• Title/Summary/Keyword: Track Settlement

Search Result 138, Processing Time 0.024 seconds

Analysis of risk for high-speed trains caused by crosswind in subgrade settlement zones based on CFD-FE coupling

  • Qian Zhang;Xiaopei Cai;Tao Wang;Yanrong Zhang;Shusheng Yang
    • Wind and Structures
    • /
    • v.37 no.4
    • /
    • pp.275-287
    • /
    • 2023
  • Subgrade differential settlement of high-speed railways was a pivotal issue that could increase the risk of trains operation. The risk will be further increased when trains in the subsidence zone are affected by crosswinds. In this paper, the computational fluid dynamics (CFD) model and finite element (FE) model were established, and the data transmission interface of the two models was established by fluid-solid interaction (FSI) method to form a systematic crosswind-train-track-subgrade dynamic model. The risk of high-speed train encountering crosswind in settlement area was analyzed. The results showed that the aerodynamic force of the trains increased significantly with the increase in crosswind speed. The aerodynamic force of the trains could reach 125.14 kN, significantly increasing the risk of derailment and overturning. Considering the influence of crosswind, the risk of train operation could be greatly increased. The safety indices and the wheel-rail force both increased with the increase of the wind speed. For the high-speed train running at 350 km/h, the warning value of wind speed was 10.2 m /s under the condition of subgrade settlement with wavelength of 20 m and amplitude of 15 mm.

A Study on Settlement Characteristics of Earthwork Subgrade with Lowering the Groundwater in High-speed Railway (지하수위 저하에 따른 고속철도 토공노반 침하특성에 관한 연구)

  • Kim, Young-Ha;Eum, Ki-Young;Han, Sang-Jae;Park, Yong-Gul;Jung, Jae-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.5
    • /
    • pp.67-74
    • /
    • 2015
  • Unlike the primary consolidation settlement, the settlement of ground water lowering is not considered separately because of relatively small residual settlement. But the allowed residual settlement (30 mm) of the concrete track in the high-speed railway may be exceeded due to unexpected excessive ground water lowering. This study analyzed the effect of the settlement according to the ground water level change using finite element analysis of stress-pore pressure coupling model, and compared the analysis results with the measured data. As a result, the range of elasticity modulus satisfying the allowable settlement was proposed, and it is suggested that settlement due to ground water level changes should be reflected in the design.

Long-term Settlement of High Speed Railway Embankment Compacted under Dry/Wet Condition (고속철도 토공구간 쌓기 재료의 다짐함수비 조건에 따른 장기침하 특성)

  • Lee, Sung-Jin;Lee, Il-Wha;Lee, Jin-Uk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1268-1277
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. This wetting collapse problem for the compressibility of compacted sands, gravels and rockfills, has been recognized by several researchers. For this wetting settlement problem, we showed the test results carried out with 4 fill materials. These tests were performed under the condition that the fill materials were inundated at the first wetting. Subsequently, in this study, we investigated the long-term settlement characteristics of the fill materials under the repeated partial wetting and rising of the ground water table happend by rainfall.

  • PDF

Deformation Characteristics of Construction Joint of Paved Track on Earthwork Section using the Accelerated Track Test (궤도가속실험을 통한 포장궤도 토공구간 시공이음매부의 변형특성 연구)

  • Lee, Il-Wha;Jang, Seung-Yup;Kang, Yoon-Suk;Um, Ju-Hwan;Kim, Eun
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.521-527
    • /
    • 2010
  • The Paved Track is applied to reduce maintenance cost of conventional line. The Paved Track could be used in all types of lines including earthwork, bridge, tunnel and turnout sections. In case of earthwork section, the construction joint is the most critical factor to track durability. The construction joint does not affect to the track structure directly, but the gap due to discontinuity of slabs may affect to the long-term serviceability. To evaluate this problem, the accelerated track test has been performed on the construction joint and the middle part to of the real scale Paved Track. The purpose of this test is that evaluate the vulnerability of construction joint section comparing the trends of settlement and earth pressure under repeated loads of construction joint with those of the middle slab part.

Mixed Design of Grouting Materials for Settlement Restoration Using Micro Cement (마이크로시멘트를 이용한 침하복원용 그라우팅재료의 배합 설계)

  • Lee, Il-Wha;Lee, Sung-Jin;Yun, Won-Min;Park, Sung-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1786-1792
    • /
    • 2011
  • If the concrete track is settled excessively, it must be restored or reinforced immediately. Especially, reinforcement/restoration method should be applied without affecting on train operation. To deal with this problem, special equipment, process and material should be prepared. This paper suggest a special mixing ratio to restore the settled concrete track. Materials are classified the quick hardening mortar and the middle hardening mortar. The quick hardening mortar is used to restore the settled track and the middle hardening mortar is used to fill the void. These materials must have the appropriate gel time(1-40sec) and compressive strength($5kg/cm^2$). Various compounds is used and the micro cement is used as a main base.

  • PDF

Application on Geotextiles for the Roadbed Reinforcement of the Concrete Track Rehabilitation (콘크리트궤도 개량공사시 노반 보강을 위한 토목섬유의 적용)

  • Lee, Il-Wha;Jang, Seung-Yup;Han, Sung-Wu;Kim, Yong-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1802-1806
    • /
    • 2007
  • The most important factor is the roadbed bearing capacity at concrete track construction. Particularly, in case of rehabilitation, it is essential to secure the uniform roadbed stiffness to prevent the irregular settlement. In this study, reinforced effect of the geotextiles is investigated which is applied to concrete track rehabilitation. The geotextiles is installed two or three layers as the condition of the ground and structure. The reinforced effect of geotextiles is confirmed by the strain gage attached on the geotextiles surface.

  • PDF

Experimental Study on the Variation of Track Stiffness between Earthwork and Bridge (교량 토공 접속부에서 궤도강성변화에 대한 실험적 연구)

  • 나성훈;서사범;손기준;김정환
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.281-288
    • /
    • 2001
  • In order to evaluate the effect of impact load at support stiffness transition area, the field estimations are performed at the transition zone between earthwork and bridge on test operation of KTX. Due to differential settlement caused by the variations of track support stiffness, large impact forces are investigated. However, the measured values such as wheel load, rail stress, displacement and acceleration in the transition area shows that the stiffness changes in the transition area are not abrupt, and the stiffness in the infra track structure varies continuously. In this experimental study, the parameters influencing safety of transition area are not governed by partial or local stiffness because cumulative passing loads are not sufficient on test operation of KTX.

  • PDF

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

Evaluation on Structural Stiffness and Grouting Efficiency of Concrete Track using Elastic Wave Tests (탄성파 기법을 이용한 콘크리트궤도의 구조강성 및 충전상태 평가에 관한 연구)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.55-64
    • /
    • 2009
  • Recently, concrete track is replacing ballast track for efficient and economic maintenance of track. It considerably offer less maintenance, a longer service life and reduced life-cycle costs. With the aim of achieving high-quality track construction work, of developing tools for quality assurance in new construction and for later technical inspection of material condition, a quality strategy has to be developed. For these purpose, NDT which is using the seismic wave has carried out in situ studies in the test construction section. The used NDT are SASW test, impact echo test and continuous impact echo test. The test is performed 5,353 times on 49 pre-cast concrete track panels to verify the stiffness structure and grouting efficiency of the track structure. To conclude, because of the non-homogeneous characteristic of concrete material. it is restricted to apply the elastic wave test at some aspect. However it is possible to acquisite a sufficient reliability about structural stiffness and grouting efficiency of concrete track.