• Title/Summary/Keyword: Tower-Crane

Search Result 116, Processing Time 0.027 seconds

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

Analysis of Conceptual Models and State-of-the-Art Technologies for the Automation of Telescoping Work in Horizontal Tower Cranes (수평형 타워크레인 텔레스코핑 작업의 자동화를 위한 개념 모델 및 요소기술 분석)

  • Lee, Sang-Ho;Kim, Young-Suk;Lee, Jeong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.705-717
    • /
    • 2011
  • The number of horizontal tower cranes, major hoisting machineries for lifting approximately 50% of entire materials in construction projects, is rapidly increasing, but a number of accidents related to the tower cranes are being continuously occurred in construction sites as well. In particular, telescoping works in the horizontal tower cranes have showed the greatest safety concerns such as falls and collapses. It is due to the fact that tasks inserting a new mast in the space made after raising telescoping cage by fluid pressure and ascending it to the required height in the telescoping works include a series of dangerous factors in safety aspects, and might cause very serious and unexpected accidents in construction sites. The primary objective of this research is to propose two conceptual models for automating the telescoping work in horizontal tower crane and conduct their technical feasibility analyses. In this study, a design concept, a position control system using hydraulic cylinders is suggested as a better alternative for automating the telescoping work. Its potential safety improvement rate compared to the conventional method is also analyzed and presented in this study.

Safety Assessment for Installation of Deck Crane by Lifting (데크 크레인의 리프팅 설치 작업에 대한 안전성 평가)

  • Ryu, Hyun-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.3680-3684
    • /
    • 2015
  • A deck crane is installed on the deck of a ship by lifting method using tower crane or floating crane. The safety assessment for two points lifting method should be preceded to ensure a safe installation of deck crane. In this study, finite element models of deck crane and fixing jig are generated for the structural analysis which can evaluate a safety of lifting method. Also, reaction forces and boundary conditions considering lifting state are applied to the structural analysis. The proposed safety assessment method can be useful as an analytic tool that can provide a safer procedure for installation of deck crane by lifting method.

Analytical method for the out-of-plane buckling of the jib system with middle strut

  • Wang, T.F.;Lu, N.L.;Lan, P.
    • Steel and Composite Structures
    • /
    • v.21 no.5
    • /
    • pp.963-980
    • /
    • 2016
  • The jib system with middle strut is widely used to achieve the large arm length in the large scale tower crane and the deployability in the mobile construction crane. In this paper, an analytical solution for the out-of-plane buckling of the jib system with middle strut is proposed. To obtain the analytical expression of the buckling characteristic equation, the method of differential equation was adopted by establishing the bending and torsional differential equation of the jib system under the instability critical state. Compared with the numerical solutions of the finite element software ANSYS, the analytical results in this work agree well with them. Therefore, the correctness of the results in this work can be confirmed. Then the influences of the lateral stiffness of the cable fixed joint, the dip angle of the strut, the inertia moment of the strut, and the horizontal position of the cable fixed joint on the out-of-plane buckling behavior of the jib system were investigated.

Structural analysis of a planetary gear carrier in the slewing reducer for tower crane (타워크레인 선회감속기용 유성기어 캐리어의 구조해석)

  • Cho, Seung-Je;Han, Jeong-Woo;Park, Young-Jun;Lee, Geun-Ho
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.13 no.5
    • /
    • pp.1-7
    • /
    • 2014
  • In this paper the structural analysis of a planet carrier was carried out for the design optimization of a slewing reducer used in tower cranes. The stress changes of the planet carrier according to the tolerance of interference fit were investigated, and the strength was evaluated on the basis of the stress level. The analysis results showed that the tolerance of interference fit have an important influence on the stress level of the planet carrier. To guarantee the static safety of carrier, the tolerances of carrier pinhole and planet pin as well as loading level exerted on the planet carrier should be determined considered correctly.

