• Title/Summary/Keyword: Track force

Search Result 372, Processing Time 0.03 seconds

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

Parametric analysis on Deformation of Sharp Curved Ballasted Track (급곡선 자갈궤도의 궤도변형에 관한 매개변수 해석)

  • Choi, Jung-Youl;Kim, Jun-Hyung;Son, Gab-Soo;Kim, Sang-Jin
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.28-33
    • /
    • 2017
  • A sharp curved ballasted track on earthwork that was connected with a direct fixation slab track on steel box railway bridges have been deformed and damaged despite the frequently maintenance by a restoring force of sharp curved rail and track-bridge interaction forces such as axial forces and longitudinal displacement of continuous welded rail(CWR) owing to their structural characteristics, calling for alternatives to improve the structural safety and track irregularity. In this study, the authors aim to prove a cause of deformation for the sharp curved ballasted tracks to enhance the structural safety and track irregularity of ballasted track in service. A track-bridge interaction analysis and a finite-element method analysis for the sharp curved ballasted track were performed to consider the axial force and longitudinal displacement of CWR, the temperature and the effect of restoring force of sharp curved rail. From the results, the deformation of the sharp curved ballasted track with adjusted sleeper spacing from 833mm to 590mm were significantly reduced.

Parametric Analysis for Up-lifting force on Slab track of Bridge under Train Load (열차하중 재하시 교량상slab궤도의 상향력 민감도분석)

  • Choi, Sung-Ki;Park, Dae-Geun;Han, Sang-Yun;Kang, Young-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.279-282
    • /
    • 2008
  • The vertical forces in rail fasteners at areas of bridge transitions near the embankment and on the pier will occur due to different deformations of adjoining bridges caused by the trainloads. The up-lifting forces is not large problem in the blast track because the elasticity of blast and rail pad buffs up-lifting effect. But, it is likely to be difficult to ensure the serviceability of the railway and the safety of the fastener in the end in that concrete slab track consist of rail, fastener, and track in a single body, delivering directly the up-lifting force to the fastener if the deck is bended because of the end rotation of the overhang due to the vertical load. When the up-lifting force exceeds the clamp force of the fastener clip, the rail pad is out of fastener, which makes decrease the serviceability of the railway, such as noise and vibration. Furthermore, it is possible to reduce the safety of the track as the longitudinal resistance. This study is focused on guideline suggestion to decrease up-lifting force in the fastener adjacent to the civil joint of slab track of bridge throughout the parametric analysis between the vertical spring stiffness of the fastener as the material approach, the space of fastener adjacent to bridge transition, the rigidity of the girder as the geometrical approach and up-lifting force under the train load.

  • PDF

A Study on Application of Force-based Track Irregularity Analysis Method (하중기반의 궤도틀림 분석기법 적용에 관한 연구)

  • Hwang, Seon-Kwon;Choi, Jung-Youl
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.547-552
    • /
    • 2022
  • In this study, shape-based track management by analyzing track irregularity was studied in terms of force-based track irregularity analysis by numerical analysis of wheel-rail interaction force using by the measured vertical irregularity. The effect of the vertical irregularity of the track due to the difference in track types on the wheel-rail interaction force and the track acceleration in the connecting section of the sleeper floating track and the direct fixation track on concrete bed were analyzed. As the results of this study, the measured vertical irregularity was directly affect the vertical wheel load (the wheel-rail interaction force) and the rail acceleration, and it has been demonstrated to change consistently. In this study, the adequacy and necessity of the force-based track irregularity analysis method was verified based on the wheel-rail interaction analysis using the the measured vertical irregularity.

A study on the Longitudinal Force Variation of CWR according to the Condition of Track Maintenance (궤도보수 작업 조건별 장대레일 축력변화에 관한 연구)

  • Won, Yong-Hoan;Kim, Kwan-Hyung;Kwon, Soon-Jung;Lee, Seung-Youl
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.99-105
    • /
    • 2009
  • This research presents the method to decide proper locations for destressing of CWR using a non-destructive equipments to measure the longitudinal force(installation temperature) in CWR. The effect and necessity of destressing were analyzed by estimating changes of longitudinal force. The installation temperature was measured to find changes of longitudinal force in high speed and conventional lines before and after destressing or track maintenance at the locations where destressing was planed or where change of longitudinal force was expected during track maintenance. Past destressing was carried out within qualitative decision criteria. This research proposes the quantitative criteria to decide the priority order of the destressing locations reasonably by considering the difference of air temperature and stress free temperature during the track maintenances, the grade of ballast resistance force recovering and the length of destressing, etc.

