• Title/Summary/Keyword: Track Maintenance

Search Result 439, Processing Time 0.03 seconds

Railway Track Maintenance Scheduling using Binary Artificial Bee Colony (Binary Artificial Bee Colony를 이용한 궤도 유지보수 일정계획)

  • Nam, Duk-Hee;Kim, Ki-Dong;Kim, Sung-Soo;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1191-1202
    • /
    • 2010
  • The objective of this paper is to propose a Binary Artificial Bee Colony (BABC) to obtain the best/optimal solution for NP-hard scheduling problem of railway track maintenance. We can greatly maximize the objective value using proposed BABC within limited computation time. The proposed BABC mechanism is very efficient to find the best solution because of employing fewer control parameters.

  • PDF

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

The Effect of the ZLR and Tied Sleeper to Reduce the Track Irregularity in the Bridge Expansion Joint Zone (교량신축부에서의 궤도틀림 저감을 위한 활동체결구 및 침목결속 효과)

  • Kang, Tae-Ku;Min, Kyung-Ju;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2405-2408
    • /
    • 2011
  • In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.

  • PDF

Risk Estimation Study on Railway Track Worker Hit by Train (철도 운행선로 작업자와 열차 접촉사고 위험도 평가에 관한 연구)

  • Kwak, Sang Log
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.72-78
    • /
    • 2020
  • The accident fatality rate has decreased by more than 90% compared to 2006, due to the safety management and safety investment based on the Rail Safety Act. Most railway safety indicators, including fatality rates, have improved significantly from 60% to 80%, reaching the level of developed countries in terms of most railway safety indicators. However, the only staff fatality rate at work is not improved, and it is 3 to 5 times higher than that of developed countries. Most of the fatality occurred during employee's work recently occurred due to accidents hit by train while track work. In principle, when operating track need to check or maintenance, the operation of the train should be stopped and the work carried out. However, in Korea, due to the highest passenger density and train operating density in the world, it is caused by a structural problem that requires workers to enter the track while the train is running and perform various tasks such as maintenance and inspection. In this study, we analyzed the risk of accidents caused by hit by trains on the track, which is the biggest cause of staff fatality, using the main statistics of the last 10 years. In detail, the scenarios of the main causes of hit by trains and workers were formed to suggest the effectiveness of the current preventive measures and supplementary.

A Study on Identification of Track Irregularity of High Speed Railway Track Using an SVM (SVM을 이용한 고속철도 궤도틀림 식별에 관한 연구)

  • Kim, Ki-Dong;Hwang, Soon-Hyun
    • Journal of Industrial Technology
    • /
    • v.33 no.A
    • /
    • pp.31-39
    • /
    • 2013
  • There are two methods to make a distinction of deterioration of high-speed railway track. One is that an administrator checks for each attribute value of track induction data represented in graph and determines whether maintenance is needed or not. The other is that an administrator checks for monthly trend of attribute value of the corresponding section and determines whether maintenance is needed or not. But these methods have a weak point that it takes longer times to make decisions as the amount of track induction data increases. As a field of artificial intelligence, the method that a computer makes a distinction of deterioration of high-speed railway track automatically is based on machine learning. Types of machine learning algorism are classified into four type: supervised learning, unsupervised learning, semi-supervised learning, and reinforcement learning. This research uses supervised learning that analogizes a separating function form training data. The method suggested in this research uses SVM classifier which is a main type of supervised learning and shows higher efficiency binary classification problem. and it grasps the difference between two groups of data and makes a distinction of deterioration of high-speed railway track.

