla, and Fatsia japonica was 20.42ppb/hr, 16.28ppb/hr, 2.5.42ppb/hr, 10.28ppb/hr respectively. In the plant-only, That was 22.50ppb/hr, 20.97ppb/hr, 20.83ppb/hr, 20.97ppb/hr respectively.

Life Cycle Assessment for the Business Activities of Green Company -2. Mass Balance and Environmental Improvement (녹색기업의 사업활동 전 과정에 대한 환경성 평가 -2. 물질수지 및 환경개선)

  • Shin, Choon-Hwan;Park, Do-Hyun
    • Journal of Environmental Science International
    • /
    • v.22 no.4
    • /
    • pp.425-433
    • /
    • 2013
  • A mass balance of process was calculated by using the analysis of basic unit and environmental assessment of all the processes of Busan fashion color industry cooperative that operates a combined heat and power plant and a bio treatment plant. The mass balance for the combined heat and power plant was done, based on boiler and water treatment processes while each unit reactor was used for the bio treatment plant. From the results above, a resource recycle network, a treatment flowchart for food waste water/wastewater treatment and a carbon reduction program were established.

LAND FARMING OF WATER PLANT ALUM SLUDGE ON ACID MINERAL SOIL AFFECTED BY ACID WATER

  • Lee, Seung-Sin;Kim, Jae-Gon;Moon, Hi-Soo;Kang, Il-Mo
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2001.04a
    • /
    • pp.182-186
    • /
    • 2001
  • An acid forest surface soil as a land farming medium was treated with a water plant alum sludge at 0 to 18%. Indian mustard was grown in the treated soil in a greenhouse for 5 weeks and watered with pH 4 tap water adjusted with a mixed acid (1HNO$_3$: 2H$_2$SO$_4$) during plant growth. Changes in soil property, leachate chemistry, plant growth, and plant uptake of elements by the sludge treatment were determined. The alum sludge treatment increased buffer capacity to acidity, hydraulic conductivity, water holding capacity, and phosphate adsorption of the soil and decreased bulk density and mobility of small particles. The sludge treatment reduced leaching of Al, Mg, K, Na, and root elongation. Plant did uptake less amount of the cations and P but more Ca with the sludge treatment.

  • PDF

A process diagnosis method for membrane water treatment plant using a constant flux membrane fouling model (정유량 막여과 파울링 모델을 이용한 막여과 정수 플랜트 공정 진단 기법)

  • Kim, Suhan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.139-146
    • /
    • 2013
  • A process diagnosis method for membrane water treatment plant was developed using a constant flux membrane fouling model. This diagnosis method can be applied to a real-field membrane-based water treatment plant as an early alarming system for membrane fouling. The constant flux membrane fouling model was based on the simplest equation form to describe change in trans-membrane pressure (TMP) during the filtration cycle from a literature. The model was verified using a pilot-scale microfiltraton (MF) plant with two commercial MF membrane modules (72 m2 of membrane area). The predicted TMP data were produced using the model, where the modeling parameters were obtained by the least square method using the early plant data and modeling equations. The diagnosis was carried out by comparing the predicted TMP data (as baseline) and real plant data. As a result of the case study, the diagnsis method worked pretty well to predict the early points where fouling started to occur.

Comparative performance evaluation of two UF pilot plants at the Alto da Boa Vista WTP (São Paulo, Brazil)

  • Oliveira, T.F.;Mierzwa, J.C.
    • Membrane and Water Treatment
    • /
    • v.2 no.3
    • /
    • pp.175-185
    • /
    • 2011
  • Ultrafiltration is an emerging technology for drinking water treatment because it produces better water quality as compared with conventional treatment systems. More recently, the combination of UF technology with other processes in order to improve its performance has been observed. These associations aim to maximize the contaminants removal and reduce membrane fouling. The operational performance of contaminants removal and water production of two UF pilot plants was compared. The first plant (Guarapiranga) was fed with raw water and the second plant (ABV) with pre-treated water by the coagulation, flocculation and sedimentation processes at Alto da Boa Vista WTP (Sao Paulo, Brazil). Both units operated continuously for approximately 2,500 hours, from September/2009 to January/2010. The results showed that the ABV UF pilot plant was able to operate at higher specific fluxes (6.2 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$) than Guarapiranga (3.1 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$). However, the number of chemical cleanings conducted in both pilot units during the considered operation period was the same (4 chemical cleanings for each plant), which shows that the pre-treatment reduced the membrane fouling. The water quality at ABV for all the variables analyzed was better, but the feed water quality was also better due to pretreatment. The rejection values for the different contaminants were higher at Guarapiranga mainly because of a pollution load reduction after pre-treatment at ABV. Even with the better performance of the ABV UF pilot plant, it is necessary to take into consideration the complexity of the complete treatment system, and also the costs involved in the construction and operation of a full-scale treatment unit.