  • PDF

The criteria for the change ratio of track stiffness along transition area (접속구간 궤도강성변화 기준에 관한 연구)

  • Yang, Sin-Chu;Moon, Jae-Woo;Yu, Jin-Young
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.351-357
    • /
    • 2007
  • The transition zone between railway embankment and structures, or different track types is known to be an area in which problems often arise and where extra care needs to be taken with maintenance. Differences in track stiffness have dynamic effects and these increase the force in the track and the extent of deformation. In this study, the criteria for the change ratio of track stiffness along transition area, and proper transition length are presented through train/track interaction analyses. Those are derived on the basis of permissible limitations of train and track performances such as rail stress, uplift force of fastener, reduction of dynamic wheel force, and acceleration of car body. A feasible method of evaluation of track stiffness which is necessary when a designer reviews whether the criteria are satisfied or not is also presented.

  • PDF

A Study on Determination of the Minimum Vertical Spring Stiffness of Track Pads in Korea High Speed Railway. (고속철도 궤도패드의 최소 수직 스프링계수 결정에 관한 연구)

  • Kim Jeong-il;Yang Sin-Chu;Kim Yun-Tae;Suh Sa-Bum
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.504-509
    • /
    • 2005
  • Railway noise and vibration has been recognized as major problems with the speed-up of rolling stock. As a kind of solution to these problems, the decrease of stiffness of track pad have been tried. However, in this case, overturning of rail due to lateral force should be considered because it can have effect on the safety of running train. Therefore, above two things - decrease of stiffness of track pad and overturning of rail due to lateral force - should be considered simultaneously for the appropriate determination of spring coefficient of track pad. With this viewpoint, minimum spring coefficient of track pad is estimated through the comparison between the theoretical relationship about the overturning of rail and 3-dimensional FE analysis result. Two kinds of Lateral force and wheel load are used as input loads. Extracted values from the conventional estimation formula and the Shinkansen design loads are used. It is found that the overturning of rail changes corresponding to the change of the stiffness of track pad and the ratio of lateral force to wheel load. Moreover, it is found that the analysis model can have influence on the results. Through these procedure, minimum spring coefficient of track pad is estimated.

  • PDF

The Experimental Study about a Correlation between the Derailment Coefficient of the Railway Vehicle and the Track Alignment (철도차량의 탈선계수와 궤도선형간의 상관관계에 관한 실험적 연구)

  • Ham, Young-Sam;Lee, Dong-Hyung;Kwon, Seok-Jin;Seo, Jung-Won
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.8
    • /
    • pp.7-12
    • /
    • 2010
  • When a vehicle is running, wheel is generating vertical and lateral force on the rail, in addition to load of vehicle, through a complicated set of motions. The derailment coefficient refers to the ratio of lateral force to vertical force(wheel load), and if the value exceeds a certain level, a wheel climbs or jumps over the rail. That's why the value is used as a criterion for running safety. Derailment coefficient of rolling stocks alters according to shape of rail track. I measured three-dimensional angular velocity and acceleration to use 3D Motion Tracker. Test result, derailment coefficient of rolling stocks and shape of rail track examined closely that have fixed relation. Specially, was proved that roll motion has the close coupling relation.

A study on the Settlement of Ballasted Track according to Various Rail-Pad Stiffness (레일패드의 강성이 자갈궤도 침하에 미치는 영향 연구)

  • Choi, Jin-Yu;Kim, Eun;Hwang, Man-Ho;Choi, Su-Ik
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.249-255
    • /
    • 2010
  • Ballasted track is under the circumstance of repetition of deterioration and recovery. Track deterioration is presented as track irregularity or settlement, and dynamic force subjected to track is one of major cause of the deterioration. The dynamic force is determined from the dynamic interaction between track and vehicle. Rail-pad stiffness is one of the factor affects track dynamic property. In this study, the relationship between rail-pad stiffness and track settlement was investigated. Dynamic forces according to various rail-pad stiffness was obtained from the dynamic vehicle-track interaction analysis using DARTS-NL. Track settlement was calculated by substitution the dynamic forces into various formulas for track settlement. From the result of analysis, it was known that the track settlement is increased about 6% when the rail-pad stiffness rise about twice. And this result leads that there is only a little relationship between rail-pad stiffness and track settlement.

  • PDF

Shear Key Design of Concrete Track on Bridge (교량구간 콘크리트궤도의 전단키 설계)

  • Back, Hyo-Sun;Lee, Ho-Ryong;Bae, Sang-Hwan;Cho, Hyun-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3251-3255
    • /
    • 2011
  • Being the concrete track laid on bridge, due to track-bridge temperature difference, traction and brake force, and nosing force, the horizontal force can be applied to the track slab. Therefore, shear key structures to resist this horizontal force should be installed. The shear key structures installed in the Kyeong-Bu high-speed line are consisted of four shear keys at every slab with the length of 6 to 8m. However, in the point of view of construction, it is more advantageous to curtail the numbers of shear keys, and thus, the numbers and spacing of the shear keys should be carefully determined. In this study, hence, the effects of slab length, the numbers and spacing of the shear keys on design of shear key and track slab are examined.

  • PDF