Design and Application of Self-Lifting & Slewing Multi-Cranes Platform

  • Kun Zhang;Kaiqiang Wang;Bo Chen;Qing Sun;Hui Yang;Xin Ba;Jinming Zhao
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.103-114
    • /
    • 2022
  • Tower crane is of great importance in the construction of high rise buildings. A self-lifting & slewing multi-cranes platform (referred to as crane slewing platform) was developed to optimize the configuration of tower cranes, as well as solve the problems of cooperative operation conflict between multiple cranes and other construction equipment and their respective climbing and occupying of construction period. The design and test of the slewing platform was introduced. By applying the slewing platform in the construction of Chengdu Greenland Center super high rise building project, some key technologies such as the configuration of cranes, the installation, construction and lifting of the slewing platform are implemented and validated. Up to now, the slewing platform has been safely lifted up 98 times in Chengdu Greenland Center project construction, and achieved good social and economic benefits.

OPTIMAL DESIGN ALGORITHM OF THE FOUNDATION OF TOWER CRANES

  • Kim, Sun-Kuk;Kim, Jang-Young;Ryu, Sang-Yeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1047-1052
    • /
    • 2009
  • As buildings nowadays become taller in height and larger in size the safety review of lifting plan takes larger portion in construction project management. However, the cost and safety in lifting plan have a contradictory effect on each other. Therefore, an optimization algorithm needs devising as a solution of the contradictory problem. In many cases at construction sites, selections and stability review of tower cranes are assigned to equipment suppliers or field managers, which cause the problems in safety and cost of the projects. To improve the part of the current situation, a study on the optimization algorithm for designing the foundation of tower cranes is conducted in this study, which can be utilized by equipment suppliers or field managers to check the stability of tower cranes easily and promptly without substantial knowledge.

  • PDF

Outcomes of the Tower Crane Technique with a 15-mm Trocar in Primary Spontaneous Pneumothorax

  • Chong, Yooyoung;Cho, Hyun Jin;Kang, Shin Kwang;Na, Myung Hoon;Yu, Jae Hyeon;Lim, Seung Pyung;Kang, Min-Woong
    • Journal of Chest Surgery
    • /
    • v.49 no.2
    • /
    • pp.80-84
    • /
    • 2016
  • Background: Video-assisted thoracoscopic surgery (VATS) pulmonary wedge resection has emerged as the standard treatment for primary spontaneous pneumothorax. Recently, single-port VATS has been introduced and is now widely performed. This study aimed to evaluate the outcomes of the Tower crane technique as novel technique using a 15-mm trocar and anchoring suture in primary spontaneous pneumothorax. Methods: Patients who underwent single-port VATS wedge resection in Chungnam National University Hospital from April 2012 to March 2014 were enrolled. The medical records of the enrolled patients were reviewed retrospectively. Results: A total of 1,251 patients were diagnosed with pneumothorax during this period, 270 of whom underwent VATS wedge resection. Fifty-two of those operations were single-port VATS wedge resections for primary spontaneous pneumothorax performed by a single surgeon. The median age of the patients was $19.3{\pm}11.5$ years old, and 43 of the patients were male. The median duration of chest tube drainage following the operation was $2.3{\pm}1.3days$, and mean post-operative hospital stay was $3.2{\pm}1.3days$. Prolonged air leakage for more than three days following the operation was observed in one patient. The mean duration of follow-up was $18.7{\pm}6.1months$, with a recurrence rate of 3.8%. Conclusion: The tower crane technique with a 15-mm trocar may be a promising treatment modality for patients presenting with primary spontaneous pneumothorax.

Automatic Arrangement Algorithm for Tower Cranes Used in High-rise Apartment Buildings

  • Lim, Chae-Yeon;Kim, Sun-Kuk;Seo, Deok-Seok;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.358-368
    • /
    • 2012
  • On most construction sites, the arrangement of tower cranes is decided by site engineers based on their own experience, which can cause cost overruns and delays in the lifting work. Although many researchers have conducted studies on tower crane arrangement using computer modeling and knowledge-based expert systems as well as mathematical models, no research has aimed to develop an algorithm to identify an optimum solution among several alternatives for installation areas of tower cranes satisfying the conditions of lifting work. The objective of this study is to develop an automatic arrangement algorithm for tower cranes used in high-rise apartment construction. First, as a new concept, a possible installation area of tower cranes was suggested. Second, after proposing several alternatives based on the installation points suggested in this study, an algorithm analyzing the economic feasibility of tower cranes was developed considering the rental, installation and removal costs. Third, a case study was conducted to prove the validity of the developed algorithm for selecting and installing an effective set of tower cranes at minimum cost.