Column Shortening prediction and Field measurement of Tall building with Transfer floor (전이층을 가진 초고층건물의 기둥축소량 예측 및 현장계측)

  • Song Hwa-Cheol;Cho Yong-Soo;Chung Sung-Jin;Yoon Kwang-Sup;Lee Woo-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.175-181
    • /
    • 2006
  • The prediction of time-dependent column shortening is essential for tall buildings considering both strength and serviceability aspects. The Column shortening of tall buildings with transfer floor should be calculated considering the long-term deflection of transfer girder. In this study, both the column shortening and the deflection of transfer girder of 45-story tall concrete building are predicted. The column shortening considering deflection of transfer girder are compared with the actual column shortening by field measurement.

  • PDF

A Study on the Estimation of Prestress Losses in Prestressed Concrete Box Girder Bridges (프리스트레스트 콘크리트 박스 거더 교량의 프리스트레스 손실 추정에 관한 연구)

  • Oh, Byung-Hwan;Yang, In-Hwan;Kim, Ji-Sang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.2
    • /
    • pp.111-120
    • /
    • 2001
  • This paper aims at estimating instantaneous prestress losses by measuring the actual prestress forces in prestressed concrete (PSC) box girder bridges. Measurement were taken to study initial prestress losses such as friction losses and slip losses. A new strain gauge system was developed to measure strains in internal tendons. The system was installed on a total of 20 tendons in a PSC box girder bridges. The variation of prestress forces were monitored during prestressing tendon and after prestress transfer. The prestress losses are also calculated including friction losses and slip losses. The measured data were compared with the theoretical values. The result shows that the measured prestress forces agree well with the theoretical values. It is shown that prestress force of each strand in the same tendon is a bit different. This study also shows that prestress losses of continuity tendons during prestress transfer are significantly different each other, which results from the variety of buttress location and tendon profile. The present study provides realistic information on the estimation of actual prestress forces and losses in PSC box girder bridges.

  • PDF

Methodologies for numerical modelling of prestressed concrete box-girder for long term deflection

  • Lalanthi, M.C.;Kamatchi, P.;Balaji Rao, K.;Saibabu, S.
    • Computers and Concrete
    • /
    • v.21 no.3
    • /
    • pp.269-278
    • /
    • 2018
  • In this paper, two methods M1 and M2 to determine long-term deflection through finite element analyses including the effect of creep and relaxation are proposed and demonstrated for a PSC box-girder. In both the methods, the effect of creep is accounted by different models from international standards viz., ACI-209R-92, CEB MC 90-99, B3 and GL2000. In M1, prestress losses due to creep and relaxation and age adjusted effective modulus are estimated through different models and have been used in finite element (FE) analyses for individual time steps. In M2, effects of creep and relaxation are implemented through the features of FE program and the time dependent analyses are carried out in single step. Variations in time-dependent strains, prestress losses, stresses and deflections of the PSC box-girder bridge through M1 and M2 are studied. For the PSC girder camber obtained from both M1 and M2 are lesser than simple bending theory based calculations, this shows that the camber is overestimated by simple bending theory which may lead to non-conservative design. It is also observed that stresses obtained from FEM for bottom fibre are lesser than the stresses obtained from bending theory at transfer for the PSC girder which may lead to non-conservative estimates.

A Study on the Moment and Shear Resisting Performance of Steel Girder - R/C Column Connection (철골 보 - 철근콘크리트 기둥 접합부의 휨 및 전단 저항성능에 관한 연구)

  • Choi, Kwang Ho
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.4 s.47
    • /
    • pp.429-436
    • /
    • 2000
  • The composite system, which is consisted of the steel girder and reinforced concrete column has some advantages in the structural efficiency and the construction productivity by complementing the shortcomings between the two materials. This research is aimed at the development of the composite beam-column connection system by which the steel beam can be connected to the R/C column with smooth stress transfer. And, to ensure safety of this system, the tests of moment and shear resisting performance have been carried out for actual size specimen. From the test, the connection system has been preyed to take good resistance and stress transfer between steel girder and reinforced concrete column.

