• Title/Summary/Keyword: Transition track

Search Result 130, Processing Time 0.027 seconds

A Correlation Analysis on Earth Pressure and Subgrade Stiffness in Bridge Abutment Transition Zone (철도 교량접속부의 토압과 노반강도와의 상관관계)

  • Kim, Jin-Hwan;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.647-655
    • /
    • 2016
  • The construction of high speed railways and improvement projects of for conventional railways require straight railway lines of railway, which leads to an increase of bridge and tunnel construction. Transition zones in railways means that the track support stiffness is variedvaries in over short ranges. Sspecial attention is required in theose transition zones since because instability of train running in train and irregularities of track irregularities are can frequently occurred. Typical transition zones are between bridges and earthworks and between tunnels and earthworks. On In a transition zone, a bridge abutment transition zone has many problems in with various causes. In this paper, fundamental problems of bridge abutment transition zones is are analyzed to enhance the understanding about of bridge abutment transition zones. Suggestions for improving problems in the transition zones are proposed.

Research of the Turnout Maintenance Training System using Mixed Reality (혼합현실을 이용한 분기기 유지보수 교육시스템 연구)

  • Song, Yong-Soo;Kim, Yong-Kyu;Shin, Duck-Ho;Chang, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1511-1516
    • /
    • 2011
  • The maintenance of the turnout is composed of signal field and track field on business, the electrical and mechanical field on system. adjustment and maintenance carry forward through coordination with these fields. In the case of turnout equipment used in a first phase of Seoul-Busan high-speed train, it is treated by classifying as mechanical adjustments and electrical adjustments. Mechanical adjustment is conducted with focus on fine adjustment to meet maintenance standards limits(1mm or less) about interval of basic rail and tongue rail about each part of track transition equipment. This refers to mechanical adjustments performed mainly with physical changes and movement characteristics between basic rail and tongue rail by considering the overall environment surrounding track side of section installed track transition equipment. However, these series of maintenance are conducted in state that high-speed train is not in the process from 1 am to 4 am at night, but common workers for maintenance are not familiar with the operation and checking about various situation, and the workers are even insufficient. Maintenance training using mixed reality is conducted in the place of business, we tried to overcome several problems of safety and time reduction through this training.

  • PDF

Test Construction of the Paved Track at Subway Main Line (도시철도 본선 토공구간에서의 포장궤도 시험부설)

  • Lee, Il-Wha;Kang, Yun-Suk;Kong, Sun-Yong;Kim, Sang-Jin;Lee, Shun-Gu;Jung, Yun-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

A study on surface resistivity of GFRP reinforced precast slab track (유리섬유보강 슬래브의 표면저항특성 고찰)

  • Moon, Do-Young;Zi, Goang-Seup;Lee, Seung-Jung;Kim, Yoo-Bong;Baek, In-Hyuk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2435-2438
    • /
    • 2011
  • Steel bar is used for as a reinforcing material in a concrete slab track. Bacuase the steel re-bar could provide passes for current transition, all the cross points of steel re-bars should be insulated by using plastic materials. This is due to the loss of signal intensity of track-circuit. In this study, GFRP bars are adopted in place of the traditional steel reinforcing bars for a concrete slab track to minimize the loss of the signal intensity. In order to evaluate the replacing effect on eletrical characteristic of slab track, measurements of surface resistivity are conducted on steel and GFRP reinforced precast slab tracks. In the results, the GFRP reinforced slab strack shows the higher resistivity than the steel reinforced slab track.

  • PDF

A study on interaction of track displacement and structure on long span Cheongdam Bridge (장경간 청담대교에서 궤도의 변위와 구조불간의 상호작용에 관한 연구)

  • Kim, Soon-Cheol;Park, Seok-Soon;Lee, Jong-Deuk;Kang, Jeong-Ok;Han, Kwang-Seob
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.117-122
    • /
    • 2003
  • Cheongdam Bridge in Seoul Metropolitan Subway Line No.7 recently constructed has 180 meters (2@90m) of expansion length of structure (distance between fixed points). Track type is all ballasted track and rail expansion joint is installed at every movable point. However, there is no expansion joint at the transition area between ballasted track ,end deck. By this reason, the rail buckling has been occurred every year and there is actually an abnormal behavior in expansion. In this study, based on the modeling of the Cheongdam Bridge, the element of interacting relationship between track and structure which is influential to track displacement in long-span bridge was analyzed and, finally, the methodology to ensure the continuous-welded rail in Cheongdam Bridge was suggested.

