• Title/Summary/Keyword: Top floor

Search Result 238, Processing Time 0.023 seconds

A Study on the Increase of Bearing Capacity of Soft Ground in Shallow Foundation Using High Density Rapid Expansion Material (고밀도 급속 팽창재를 이용한 얕은기초 연약지반의 지내력 증대에 관한 연구)

  • Ro, Euichul;Kim, Daehyeon
    • The Journal of Engineering Geology
    • /
    • v.30 no.2
    • /
    • pp.185-198
    • /
    • 2020
  • High-density rapid expansion material is a method that increases the solid volume of injection materials due to hydration and foam reactions at the same time as spraying. It is an effective method for securing ground stability, restoring subsidence, and loading during construction of structures. In this regard, through the mechanical experiments of injection materials, the stability of the foundation ground of the structure and the effect of increasing the endurance using site construction were analyzed. The results of the experiment showed that the unit weight of soil decreased by 10.5% after injection of the filling material, and the allowable support for the structure was deemed safe, and the subsidence by each section after ground improvement was determined to be safe at 2.28, 1.55 and 0.46 cm, respectively, with an acceptable subsidence of less than 5 cm. After the field test, five inclinometers were installed on the top floor of the target building to measure the displacement of the X and Y axes. As a result of the measurement, no displacement related to the phenomenon of inequality or subsidence cracks of the structure was measured for about 16 months (509 days) after construction. This can be judged to be a sufficient increase in the stability of the ground after the injection of rapid expansion.

The Investigation on the Behavior of Beam-Column Joint with High and Low Strength Concerte (고강도와 보통강도 콘크리트를 사용한 보-기둥 접합부의 구조적 거동)

  • 신성우;이광수;문정일;안종문;박희민;장일영
    • Magazine of the Korea Concrete Institute
    • /
    • v.4 no.1
    • /
    • pp.119-126
    • /
    • 1992
  • AC] 318-H9 Recommended that when the specified compressive strength of concrete in a column is greater than 1. 4 times that specified for a floor system, top surface of the colurrm concrete shall extend 2ftU;OOrrun) into the slab from the face of colUlml to avoid unexpected brittle failure. The purpose of this investigation is to suggest the basic information for the structural safety, The major variables are com preSSlve strength of concrete, shear confinement ratio, and loading types. The test results showed that the load capaCIty of speCImen subjected to monotOI1lC loading had more than that of specimen subjected to one way cyclic loading. The failure modes of specimens under cyclic loading were concentrated at 5-20cm apart region from beam-column joint face and ductility index are increased with increasing of shear confinement ratio. Keywords: ACI 318-89, High and Low Strength Concrete, Beam-Column Joint, Shear Confinement Ratio, Loading Type, Ductility Index, Extension Distance.

Evaluation of Suction Installation for the Circular Pipe into Low-water Sandy Ground via Model Test (모형실험을 활용한 저수심 사질토 지반에서 원형강관 설치 석션압 평가)

  • Xin, Zhen-Hua;Kim, Jae-Hyun;Lee, Ju-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.1-10
    • /
    • 2021
  • In this study, a circular pipe can be installed by suction pressure for construction on soft ground with a low-water level. A series of laboratory-scale model tests were conducted in sandy ground to comprehend the suction pressure of the circular pipe in low-water levels. For repeated tests on saturated sandy soil, a container was mounted with three vibration generators on the floor. A repetitive vibration was applied using the vibration system for ground compaction. In the model tests, different diameters and thicknesses on saturated sandy soil with a water depth were considered. The result showed that the suction pressure increased with increasing penetration depth of the circular pipe. Moreover, the suction pressure required to penetrate the pipe decreased with increasing diameter. In the low-water level, the total suction pressure measured at the top lid increased because additional suction pressure is required to lift the water column. On the other hand, this led to a decrease in suction pressure to penetrate the circular pipe because the weight of the water column is applied as a dead load. Therefore, it is necessary to consider the water level to design the required suction pressure accurately.