  • PDF

A Study on the Development and Test on Bearing Resistance of R/C Column-Steel Girder Connection (철근콘크리트 기둥과 철골보의 접합부 개발 및 지압성능에 관한 시험적 연구)

  • 최광호;이세웅;김재순;김상식
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.515-520
    • /
    • 1997
  • This research is aimed at the development of the composite beam-column connection system by which the steel beam can be connected to the R/C column with smooth stress transfer. As the first step of the structural performance tests of the system, bearing resistance test has been carried out for actual size specimen. From the test, the connection system has been proved to take good bonding and stress transfer to the surrounding concrete with negligible relative displacements.

  • PDF

Capacities and Failure Modes of Transfer Girders in the Upper-Wall and Lower-Frame Structures having different Detailing (주상복합구조의 전이보 상세에 따른 성능과 파괴모드)

  • 이한선;김상연;고동우;권기혁;김민수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.845-850
    • /
    • 2000
  • This paper presents the results of tests performed on the transfer girders which have been generally used between upper walls and lower frames in the hybrid structures. The 8 specimens were designed using (1) ACI method, (2) strut-tie model, and (3) X-type shear reinforcement cage. The capacities of the specimens are in general larger than the design values except the one designed according to strut-tie model. The reason for this difference seems to be due to the arbitrary allocation of transferred shear force to the path of direct compression strut and the path of indirect strut and tie. The failure modes turn out toe be (1) shear failure at critical shear zone, (2) compressive concrete crushing in the diagonal strut in the shear zone of transfer girder, and (3) compressive concrete crushing in the corner of upper wall.

A Study on Shrinkage Crack of Steel Composite Concrete Box Structure (Transfer Girder) (강합성 콘크리트 박스구조물(트랜스퍼 거더)의 건조수축 균열에 대한 연구)

  • Choi, Jung-Youl;Kim, Dae-Ill
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.685-691
    • /
    • 2022
  • This study was based on the steel composite concrete box structure (Transfer girder) which was installed to support the skyscrapers directly above the subway line. In this study, it was analytically proved that the cause of cracks on the steel composite concrete box structure were the shrinkage cracks by comparing the results of crack investigation and numerical analysis. As the results, it was found that the internal temperature difference between concrete and steel members occurred according to the shape of the steel frame embedded in concrete, the location of vertical stiffener, and the closed section area. The narrower spacing of vertical stiffener was occurred the internal temperature concentration of the structure and the temperature difference increased. And the location of higher thermal strain and temperature were similar to the location of actual cracks by the visual inspection. Therefore, the internal temperature concentration parts were formed according to the presence and spacing of the vertical stiffeners and the inspection passage in the central part of the structure. The shrinkage cracks were occurred by the restrained of temperature expansion and contraction of the concrete. As the results of this study, it was important to separate and manage the non-structural cracks caused by shrinkage and the structural cracks in the maintenance of serviced steel-composite concrete structures.

Analysis of PSC Box Girder Railway Bridge and Design of its Diaphragm using Sturt-and-Tie Model (PSC 박스 거더 철도교량의 해석 및 스트럿-타이 모델에 의한 격벽부 설계)

  • Song, Ha-Won;Kim, Hyoung-Woon;Kim, Young-Hoon;Byun, Keun-Joo
    • Journal of the Korean Society for Railway
    • /
    • v.1 no.1 s.1
    • /
    • pp.30-39
    • /
    • 1998
  • The functions of diaphragms at abutments and piers of PSC box girder railway bridge are to transfer forces from the superstructure onto bearings or columns and to stiffen the superstructure cross-section against in -plane deformation. Due to stress disturbance at diaphragm, the design for the diaphragm using conventional design method is relatively irrational than those for other structural members. And, due to contribution to boundary condition of deck slab by the diaphragm, the behavior of deck slab near the diaphragm is different from that of the deck slab obtained from two dimensional analysis of the bridge, which is basis for the design of deck slab. In this paper, three dimensional behavior of deck slab near the diaphragm of prestressed concrete (PSC) box girder railway bridge constructed by the precast span method are analyzed by using three dimensional finite element modeling and using the strut-and-tie model design of the diaphragm are presented. The modeling techniques used in this paper can be applied effectively to examine the causes of cracks at deck slab near diaphragm and to design diaphragm rationally.

  • PDF