• 제목/요약/키워드: Transmission Line Analysis

검색결과 900건 처리시간 0.03초

Electromagnetic Environment of Transmission Line Based on Full Parameter Online Estimation

  • Sun, Zidan;Zhou, Xiaofeng;Liang, Likai;Mo, Yang
    • Journal of Information Processing Systems
    • /
    • 제16권2호
    • /
    • pp.394-405
    • /
    • 2020
  • The parameters of transmission lines have an influence on the electromagnetic environment surrounding the line. This paper proposes a method based on phasor measurement unit (PMU) and supervisory control and data acquisition (SCADA) to achieve online estimation of transmission line full parameters, such as resistance, reactance and susceptance. The proposed full parameter estimation method is compared with the traditional method of estimating resistance independently based on SCADA system. Then, the electromagnetic environment is analyzed based on the different parameter estimation methods. The example results illustrate that online estimation of transmission line full parameters is more accurate in the analysis of electromagnetic environment, which further confirms its necessity and significance in engineering application.

Investigation of Electromagnetic Field Coupling with Twisted Conducting Line by Expanded Chain Matrix

  • Cho, Yong-Sun;Ro, Jong-Suk;Chung, Yong-Seek;Cheon, Changyul;Jung, Hyun-Kyo
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권2호
    • /
    • pp.364-370
    • /
    • 2013
  • In the current paper, we propose a new modeling algorithm to analyze the coupling between an incident electromagnetic field (EMF) and a twisted conducting line, which is a kind of non-uniform line. Typically, analysis of external field coupling to a uniform transmission line (TL) is implemented by the Baum-Liu-Tesche (BLT) equation so that the induced load responses can be obtained. However, it is difficult to apply this method to the analysis of a twisted conducting line. To overcome this limitation, we used a chain matrix composed of ABCD parameters. The proposed algorithm expands the dimension of the previous chain matrix to consider the EMF coupling effectiveness of each twisted pair, which is then applied to multi-conductor transmission line (MTL) theory. In addition, we included a comparative study that involves the results of each method applied in the conventional BLT equation and new proposed algorithm in the uniform two-wire TL case to verify the proposed method.

765kV 2회선 송전선로를 765kV 및 345kV로 병행운전시 유도현상 예측 (Analysis of the electrostatic induction voltage and electromagnetic induction current on the Parallel Circuit in 765kV Double Circuit Transmission Line)

  • 우정욱;심응보;곽주식;전명렬;김기일;김태옥
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.169-171
    • /
    • 2002
  • The western route of KEPCO's 765kV transmission line has been tentatively operating as 345kV voltage before commercial operation. After finishing the test operation of 765kV substation in 2002. KEPCO decided to operate the 765kV line for commercial operation. During the applying of 765kV voltage to the transmission line, double circuit transmission line will be operated with two voltage grades of 765kV and 345kV. Because the earthing switch is installed on both end of transmission line, we had estimated the electrostatic induction voltage and electromagnetic induction current before the line energizing in order to confirm the ratings of earthing switch. The induced voltage and current is very important for the maintenance of parallel circuit. This paper describes the simulation study of electrical phenomena such as electrostatic induction voltage from the parallel line and electromagnetic induction current from the parallel circuit. The transmission line model was developed by EMTP (Electro-Magnetic Transient Program).

  • PDF

154kV 혼합송전선로 재폐로 결정에 관한 연구 (A Study on Reclosing Decision on 154kV Combined Transmission Lines)

  • 정채균;박흥석;강지원;이종범
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1761-1769
    • /
    • 2010
  • This paper describes switching surge analysis on reclosing decision in 154kV combined transmission line with power cables. Reclosing should be operated in combined transmission line based on the technical evaluation because of insulation problem of power cable section. If the surge strikes on power cable, the breakdown can occur at week point of cable insulation. Therefore the detailed analysis is required by considering several conditions such as length ratio of power cable, arrester, fault resistance, charging rate and grounding resistance, etc.. In addition, sheath voltage on IJ(Insulated Joint) is analyzed to confirm the protective level. Simulation is performed by EMTP/ATP. Analysis results show that reclosing can be operated without any special problem by the single line-to-ground fault with fault resistance of $1\Omega$ to $50\Omega$ occurred at the overhead transmission section in 154kV combined transmission lines and trap charge of 100% and 110%.

Planning of HVDC System Applied to Korea Electric Power Grid

  • Choi, DongHee;Lee, Soo Hyoung;Son, Gum Tae;Park, Jung-Wook;Baek, Seung-Mook
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권1호
    • /
    • pp.105-113
    • /
    • 2018
  • This paper proposes pre-analysis on planning of high-voltage direct current (HVDC) transmission system applied to Korea electric power grid. HVDC transmission system for interface lines has been considered as alternative solution for high-voltage AC transmission line in South Korea since constructing new high-voltage AC transmission lines is challenging due to political, environmental and social acceptance problems. However, the installation of HVDC transmission system as interface line in AC grid must be examined carefully. Thus, this paper suggests three scenarios to examine the influences of the installation of HVDC transmission system in AC grid. The power flow and contingency analyses are carried out for the proposed scenarios. Power reserves in metro area are also evaluated. And then the transient stability analysis focusing on special protection scheme (SPS) operations is analyzed when critical lines, which are HVDC lines or high voltage AC lines, are tripped. The latest generic model of HVDC system is considered for evaluating the impacts of the SPS operations for introducing HVDC system in the AC grid. The analyses of proposed scenarios are evaluated by electromechanical simulation.

