As the scale of industries expands, the facilities of the industrial customer become larger and more complex. When a fault occurs in the system, the circuit breakers play an important role in minimizing causalitites by quickly tripping the faulted line. Since the capacity of the receiving-end has increased in size, an examination is needed to be performed between the industrial customers and the conventional circuit breakers. The transient recovery voltage, which is the initial transient characteristics of the voltage across the breaker when tripped, is an important factor in determining the circuit breaker's performance. In this paper, a TRV analysis on the large-scale industrial customer is being performed utilizing PSCAD/EMTDC.
송전선로에서 발생하는 고장의 대부분은 낙뢰에 의한 상-대지간 섬락이나 외물접촉, 혹은 애자련의 오손에 의한 절연파괴 등이 대부분이다. 그리고 대분의 고장은 큰 고장전류를 흘리게 되어 보호계전기가 동작하여 고장구간을 신속하게 분리하게 된다. 그러나, 본 고장사례는 매우 희귀한 고장 사례로서, 고저항 아크 지락에 의하여 발생하는 과도회복전압(TRV: Transient Recovery Voltage)이 애자련에 섬락을 일으킨 경우이다. 본 연구에서는 EMTP (Electro-Magnetic Transient Program)를 이용하여 고저항 지락시 아크의 단속에 의하여 과도회복전압이 발생할 가능성이 있음을 보였으며, 고장기록장치(Fault Recorder)에 나타난 파형 기록과의 유사성을 확인하였다. 또한, 고저항 지락에 의하여 직류분이 초기에 방전됨으로써 고장전류 파형에 직류분 오프셋이 나타나지 않게 됨을 밝혔다.
One of the most serious problems in KEPCO system operation is higher fault current than the SCC(Short Circuit Capacity) of circuit breaker. There are many alternatives to reduce the increased fault current such as isolations of bus ties, enhancement of SCC of circuit breaker, applications of HVDC-BTB(Back to Back) and FCL(fault current limiter). But, these alternatives have some drawbacks in viewpoints of system stability and cost. As the superconductivity technology has been developed, the resistance type HTS-FCL(High Temperature Superconductor Fault Current Limiter) can be one of the most attractive alternatives to solve the fault current problem. To evaluate the accurate transient performance of resistance type HTS-FCL, it is needed that the dynamic simulation model considering transient characteristics during quenching and recovery state. Under this background, this paper presents the EMTDC model for resistance type HTS-FCL considering the nonlinear characteristic of final resistance value when quenching and recovery phenomena by fault current injection and clearing occurs.
The present research deals with a finite element analysis and fatigue evaluation of a steam separator of a high-pressure evaporator for the Heat Recovery Steam Generator (HRSG). The fatigue during the expected life of the HRSG was evaluated according to the ASME Boiler and Pressure Vessel Code Section VIII Division 2 (ASME Code). First, based on the eight transient operating conditions prescribed for the HRSG, temperature distribution of the steam separator was analyzed by a transient thermal analysis. Results of the thermal analysis were used as a thermal load for the structural analysis and used to determine the mean cycle temperature. Next, a structural analysis for the transient conditions was carried out with the thermal load, steam pressure, and nozzle load. The maximum stress location was found to be the riser nozzle bore, and hence fatigue was evaluated at that location, as per ASME Code. As a result, the cumulative usage factor was calculated as 0.00072 (much less than 1). In conclusion, the steam separator was found to be safe from fatigue failure during the expected life.
Vacuum circuit breakers(VCB) are widely used for current interruption of high-voltage inductive loads such as induction motors. This VCB can be chopped off before the current zero due to its high arc-extinguishing capability. One of the outstanding features of VCB is that it can cut off high frequency re-ignition current more than other circuit breakers. If the transient recovery voltage generated in the arc extinguishing is higher than the dielectric strength of the circuit breaker, a re-ignition phenomenon occurs. The surge voltage of the re-ignition is very high in magnitude and the steepness of the waveform is so severe that it can act as a high electrical stress on the winding. If the high frequency current of one phase affects the other two phases when the re-ignition occurs, it may cause a high surge voltage due to the virtual current chopping. If the magnitude of the voltage allowed in the motor winding is high or the waveform level is too severe, it may lead to insulation breakdown. Therefore, it is necessary to reduce the voltage to within a certain range. In this study, we briefly explain the various phenomena at the time of interruption, analyzed the magnitude of the dielectric strength and the transient recovery voltage at the simultaneous three-phase interruption that can give the greatest influence to the inductive load, proposed a method to reduce the impact.