  • PDF

Analysis of Residual Settlement of Concrete Track Roadbed for High-Speed Railway (고속철도 콘크리트궤도 토공노반의 잔류침하 분석)

  • Lee, Il-Wha;Lee, Sung-Jin;Kwon, Oh-Jung;Jeong, Uhn-Ghi
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.369-374
    • /
    • 2007
  • An active application of concrete track is being expected for the future construction of Korean railroad. For the successful concrete track construction and design in earthwork areas, the residual settlement should be reasonably estimated using the proper method. The concrete track is extremely vulnerable to the damage of residual settlement. However, at the transition areas such as bridge approach, differential settlement will likely occur due to difference of stiffness, poor drainage and poor ground treatment. The maintenance is very difficult for excessive settlement on existing line, it is need to constrain the residual settlement in step of design. In this paper, it is performed the analysis of the residual settlement measured data, test results and reference to understand the residual settlement behavior of concrete track roadbed

  • PDF

Study of Determination of Allowable Residual Settlement of Concrete Track Roadbed for High-Speed Railway (콘크리트궤도 토공노반의 허용잔류침하량 결정에 관한 연구)

  • Lee, Il-Wha;Yang, Shin-Chu;Jang, Seung-Yup
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1121-1125
    • /
    • 2007
  • An active application of concrete track is being expected for the future construction of Korean railroad. For the successful concrete track construction and design in earthwork areas, the residual settlement should be reasonably estimated using the proper method. The concrete track is extremely vulnerable to the damage of residual settlement. However, at the transition areas such as bridge approach, differential settlement will likely occur due to difference of stiffness, poor drainage and poor ground treatment. The maintenance is very difficult for excessive settlement on existing line, it is need to constrain the residual settlement in step of design. In this paper, it is performed the determination of the allowable residual settlement through various study to understand the residual settlement behavior of concrete track roadbed.

  • PDF

Influence of Slab Length on behavior of Floating Slab Track by Rail-slab-isolator Longitudinal Interaction

  • Nguyen, Huan Ha;Jang, Seung Yup;Chung, Wonseok
    • International Journal of Railway
    • /
    • v.5 no.4
    • /
    • pp.163-166
    • /
    • 2012
  • Many different types of floating slab track have been developed and installed around the world to reduce vibrations and noise originating in the surrounding environment. The main objective of this study is to examine the influence of slab length on behavior of floating slab track based on rail-slab-isolator interaction. The floating slab track is modeled by the connection between rail, slab, isolator, and slab mat in the transition zone. All elements were assembled in a simplified two-dimensional (2D) finite element model (FEM). The maximum length of FST is then investigated based on the maximum additional rail stress criterion as described in UIC 774-3R since no fully accepted design criteria for the slab length in FST systems currently exist.

Evaluation of Dynamic Stability of Precast Floating Slab Track with Vehicle-Track Interaction Analysis (차량-궤도 상호작용 해석을 통한 사전 제작형 플로팅 슬래브 궤도의 동적 안정성 검토)

  • Jang, Dongdoo;Kim, Jin-Ho;Kwon, Se-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.562-568
    • /
    • 2017
  • A precast floating slab track with a 5m slab panel and installed with isolators is proposed to solve the noise and vibration problem at existing elevated railway stations. Thus, the construction can be carried out rapidly without interrupting the train operation. However, dynamic instability problems may be caused by repeated discontinuities in track due to the short slab panel length and excessive rail displacement due to the inherent operation mechanism of a floating system in reducing the vibration. Furthermore, the difference of the supporting stiffness at the transition between the floating track and ballast track may raise problems. In this study, the assessment factors to evaluate the dynamic stability of the precast floating slab track are presented and assessed with the vehicle-track interaction analysis. Through the analysis, all values relevant to the stability at the floating track section are found to be acceptable, and the slab panels at the transition section are designed to satisfy the stability.

Aerodynamic analysis on the step types of a railway tunnel with non-uniform cross-section

  • Li, Wenhui;Liu, Tanghong;Huo, Xiaoshuai;Guo, Zijian;Xia, Yutao
    • Wind and Structures
    • /
    • v.35 no.4
    • /
    • pp.269-285
    • /
    • 2022
  • The pressure-mitigating effects of a high-speed train passing through a tunnel with a partially reduced cross-section are investigated via the numerical approach. A compressible, three-dimensional RNG k-ε turbulence model and a hybrid mesh strategy are adopted to reproduce that event, which is validated by the moving model test. Three step-like tunnel forms and two additional transitions at the tunnel junction are proposed and their aerodynamic performance is compared and scrutinized with a constant cross-sectional tunnel as the benchmark. The results show that the tunnel step is unrelated to the pressure mitigation effects since the case of a double-step tunnel has no advantage in comparison to a single-step tunnel, but the excavated volume is an essential matter. The pressure peaks are reduced at different levels along with the increase of the excavated earth volume and the peaks are either fitted with power or logarithmic function relationships. In addition, the Arc and Oblique-transitions have very limited gaps, and their pressure curves are identical to each other, whereas the Rec-transition leads to relatively lower pressure peaks in CPmax, CPmin, and ΔCP, with 5.2%, 4.0%, and 4.1% relieved compared with Oblique-transition. This study could provide guidance for the design of the novel railway tunnel.