Development of Transmission & Substation Geographic Information System (송변전지리정보시스템(TGIS) 개발 추진현황 및 향후과제)

  • Ahn, Tae-Hyung;Moon, Bong-Soo;Kwon, Oh-Hyung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.575-577
    • /
    • 2005
  • KEPCO has developed Transmission & Substation Geographic Information System(TGIS) since 2000. TGIS is the system for the management of transmission and substation facilities on the geographic basis. This paper provides a brief introduction to TGIS.

  • PDF

Evaluating the Perception of Distance to High-Voltage Power Lines from Home Using Transmission and Substation Geographic Information System (송변전 지리정보 시스템을 이용한 고압 송전선과 거주지 간 이격거리에 대한 인식 평가)

  • Ock, Minsu;Lee, Moo-Song;Jeon, Bomin;Kim, Hwa Jung;Ryu, Hyun Mi;Myung, Sung-Ho;Min, Suk Won
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.26 no.7
    • /
    • pp.646-655
    • /
    • 2015
  • The purpose of this study was to evaluate the perceived distance from home to high-voltage power lines using a transmission and substation geographic information system(TGIS). Of the 725, 136 respondents reported that high voltage power transmission tower, power lines or substation was within visual field range from home. Among them, 114 respondents reported valid address, which could be used in the analysis of TGIS. Forty two respondents(36.8 %) estimated that the power lines were closer and 15 respondents(13.2 %) estimated that they were farther than they actually were. Our current findings suggest that the reported distance from home to high-voltage power transmission towers, power lines, and substations cannot be used as a proxy for exposure to electromagnetic fields due to the low validity.

Development of electric power effect estimation system of Transmission Line & Substation (송변전설비 전력영향평가 시스템 개발)

  • Baik, Seung-Do;Kim, Tai-Young;Min, Byeong-Wook;Kim, Wang-Joo;Choi, Jin-Sung;Kim, Shin-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.444-445
    • /
    • 2006
  • The proposed site selection for transmission system construction is applied by KEPCO's regulation of the site selection criteria and it is confirmed through the deliberation of site selection committee and talking with local authority, by means of study on Present status and site survey, to verify impediment of national land use and development plan. Therefore, it is true that KEPCO has difficulty in timely completion of power facility construction because of civil appeals due to insufficiently evaluate resistance factor of stakeholder and stubborn resistance of inhabitants. This paper describes the PEES(power effect estimation system) which contributed to timely completion of transmission system construction to solve the above difficulty by utilizing IT(Information Technology) such as GIS(Geographic Information System) and LiDAR for the proposed site section. PIES evaluates project impacts on commencement of construction and finds out counter measures then makes public construction information after prediction and analysis of stakeholder's resistance factor.