본 논문은 인천지역 345kV 계통고장전류 저감을 위한 한류리액터 설치에 따른 362kV 50kA 차단기의 과도회복 전압 정격 초과 여부를 EMTP을 활용하여 검토하였다. 과도회복전압(TRV : Transient Recovery Voltage)은 크게 두가지, 최대전압(Vp)과 초기과도회복전압상승율(RRRV:Rate of Rise of Recovery Voltage)로 구분하며, 리액턴스 성분이 증가하며 RRRV가 상승하여 차단기가 고장전류을 차단시 절연파괴(열파괴)로 이어질 수 있다. IEC 62271-100 규정에는 RRRV를 정격차단전류의 100% 크기(T100%) 차단시 2kV/us이내로 규정하고 있으며 이 보다 작은 전류의 T90, T75 차단시의 규정치는 계산식에 의해 정해진다.
A sizing of sensible and latent energy recovery system with condensing heat exchanger is important to the design of a thermally controlled facilities. The transient system simulation program TRNSYS 14.2/IISiBat has been used to evaluate the energy consumptions of a thermally controlled facilities which consist of boiler, chiller and condensing heat exchanger, The boiler and chiller are selected based on the annual peak loads and controlled to maintain the setting temperature of $14~17^{\circ}C$. Simulation shows that the amount of sensible and latent energy recovered by heat exchanger is almost 20% of total heating load.
We report a case of transient osteoporosis of the hip with a femoral neck fracture found during follow-up. A 53-year-old man presented with left hip pain without trauma. The pain did not improve after 2 weeks and he was brought to our hospital by ambulance. Magnetic resonance imaging (MRI) of the left hip joint showed diffuse edema in the bone marrow, which was identified by low signal intensity on T1-weighted images, high signal intensity on T2-weighted images, and increased signal intensity on short tau inversion recovery. This edema extended from the femoral head and neck to the intertrochanteric area. He was diagnosed with transient osteoporosis of the left hip. Rest gradually improved his pain; however, 3 weeks later, his left hip pain worsened without trauma. X-ray, computed tomography, and MRI results of the hip joint demonstrated a left femoral neck fracture, and osteosynthesis was performed. Differential diagnoses included avascular necrosis of the femoral head, infection, complex regional pain syndrome, rheumatoid arthritis, leukemia, and other cancers. Transient osteoporosis of the hip generally has a good prognosis with spontaneous remission within a few months to 1 year. However, a sufficient length of follow-up from condition onset to full recovery is necessary to avoid all probable complications such as fractures.
Effect of ischemic preconditioning on left ventricular function after cardiac arrest in isolated rat heart.Ischemic preconditioning reduces infarct size caused by sustained ischemia. However, the effects of preconditioning on post ischemic cardiac function are not well-known. The objective of the present study was to determine whether preconditioning would improve the recovery of left ventricular functions after cardiac arrest in isolated rat heart model.Isolated rat hearts were allowed to equilibrate for 20 minutes and were then subjected to either 5 minutes of global, normothermic transient ischemia [Group 2 and 4] or not [Group 3]. A stabilization period of perfusion lasting 5 minutes after the termination of transient ischemia was followed by a standard global, normothermic 20 minute-ischemia and 35-minute reperfusion challenge [Group 3 and 4]. These following results were odtained.1. The recovery of left ventricular developed pressures showed no significant differences between Group 3 and Group 4 at 50 [P>0.3] and 85 minute [P>0.2].2. Heart rates showed no significant differences throughout all the course of experiment and between groups [P>0.5].3. The recovery of left ventricular maximum dP/dt showed no significant differences between Group 3 and Group 4 at 50 [P>0.1] and 85 minute [P>0.2].4. The recovery of pressure-rate products showed no significant differences between Group3 and Group 4 at 50 [P>0.5] and 85 minute [P>0.1].These results suggest that ischemic preconditioning does not provide significant benefit for the postischemic left ventricular functions in isolated rat hearts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.