  • PDF

The Use of Bituminous Subballast on Future High-Speed Lines in Spain: Structural Design and Economical Impact

  • Teixeira, P.F.;Ferreira, P.A.;Pita, A. Lopez;Casas, C.;Bachiller, A.
    • International Journal of Railway
    • /
    • v.2 no.1
    • /
    • pp.1-7
    • /
    • 2009
  • The development of structural solutions for high-speed or very high-speed tracks that minimize total life cycle costs of the system is a key issue to improve the operational profitability of new investments. In opposition to conventional ballasted tracks, slab track solutions can be a cost-effective solution, but only in the cases where the benefits due to the increase in track availability and the reduction of track maintenance offsets its much higher construction costs. In the cases where such investment is not feasible, it is worth to evaluate possible structural improvements to ballasted track that allow reducing its maintenance needs without increasing too much its construction costs. This paper evaluates the design requirements and the impact of improving conventional high-speed ballasted tracks by using a bituminous subballast layer. It is divided into two main parts: first the design requirements of the structural solutions with bituminous subballast and its possible benefits on high-speed track deterioration, and secondly the evaluation of the economic impact, in terms of construction costs, of using this structural solution material in future Spanish high-speed lines.

  • PDF

Experimental Study to analyze Effect of Rail Corrugation Reduction according to Rail Grinding (레일연마에 따른 레일 파상마모 저감 효과 분석을 위한 실험적 연구)

  • Choi, Jung-Youl;Jeong, Cheon-Man;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.801-806
    • /
    • 2021
  • Rail corrugation is continuously increasing due to the lack of maintenance regulations for the amount of rail irregularities. Rail corrugation is causing various problems, such as a decrease in ride comfort and an increase in the amount of track maintenance. In this paper, the effect of rail corrugation on the track force was analyzed by measuring the rail irregularities before and after rail grinding and the track measurements (dynamic wheel load, displacement, and acceleration) for the section where the rail corrugation occurred. In addition, it was experimentally proven that the rail grinding performed to reduce the corrugation of the rail was very effective in reducing the additional forces on the track.

Analysis of Tuning Unit Characteristic for Track Circuit Maintenance Efficiency (궤도회로의 유지보수 효율화를 위한 동조 유니트 특성 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyen;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3594-3599
    • /
    • 2009
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. The ATC data related to speed and space control for trains are transmitted from wayside to onboard by way of UM71 AF track circuits and BSP Loop. The information transferred by track circuits is composed of operation data which directly influence to the train operation and the information transferred by BSP Loop is used in the section which requires the additional data transmission about the particular track-side environment such as tunnel, hot box detector or insulated section. In this paper, for the BA type turning unit of the UM71 AF track circuits which is mainly used in the linking section of existing and high-speed lines from the opening of the Gyeongbu line till the present, we not only analyze the characteristics of BA but also compare and analyze baseline values and the measured values. With this analysis, we will be able to propose how to solve the problems about operation and maintenance such as track circuit malfunctions of the relevant sections.

Measurement and analysis of support stiffness of the track which rubber ballast-mat installed (방진자갈매트구간 궤도지지계수 측정 및 분석)

  • Yang, Shin-Chu;Lee, Jee-Ha;Kim, Eun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1071-1076
    • /
    • 2007
  • In high-speed line, at some part of the track which rubber ballast-mat installed, track irregularity grew rapidly and affected riding comfort and train running stability. It is urgently requested to establish counter-measures which can be applied to track under operation. To do this, it is very important to analysis the origin of that phenomenon before. Track support stiffness is an essential factor for evaluating track condition. Sudden changes of support stiffness along track occur instability of train and bad riding comfort. Preventing sudden changes of track support stiffness is a key technique in high-speed track maintenance. Besides the sudden changes, the magnitude itself also significantly affects track and train. Low stiffness of ballast-mat makes ballast acceleration area wider. And it may accelerate track irregularity growth. So, the stiffness should be limited. To calculate track stiffness, measuring load and displacement on track is needed. In this study, the behavior of the track which rubber ballast-mat installed was measured and analyzed to understand the origin of rapid growth of it.

  • PDF

Construction and Evaluation of the Paved Track on Test Line (도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가)

  • Lee, Il-Wha;Shim, Jae-Gyu;Lee, Choon-Ho;Park, Kyun-Seo;Ryu, Kyoung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF