• 제목/요약/키워드: Train

검색결과 7,444건 처리시간 0.029초

열차의 운행패턴과 속도에 따른 한국형 고속전철용 판토그라프의 접촉력과 가속도 거동의 변화 경향 (Variation Trends of the Contact Force between Pantograph-Catenary and Acceleration Behavior According to the Train Running Speed and Driving Pattern in Korean High Speed Train)

  • 목진용;김영국;박춘수;김기환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 춘계학술대회논문집
    • /
    • pp.200-205
    • /
    • 2004
  • The pantograph for Korean High Speed Train was developed and had been evaluating by through 'G7-R&D project for home grown high speed train technology' In this study, in mechanical aspect, the variation trend of contact force between pantograph and catenary according to the train running speed and driving pattern is conducted. A measuring system for current collecting performance and mechanical characteristics is used for this study, developed and installed on the prototype Korean High Speed Train, and physical characteristics were measured while the KHST runs on the test track. Through this study, remarkable trends of variation are found and analyzed from measured acceleration and vertical contact force between the pan head in pantograph and contact wire in catenary system according to the driving pattern and the train raised a running speed up to 300km/h.

  • PDF

열차배열의 최적화 프로그램 개발 (A Development of Optimized Train Scheduling Program)

  • 류상환;;김길상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 추계학술대회 논문집 학회본부
    • /
    • pp.513-515
    • /
    • 1995
  • A computer aided process is inevitable for the optimization of train operation planning. Developing of train diagrams is very important for the train operation planning. In this paper, the user friendly program related to the train scheduling that can be used for the basic data on developing of train diagram is introduced. It can also provide basic data for other train operation plannings, such as Timetabling, Crew Operation Scheduling, etc. It provides the planner with data moving, data changing and zooming functions, and it can assist the user easily produces their optimal solution. All this operations are performed interactively through graphic windows.

  • PDF

에너지 효율적인 속도 프로파일 생성을 위한 Simulink 기반 열차 성능 시뮬레이션 (A Train Performance Simulation using Simulink for Generating Energy-efficient Speed Profiles)

  • 강문호;한문섭
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1816-1822
    • /
    • 2010
  • In this research TPS (Train Performance Simulation) blocks are designed using Simulink and applied to generate speed profiles for energy-efficient train operation. With a train operation mode of maximum powering, coasting, and maximum breaking, a breaking point is calculated from forward-backward running profiles. Then, GA (Genetic Algorithm) is used to solve a running time constraint, and a coasting point is produced from the searching process of GA. With the breaking point and the coasting point a speed profile is plotted. Train performance under a speed limit and gradient variations is simulated and resultant speed profiles are analyzed.

도플러 보정을 통한 고속열차 현장 측정 소음 분석 (Analysis of Field Noise from High Speed Train Using Dedopplerization)

  • 이용우;이덕주;권혁빈;윤수환
    • 한국소음진동공학회논문집
    • /
    • 제23권5호
    • /
    • pp.431-437
    • /
    • 2013
  • Measured acoustic signal from operating high speed train contains frequency change called doppler shift due to its motion. To avoid this doppler shift wind tunnel test is required. But scaledown of model can cause change of source characteristics. And measurements using some part of train cannot reproduce real flow condition. The best way to recognize real noise source characteristics is measurement from operating high speed train but doppler shift makes it hard. So, we developed simple dedopplerization technique for one microphone and applied to field test data of high speed train. Through this, we could capture real frequency of noise from operating high speed train.

한국형 고속전철용 판토그라프의 거동 특성과 열차속도와의 상관관계와 경향 (Relation and Variation Trend between the Behavior of the Pantograph vs. the Vehicle Running Speed in Korean High Speed Train)

  • 목진용;박춘수;조용현;최강윤;김기환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2003년도 추계학술대회논문집
    • /
    • pp.170-176
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed and had been evaluating by through "G7- R&D for home grown high speed train technology". In this study, a relation in mechanical aspect between the train running speed and the current collecting performance of the pantograph is conducted.'for this study, a measuring system for current collecting performance and mechanical characteristics is developed and installed on the prototype Korean High Speed Train, and measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing unit. It monitors whether the hazard behavior in the pantograph is occurs or not, and measures acceleration and vertical contact force between the pan head and catenary. Through this study, evaluation of a mechanical vibration characteristics and trend of the pantograph and a interface performance of pantograph - catenary up to 200㎞/h train speed are facilitated.

  • PDF

고속철도 차량의 제동성능해석 및 검증 (Braking Performance Analysis and Inspection of High Speed Train)

  • 이성호;김영국;김석원;박진배
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2006년도 춘계학술대회논문집
    • /
    • pp.982-987
    • /
    • 2006
  • In general, the braking system of high speed train has an important role for the safety of the train. To stop safely the train at its pre-decided position, it is necessary to combine property the various brakes. Generally high speed train has adopted a combined electrical and mechanical (friction) braking system. Electrical brakes are consist of rheostatic brake, regenerative brake and eddy current brake and mechanical brakes are composed of disc brake, wheel disc brake and tread brake. In this paper, we introduce braking performance analysis and inspection though simulation and research to reduce braking distance.

  • PDF

전기철도 AT급전계통의 열차 운형 모의 해석 알고리즘 연구 (A study on modified algorithm to operating train simulation of AT feeding systems)

  • 추동욱;김재철;정용철;전용주;임성정
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.449-451
    • /
    • 2001
  • This study presents a study on modified algorithm to operating train simulation of AT feeding systems. In this study equivalent impedance is constructed by $Z_c,\;Z_r,\;Z_f,\;Z_{cr},\;Z_{rf},\;Z_{fc}$. The train current flows through the all auto-transformer corresponding to track impedance. To calculate train voltage from analyzing the railway systems, the algorithm is based on the K. C. L, K. V. L, superposition and circuit separation method. Multi-train's voltages are determined by calculating the catenary voltage at each train's position and adding up these train's voltage drop. Case studies use a field operational data, show that the proposed method is easily applied.

  • PDF

투과손실을 이용한 틸팅차량의 실내소음 예측 (Prediction of Interior Noise for Tilting Train by using Transmission Loss)

  • 김재철
    • 한국철도학회논문집
    • /
    • 제10권4호
    • /
    • pp.405-408
    • /
    • 2007
  • In this paper, we describe the analysis of interior noise for tilting train that is being developed in Korea. Tilting train is made of composite material to reduce the car body's weight and attached a self-steering system on bogie to improve curving performance. However, the acoustic performance (Transmission Loss) of such material is worse than the materials of conventional train, such as aluminum, steel and so on. Therefore, we measure the transmission loss of side wall/floor of tiling train and predict the interior noise for tilting train using its measuring results.

2차원 관절형 고속열차 모델을 이용한 차량/궤도/교량 상호작용해석 (Train/Track/Bridge Interaction Analysis Using 2-Dimensional Articulated High-Speed Train Model)

  • 김만철;양신추;이종득
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.414-421
    • /
    • 1999
  • In this paper, the simplified method for 2-dimensional train/track/bridge interaction analysis is utilized in the analysis of dynamic behavior of bridges in which the eccentricity of axle loads and the effect of the toriosnal forces acting on the bridge are included for the more accurate train/track/bridge interaction analysis. Inverstigations mainly into the influence of vehicle speed on train/track/bridge interactions are carried out for the two cases. The first case is that only train and bridge are considered in the modelling and the other case is that train, track and bridge are considered.

  • PDF

표준전동차의 상용전제동 제어방범에 관한 연구 (A Study on the Control Method of Full Service Brake for Standard EMU)

  • 이우동;변윤섭;김연수;김원경;최성규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.103-109
    • /
    • 1999
  • The object of the study is to propose the control method of FSB(full service brake) for the standard EMU. Recently, the variable control function was applied to train by introducing the TCMS. When the vehicle in the train fails, the emergency brake of the train should be automatically operated. In case of VVVF EMU operated by the TCMS, the FSB is applied to the train for safety instead of emergency brake. When the FSB is applied to train regardless of its weight and the numbers, the train safety operation may not be obstained. Therefore, the FSB force which considers its weight and numbers should be applied to the train. This paper describes the blending brake control for standard EMU. The control algorithm of the FSB is proposed and its simulation was carried out by using MATLAB.

  • PDF