• Title/Summary/Keyword: Transport Plan

Search Result 452, Processing Time 0.023 seconds

Structures and Information Technologies in CVO (첨단화물운송시스템(CVO)의 구성과 관련기술)

  • Ahn, Seung-B.;Byeon, Eui-Seok
    • IE interfaces
    • /
    • v.11 no.1
    • /
    • pp.41-53
    • /
    • 1998
  • The Korean government has made efforts to establish ITS (Intelligent Transport System) strategic plans and to implement ITS. Commercial Vehicle Operation (CVO) has been developed in Korea as one of five subsystems in ITS and also in the context of Integrated Logistics Information Systems (ILIS). A low-level strategic plan of CVO is fixed on October, 1997, which has two subsystems and six major services. In this paper, services, requirements and information technologies for CVO are introduced as well as operational tests, deployment cases and cost-effectiveness.

  • PDF

Improvement of NGIS Project Assessment (국가공간정보 사업평가 개선방안에 관한 연구)

  • Kim, Tae-Hoon;Kang, Jin-A;Choi, Hyun-Sang
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.107-109
    • /
    • 2010
  • The MLTM(Ministry of Land, Transport and Maritime Affairs) has been performed NGIS project Assessment every year. But it has a couple of problems which are contents of assessment and the time of dealing in the assessment system. Considering the driven conclusions, this study proposed the improvement plan of NGIS project Assessment.

  • PDF

The Present Safety Plan for Railway Vehicles and Strategies for Improvement (철도차량의 안전대책 현황과 안전성 향상 방안)

  • Choi Sunghoon;Lee Chan-Woo
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.774-777
    • /
    • 2003
  • Importance of railway safety has drawn much attention with the growth of its contribution to the modernized society as a massive transport, high speed transportation system. Hence, safety regulations and organizations for railway vehicles are reviewed. The present status of domestic metro transit system is considered and compared with that of foreign countries. Some controversial points are raised and countermeasures are proposed.

  • PDF

A study on the connected service of urban railway (도시철도의 연결방안에 관한 고찰 -해외사례를 중심으로-)

  • 후지타다카요씨
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.100-105
    • /
    • 2002
  • Now operating of many urban railway lines are currently in progress in tile Seoul, but the inadequate consideration of links between different lines could create inconvenience as the public transport. This paper is studied about the connection design of urban-railway service convinced for other metropolis railways forms and propose the base pilot plan of the railway network linking system in Seoul Metropolis.

  • PDF

A Study on Network Based Traffic Signal Optimization Using Traffic Prediction Data (교통예측자료 기반 Network 차원의 신호제어 최적화 방안)

  • Han, Jeong-hye;Lee, Seon-Ha;Cheon, Choon-Keun;Oh, Tae-ho;Kim, Eun-Ji
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.6
    • /
    • pp.77-90
    • /
    • 2015
  • An increasing number of vehicles is causing various traffic problems such as chronic congestion of highways and air pollution. Local governments have been managing traffic by constructing systems such as Intelligent Transport Systems (ITS) and Advanced Traffic Management Systems (ATMS) to relieve such problems, but construction of an infrastructure-based traffic system is insufficient in resolving chronic traffic problems. A more sophisticated system with enhanced operational management capabilities added to the existing facilities is necessary at this point. As traffic patterns of the urban traffic flow is time-specific due to the different vehicle populations throughout the time of the day, a local network-wide signal operation plan that can manage such situation-specific traffic patterns is deemed to be necessary. Therefore, this study is conducted for the purpose of establishment of a plan for contextual signal control management through signal optimization at the network level after setting the Frame Signal in accordance to the traffic patterns gathered from the short-term traffic forecast data as a means to mitigate the problems with existing standardized signal operations.

