• 제목/요약/키워드: Total Project Management System

검색결과 226건 처리시간 0.025초

전산지원도구를 이용한 철도안전 성능평가 시험설비 구축 사업 관리방안 연구 (A Study on Managing the Construction Process of Railway Safety Test Facilities Using the Systems Engineering Tool)

  • 김윤미;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1505-1510
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as trains, track facilities, human factors, operation & control and maintenance. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. Recently, various systems engineering tools such as CORE or Cradle are applied to manage the system requirements and the project management process in the part of the aerospace engineering and automobile engineering so on. The railway industry also makes an effort to develop an efficient management skills using systems engineering tools as the railway system is multi-disciplinary. Therefore, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.

  • PDF

민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로 (A Study on the Improvement of Total Cost Change Control in Private Investment Projects)

  • 김세종;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.119-126
    • /
    • 2001
  • 국내에서 대규모로 진행되고 있는 민간투자사업의 시행에는 많은 난제들이 산재해 있으며, 특히, 민간의 창의와 효율성을 극대화하고자 $\lceil$사회간접자본시설에 대한 민간투자법$\rfloor$ 에 명시된 총사업비 사전확정 및 사후정산 금지규정은 사업비변경과 관련하여 정부와 사업시행자간 분쟁의 요소를 제공하고 있다. 본 연구에서는 민간투자사업의 총사업비 변경에 관련된 문제점들을 파악하고, 그의 개선을 위한 총사업비변경 관리방안을 사업관리요소인 계약·조직·정보·비용·공정관리의 틀로서 접근, 분석하였다. 계약관리의 측면에서 실시협약 관련조항의 표준안을 구축하고, 조직관리의 측면에서 업무범위를 명확화한 업무플로우를 수립하고자 하였다. 아올러 정보관리의 측면에서 설계서 변경관리의 효율화를 위한 도면, 문서관리시스템(DMIS)을 제안하고, 비용·공정관리의 측면에서 실공정과 일치되는 통합 내역관리방안을 제시하고자 하였다.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

모델기반 시스템엔지니어링 접근을 통한 철도안전 시험설비구축 사업 관리체계 개발 (Developing the Management System of the Constructing Railway Safety Test Facilities Using the Model-Based Systems Engineering Approach)

  • 김윤미;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1964-1969
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as rolling stock, power, signal control, communications, tracks, stations, operation control systems, and so on. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. To support that, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the model-based systems engineering tool to the research.

  • PDF

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • 제4권3호
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.

농촌마을종합개발사업의 기본계획 사업비 특성분석 (Characteristics Analysis on Budget Distribution of Master Plan for Comprehensive Development Projects of Rural Villages)

  • 김대식;이승한
    • 농촌계획
    • /
    • 제17권1호
    • /
    • pp.13-27
    • /
    • 2011
  • This study analyzed the budget investment plans for the unit-project items(UPI) of 176 project districts for the rural village comprehensive development projects (RVCDP). This study classified the master plan reports of 176 project districts into 88 unit project items in aspect of project management, in order to analyze characteristics of distribution of budget in each project item. Most of all unit project items have similar types of uniform distribution with plus skewness in frequency pattern analysis except the total budget of the project district. This study analyzed the characteristics of budget distribution per province, year, and geographical types of region. Furthermore this paper also analyzed ratio of budget in unit project items to find out distribution pattern of each budget between project items over time. The hierarchical system for UPI of RVCDP consisted of three steps, which are 4 items of the first step on Strength of Rural-urban Exchange & Regional Capability (RURC), Green-income Infrastructure & Facility (GIF), Culture- health-welfare Facility, and Eco-environment & Landscape facility (ELF), 13 items for the second one, and 52 items for the third project items. From the results of the budget investment analysis for 5 years from 2004 to 2008, the budget investment ratios of RURC and ELF have steady state for every year, while GIF in decreasing and ELF in increasing over time. The ratios of UPI on infrastructure were decreased, whereas those on culture, health, and welfare were increased. Portion of tow project items among 52 items, which are community centers for village residents and rural experimental study facility, has 30% of total budget investment. Futhermore, the budget ratios of seven project items showed 50% of total budget. Average value of project budgets for five years was optimized as a type of exponential function in the case of decent array for ranking order.

