송변전지리정보시스템(TGIS) 개발 추진현황 및 향후과제 (Development of Transmission & Substation Geographic Information System)

  • 안태형;문봉수;권오형
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.575-577
    • /
    • 2005
  • KEPCO has developed Transmission & Substation Geographic Information System(TGIS) since 2000. TGIS is the system for the management of transmission and substation facilities on the geographic basis. This paper provides a brief introduction to TGIS.

  • PDF

송변전 지리정보 시스템을 이용한 고압 송전선과 거주지 간 이격거리에 대한 인식 평가 (Evaluating the Perception of Distance to High-Voltage Power Lines from Home Using Transmission and Substation Geographic Information System)

  • 옥민수;이무송;전보민;김화정;류현미;명성호;민석원
    • 한국전자파학회논문지
    • /
    • 제26권7호
    • /
    • pp.646-655
    • /
    • 2015
  • 이번 연구에서는 송변전 지리정보 시스템(Transmission and substation Geographic Information System: TGIS)을 이용하여 일반인들이 판단한 고압 송전탑 및 송전선, 변전소와 거주지 간 거리 인식이 실측 거리와 일치하는지 확인해 보았다. 총 725명의 응답자 중 136명이 고압 송전탑 및 송전선, 변전소가 눈에 보이는 거리에 있다고 응답하였고, 이 중 114명이 TGIS로 분석할 수 있는 유효한 주소를 제공하였다. 114명 중 42명(36.8 %)은 실측 거리보다 인식 거리가 짧았으며, 15명(13.2 %)은 인식 거리보다 실측 거리가 짧았다. 일반인들의 고압 송전탑 및 송전선, 변전소와 거주지 간 거리 예측의 타당도가 높지 않은 점을 바탕으로 했을 때, 이를 극저주파 전자기장 노출량의 대용물로 사용하는 것은 부적절할 것으로 보인다.

송변전설비 전력영향평가 시스템 개발 (Development of electric power effect estimation system of Transmission Line & Substation)

  • 백승도;김태영;민병욱;김왕주;최진성;김신철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.444-445
    • /
    • 2006
  • The proposed site selection for transmission system construction is applied by KEPCO's regulation of the site selection criteria and it is confirmed through the deliberation of site selection committee and talking with local authority, by means of study on Present status and site survey, to verify impediment of national land use and development plan. Therefore, it is true that KEPCO has difficulty in timely completion of power facility construction because of civil appeals due to insufficiently evaluate resistance factor of stakeholder and stubborn resistance of inhabitants. This paper describes the PEES(power effect estimation system) which contributed to timely completion of transmission system construction to solve the above difficulty by utilizing IT(Information Technology) such as GIS(Geographic Information System) and LiDAR for the proposed site section. PIES evaluates project impacts on commencement of construction and finds out counter measures then makes public construction information after prediction and analysis of stakeholder's resistance factor.

  • PDF