A Systematic Approach to Port related Problems An Analysis on the Actual Condition of physical Distribution System of Pusan port (항만관련문제의 시스템적 고찰 부산항 물류시스템의 실태분석)

  • Lee Cheol-Yeong;Moon Seong-Hyeok
    • Journal of Korean Port Research
    • /
    • v.2 no.1
    • /
    • pp.7-28
    • /
    • 1988
  • From the viewpoint of physical distribution, the port transport process can be regarded as a system which consists of various subsystems such as navigational aids, quay handling, transfer, storage, information If management, and co-ordination with inland transport. The handling productivity of this system is determined by the production level of the least productive subsystem. So, a productivity analysis on the flow of cargoes through each subsystem should be made in order to achieve efficient port operation. The purpose of this paper is to analyze the productivity of each subsystem in Pusan port, and to bring forward problems and finally to draw up plans for their betterment. Analyzed results on the productivity of each subsystem are as follows, i) It is known that the number of tugs with low HP should be increased by a few, the number of tugs with medium HP is appropriate, and the number of tugs with high HP is in excess of that necessary. ii ) In the case of container cargoes, it is found that the transfer and storage systems in BCTOC have the lowest handling capability, with a rate of $115\%$, leading to bottle-necks in the port transport system, while the handling rate of the storage and quay handling systems in general piers is in excess of the inherent capability. iii) In the case of the principal seaborne cargoes passing through general piers, there is found to be a remarkable bottle-neck in the storage system. In the light of these findings, both the extension of storage capability and the extension of handling productivity are urgently required to meet the needs of port users. Therefore, iv) As a short-term plan, it is proposed that many measures such as the reduction of free time, the efficient application of ODCY, etc must be brought in and v) In the long-trun, even though the handling capability will accommodate an additional 960,000 TEU in 1991, the scheduled completion date of the third development plan of Pusan port, insufficiency of handling facilities in the container terminal is still expected and concrete countermeasures will ultimately have to be taken for the port's harmonious operation. In particular, the problem of co-ordination with inland transport and urban traffic should be seriously examined together in the establishment of the Pusan port development. As a method of solving this, vi) It is suggested that Pusan port (North port) should be converted into an exclusive container ternimal and overall distribution systems to the other ports for treating general cargoes must be established. vii) And finally, it is also proposed that the arrival time (cut-off time) of influx cargoes for exports such as general merchandise and steel product should be limited, with a view to securing cargoes suitable for the operational capability of BCTOC.

  • PDF

A Study on the Environmental Enhancement of the Development Restricted Zone(DRZ) Management Plan (개발제한구역관리계획의 환경성 강화방안 연구 - 수도권 개발제한구역관리계획을 대상으로 -)

  • Sung, Hyun-Chan;Jeon, Seong-Woo;Lee, Eun-Jeong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.23 no.6
    • /
    • pp.1-14
    • /
    • 2020
  • Under the 「National Land Planning and Utilization Act」, Development Restriction Zones(DRZ) is one of the designated use district where the Minister of Land, Infrastructure and Transport deems it necessary to control urban development in order to prevent urban sprawl and conurbation and ensure a healthy living environment for citizens by conserving the natural environment surrounding metropolitan cities. DRZ was first designated around the Seoul Metropolitan city in 1971, and had been expanded to the 14 metropolitan areas across the country since 1977. The designated areas were accounted for about 5.4% of the total national land and its importance was demonstrated by contributing to control urban sprawl, curbing real estate speculation, and providing green space to citizens. However, DRZ has been repeatedly relaxed its regulations and allowed development under government. As a result, much of the green areas was damaged and several cities were merged and extended(conurbation). In particular, deregulation implemented for the purpose of securing land as part of national projects and local outstanding business(i.g. constructions of national rental housing, industrial complex, and international stadium) have caused continuous environmental damage around the metropolitan cities. In addition, the habitat fragmentation is in serious situation. Thus, the systematic plans for managing DRZ are necessary, since it is concerned that urban environment become deteriorate in the mid- to long-term. This study aims to continuously protect the urban environment from lifting DRZ. Therefore, firstly, we examined the environmental status through analyzing DRZ Management Plan which shall be drawn up by the Special Metropolitan City Mayor, the Metropolitan City Mayor or the Mayer/Do governor having jurisdiction, every five years to collectively manage DRZ. Secondly, we investigated the actual condition in DRZ based on the case study of Management Plan in Metropolitan areas(i.e. Seoul Metropolis, Gyeonggi-do, and Incheon Metropolis). Finally, we suggested the seven feasible improved political plan for managing DRZ.