Research on Managing Underground Facilities for an Intelligent City

  • Kim, Jung-Hoon;Lee, Jae-Yong
    • Spatial Information Research
    • /
    • 제16권4호
    • /
    • pp.421-439
    • /
    • 2008
  • 본 연구의 최종목표는 7대 시설물의 주요 정보를 획득하기 위해 지하 환경에 적합한 센서 네트워크(USN: Ubiquitous Sensor Network)를 개발하여 지하시설물의 모니터링 및 긴급처리와 통합관리시스템 개발을 통하여 지능형 도시지하시설물 관리체계를 구축하는 것이며 이를 위하여 국토연구원을 포함한 5개의 기관이 공동으로 연구 과제를 수행하였다. 총 6차년 도에 걸쳐 UFSN(Underground Facility Sensor Network) 기반의 지능형 관리체계를 구축하는 것을 목표로 우선 $1{\sim}2$차년 도에는 상하수도에 초점을 두고 지하시설물 관리체계 구축기반기술 연구에 중점을 두었다. 국토연구원에서는 지하시설물 통합관리 기술개발을 위해 기존 상하수도 단위 업무시스템 연계방안을 연구하였고 모니터링 기술개발을 위해서 상하수도 모니터링 항목을 도출하였으며 신규/기설 지하시설물별 센서 설치방안에 대한 기초 연구를 수행하였다. 본 연구는 국토연구원에서 수행한 $1{\sim}2$차년 도의 연구 성과를 토대로 작성되었다.

  • PDF

주요 건물군의 유사도 정량화 측정 시스템 (Quantitative estimation system development for project similarity)

  • 이은지;최병일;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2014
  • Operation and maintenance stage consists the largest portion of project life cycle cost. Appropriate management and analysis of such stages have massive effect on the total project cost. The effective prediction of optimized repair period is one of main factors in ㅌ management. However, it has been analyzed that the prediction of appropriate repair period revealed limitations in reliability. Therefore, this study suggests a methodology of repair period prediction by dividing finished projects into similar groups with same properties to be compared with the target project using quantitative variables.

  • PDF

교육시설물 BTL 사업의 유지관리 시스템 모듈 개발 (Development of Maintenance Management System Module in BTL Project for Educational Facilities)

  • 이은동;손재호;김재온
    • 한국건설관리학회논문집
    • /
    • 제8권5호
    • /
    • pp.132-141
    • /
    • 2007
  • BTL 사업 대상 중 교육시설물은 교육인적자원부에 따르면 2007년까지 3개년에 걸쳐 13조원 이상 규모의 BTL 민간투자 사업을 발주하기로 하는 등 교육시설물의 건설은 국내 공공시설물 건설 사업에서 큰 비중을 점하고 있다. 본 연구에서는 교육시설물 BTL 사업의 비용 항목 중 운영관리비에 해당되는 위생관리비 산정 방법을 제시하였다. 또한 이를 바탕으로 유지관리 시스템의 주요 모듈을 개발하고, 개발된 모델의 타당성을 입증하기 위해 대안별 비용의 비교 분석을 실시하였다.

건설산업과 조직(생산시스템의 개혁을 위한 원론적 고찰) (A Study on Innovation of Construction Industry & Project Operation System)

  • 이재석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.19-26
    • /
    • 2002
  • 건축생산이라는 [사회적시스템]이 위치하고 있는 환경이 급변하고 있다. 소요건축물의 양적충만이 근 미래의 일이 되고, 목적의 다양화와 복잡화로 고려요소도 다기화 되고있다. 그에 수반하여 생산과정의 투명화 등이 요구되어 지금까지의 건축생산과는 기본적, 근본적으로 다른 접근이 요구된다고 할 수 있다. 이러한 환경변화를 능동적으로 소화하기 위하여, 건축생산 시스템의 본질을 재정의하고, 질적발전으로 재도약을 꾀하는 것이 본 연구의 취지이다. 즉, 건축생산에 참가하는 모든 주체의 자유로운 창조력을 중시하고 권한과 책임을 공평히 하며, 개방시스템의 장점인 경쟁성을 살려 유기적으로 통합하기 위하여, 시스템구성요소 인 프로젝트 프로세스, 관계주체, 조직화과정 등의 부분시스템과, 이러한 부분시스템이 특정문맥으로 조합된 생산시스템의 다양한 전형에 대하여 고찰했다. 이것은 다양한 요구에 대응하는 방법은 다양한 수단을 마련하는 것이라고 생각했기 때문이며, 프로젝트의 내외환경과 발주자의 의지에 따라 적절하게 전형을 선택하고, 생산시스템의 구체적 디자인을 문맥에 맞게 실행하기 위해서는 본 연구와 같은 원론적 고찰이 우선 필요하다고 생각했기 때문이다. 최근 주목을 받고 있는 매니지먼트 현재형 생산시스템이 존재의미도 본 고에서 논하는 PMP에 대한 이해 없이는 구조적으로 이해하기 어렵다.

  • PDF