Numerical simulation of unsteady galloping of two-dimensional iced transmission line with comparison to conventional quasi-steady analysis

  • Yang, Xiongjun;Lei, Ying;Zhang, Jianguo
    • Structural Engineering and Mechanics
    • /
    • 제75권4호
    • /
    • pp.487-496
    • /
    • 2020
  • Most of the previous works on numerical analysis of galloping of transmission lines are generally based on the quasisteady theory. However, some wind tunnel tests of the rectangular section or hangers of suspension bridges have shown that the galloping phenomenon has a strong unsteady characteristic and the test results are quite different from the quasi-steady calculation results. Therefore, it is necessary to check the applicability of the quasi-static theory in galloping analysis of the ice-covered transmission line. Although some limited unsteady simulation researches have been conducted on the variation of parameters such as aerodynamic damping, aerodynamic coefficients with wind speed or wind attack angle, there is a need to investigate the numerical simulation of unsteady galloping of two-dimensional iced transmission line with comparison to wind tunnel test results. In this paper, it is proposed to conduct a two dimensional (2-D) unsteady numerical analysis of ice-covered transmission line galloping. First, wind tunnel tests of a typical crescent-shapes iced conductor are conducted firstly to check the subsequent quasisteady and unsteady numerical analysis results. Then, a numerical simulation model consistent with the aeroelastic model in the wind tunnel test is established. The weak coupling methodology is used to consider the fluid-structure interaction in investigating a two-dimension numerical simulation of unsteady galloping of the iced conductor. First, the flow field is simulated to obtain the pressure and velocity distribution of the flow field. The fluid action on the iced conduct at the coupling interface is treated as an external load to the conductor. Then, the movement of the conduct is analyzed separately. The software ANSYS FLUENT is employed and redeveloped to numerically analyze the model responses based on fluid-structure interaction theory. The numerical simulation results of unsteady galloping of the iced conduct are compared with the measured responses of wind tunnel tests and the numerical results by the conventional quasi-steady theory, respectively.

영상-모드 및 Galerkin법을 이용한 전송선 문제 해석 (An Analysis of Transmission Line Structure by Combining Image Mode and Galerkin Methods)

  • 신규현;정현교;한송엽
    • 대한전기학회논문지
    • /
    • 제40권12호
    • /
    • pp.1296-1301
    • /
    • 1991
  • This paper presents a hybrid image mode Galerkin method for the analysis of the transmission line structures suspended between infinite parallel ground planes. A Green's function that consists of numerically accelerated image mode terms is developed, which is used in boundary integral equation. Transmission lines of arbitrary cross section are analyzed using Galerkin's method. Two kinds of configurations of transmission lines are studied in sample problems.

  • PDF

직병렬보상방법에 의한 초고압장거리송전선로의 보상효과분석 (The Effect Analysis of Series and Shunt Compensation Schemes for EHV Long Transmission Lines)

  • 정재길;강영묵
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 추계학술대회 논문집 학회본부
    • /
    • pp.224-227
    • /
    • 1997
  • This study discuss two subjects : maximization of transmission capability and regulation of voltages along line within the permissible bounds. Series and parallel line compensation methods have been applied for those purposes using capacitors and reactors. In this paper, the effect of series and shunt line compensation for symmetrical line is analyzed. The results obtained in this paper can be applied 765kV class EHV transmission system.

  • PDF

스페이서 강성과 간격이 송전선 갤러핑에 미치는 영향분석 (Effect Analysis of Spacer Stiffness and Interval on Galloping of Power Transmission Lines)

  • 오윤지;손정현
    • 한국기계가공학회지
    • /
    • 제18권1호
    • /
    • pp.52-58
    • /
    • 2019
  • Due to icing and snow, power transmission lines have asymmetric cross sections, and their motion becomes unstable. At this time, the vibration caused by the wind is called galloping. If galloping is continuous, short circuits or ground faults may occur. It is possible to prevent galloping by installing spacers between transmission lines. In this study, the transmission line is modeled as a mass-spring-damper system by using RecurDyn. To analyze the dynamic behavior of the transmission line, the damping coefficient is derived from the free vibration test of the transmission line and Rayleigh damping theory. The drag and lift coefficient for modeling the wind load are calculated from the flow analysis by using ANSYS Fluent. Galloping simulations according to spacer stiffness and interval are carried out. It is found that when the stiffness is 100 N/m and the interval around the support is dense, the galloping phenomenon is reduced the most.

765kV 수직2회선 6도체 현수형 철탑에서 직접활선작업의 안전성 평가분석 (Analysis of Electrical Safety Level Test for Barehand Work at 765kV Vertical Double Circuit Six Bundle Conductors on the Suspension String Tower Type)

  • 김대식;한상옥
    • 전기학회논문지P
    • /
    • 제57권3호
    • /
    • pp.275-278
    • /
    • 2008
  • It has been issued that the necessity of Live line work for 765kV vertical double circuit six bundle conductors transmission line when the characteristics of transmission line, the composition of T/L and near the T/L circumstances etc. Others are considered. The Barehand method of UHV T/L is extremely dangerous work and especially it is directly related with lineman life so it is very dangerous. It should be performed several technology developments for live-line work on the UHV T/L, that should be considered such as the electrical influence on workers near the T/L, development of live-line facilities, guarantee of safety, the technical rules of live-line work, the safe method of live-line work and etc. In order to maintain the 765kV transmission lines safely by barehand work, first of all, we should know the analysis of electrical safety level test in live-line work at 765kV vertical double circuit six bundle conductors on the suspension string tower type.