A Study on the Suitability Analysis of Tunnel Access Control for Hazardous Materials Transport Vehicles on the Expressway (위험물질 수송차량의 고속도로 터널통행규제 분석 연구)

  • Hong, Jung Yeol;Choi, Yoon Hyuk;Park, Dong Joo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.3
    • /
    • pp.18-31
    • /
    • 2018
  • Since accidents of hazardous material transport vehicle on roadways cause severe damage in the form of disaster, foreign countries have long been engaged in systematic management and establishment of relevant laws and policies for the road safety. Recently, over 10-kilometer long tunnel, such as Inje-Yangyang Tunnel and Geumjeongsan Tunnel, has been opened on the expressway and the production of various hazardous materials is increasing with the development of chemical technology. However, road laws related to the safe operation of hazardous materials transport vehicles are still lacking, and policy measures for managing them have not been specified. It is an important task to recognize the risk of accidents of hazardous material transport vehicles and to secure road safety by establishing a management plan for road managers. Therefore, this study analyzed the feasibility of the traffic regulation of expressway tunnel in South Korea and suggested a direction for management. The results of this study can be utilized as the primary data for the revision of law related to hazardous materials transport vehicles on roadways and the derivation of optimal route of hazardous materials transport vehicles.

A Study on the standardization of ETCS (Focused on RF) (자동요금징수시스템(ETCS) 표준화 연구(주파수방식을 중심으로))

  • Kwon, Han-Joon;Lee, Ki-Hyun;Kim, Yong-Deak
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.3
    • /
    • pp.62-73
    • /
    • 2008
  • In this paper, domestic standard revision plan of dynamic frequency method which is used both in unmanned automatic toll collection system and manned collection system of the express highway is presented. For such ETCS, the infrared rays (870 nm) of active frequency method and the frequency integrated method (5.8 GHz) are adopted and extended to be operated to the all around the Toll Gate. This standardization plan is based on inter connection reference model between OSI (Open System Interconnection) in process of ITS short range radio communication standardization of 5.8 GHz bandwidth to support traffic information and control system service, and the derived revision plan by starting from physical layer which support interoperability for multiple access between RSE (Road Side Equipment) and OBE (On Board Equipment), in which is categorized into physical layer, data link layer, and application layer. In case of radiation power, existing standard is divided by class1 (within 10 m) and Class2 (within 100 m) according to transmission lengthwhile it is operated with just single standard 'Class1' because of notification of Ministry of Information and Communication in 2004. In the case of the limitation value of incident power in communication area, considering operation plan of ETCS that is on actuality operation the measurements are reflected to the standard. In other wort this paper proposed the improvement standard of incident power, pseudo response in the communication area and radiated power in order to secure stability and compatibility among operator systems about the needed part on ETCS operation.

  • PDF

Research on the Plans of Construction Information for National Infrastructure in Public Construction Projects (공공건설사업에서의 국가기반시설 건설정보 서비스 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.12
    • /
    • pp.1026-1035
    • /
    • 2013
  • The construction field is implementing cost savings and business process improvements by adopting and applying various information technologies to secure the construction sector's technological competitiveness amid the economic recessions inside and outside South Korea. Therefore, affiliated agencies of the Ministry of Land, Infrastructure, and Transport are reinforcing transparency and efficiency in construction project management through informatization. These agencies are also performing construction project management and maintenance and management businesses by constructing various information systems to create higher added values and secure competitiveness. However, as the application of the constructed information system is limited to a portion of public construction projects, it is not yet possible to understand the whole status of the national infrastructures. Therefore, this paper aims to propose a construction information service plan, its future promotion method and procedure of application on the entire national infrastructures. This plan would be carried out by collecting, linking and fabricating the main construction information from the information systems of the affiliated agencies around the construction project information system(Construction CALS System) being applied at the organizations under the Ministry of Land, Infrastructure, and Transport. Such a plan is expected to facilitate effective project management and maintenance of public construction projects and serve as a useful tool for major decision making endeavors such as future policy planning. The proposed plan is also expected to facilitate the management and application of construction information from the construction up to the maintenance management of the national infrastructures.


(34141) Korea Institute of Science and Technology Information, 245, Daehak-ro, Yuseong-gu, Daejeon
Copyright (C) KISTI. All Rights Reserved.