Radon concentration measurement at general house in Pusan area (부산지역 일반주택에서의 라돈농도측정)

  • Im, In-Cheol
    • Journal of radiological science and technology
    • /
    • v.27 no.2
    • /
    • pp.29-33
    • /
    • 2004
  • Until early 1980s we have lived without thinking that radon ruins our health. But, scientists knew truth that radon radioactive danger is bedeviling on indoor that we live for a long time. Specially, interest about effect that get in danger and injury for Radon and human body is inactive in our country. Recently, with awareness for Radon contamination, We inform about importance and danger of Radon in some station of the Seoul subway, indoor air of school facilities and We had interest with measure and manages. Usually, Radon gas emitted in base of building enters into indoor through building floor split windage back among radon or indoor air of radon daughter nucleus contamination is increased. Therefore, indoor radon concentration rises as there are a lot of windages between number pipe of top and bottom and base that enter crack from estrangement of the done building floor, underground to indoor. Thus, Radon enters into indoor through architecture resources water as well as, kitchen natural gas for choice etc., but more than about 85% from earth's crust emit. Danger and injury of health by Radon and Radon daughter nucleus that is indicated for cause of lung cancer incerases content of uranium of soil rises specially from inside pit of High area and a mine, cave, hermetical space with house. Safe sub-officer of radon concentration can not know and danger always exists large or small during. So, Important thing reduces danger of lung cancer by lowering concentration of Radon within house and building. Therefore, is thought that need general house Radon concentration measurement, measured Radon concentration monthly using Sintillator radon monitor. Study finding appeared high all underground market 1 year than the ground, and the winter appeared high than the summer. Specially, month that pass over 4pCi in house that United States Environmental Protection Agency advises appeared in underground, and appeared and know Radon exposure gravity by 4 months during 12 months. Therefore, Thinking that establishment and regulation of norm and preparation of reduction countermeasure about Radon are pressing feels, and inform result that measure Radon concentration.

  • PDF

A Study on Effective Management & Administration System for Deluxe Hotel Kitchen in Seoul Area. (관공호텔 조리직무의 분업과 통합에 따른 문제점과 개선방안에 관한 연구)

  • 라영선
    • Culinary science and hospitality research
    • /
    • v.1
    • /
    • pp.57-89
    • /
    • 1995
  • Despite prologed business stagnation of both international and domestic economy, hotel business as well as tourist industry has continuously been keeping growing, owing to increase of surplus income and world flowing population. During recent 4 years, growth rate of yearly mean in domestic hotels reached 9.9% and especially that of the superior class hotels 15.2%. In the composition of domestic tourist hotel's revenue, the earnings of guest rooms form 37.4%, on the other hand those of food & beverage 39.9%. This result is that our hotel business is concentrated on its interest in FOOD & BEVERAGE of which productivity per unit dimension can be increased to an unlimited extent and extent and superior class hotels strengthened in F&B are increasing in comparison with European or American hotels which are focused on guest rooms in their management. For value added rate of F&B is low as compared with increase of their earnings, they are interested in the management techniques which focus on rising the rate. As for the cost of Food & Beverage, personnel expenditure forms 36.5% and the direct materials 31.5%. Therefore how to manage personnel and materials costs which compose as much as 68% of total revenue will greatly affect net profit. We can say that an effective management technique in cost of Food & Beverage is one of the most important know-hows in hotel management. Especially management know-how for the Kitchen Department where the most of foods come out makes a great effects on various expenses, productivity and it is the achievement from hotel management. For the most of the hotel's top managers, they don't seriously take the fact that KITCHEN SYSTEM affects greatly total expenditure. This study starts from the point of recognizing the question of fundamental cause affecting tow largest cost elements incurred in Food & Beverage and trying to present an effective kitchen system. To settle the questions raised, I compared and analyzed productivity and cost of food & beverage and unit kitchen centered around superior class hotels in Seoul, which vary in Kitchen Systems. In order to attain the aforementioned study effectively purpose of this study, I compared Room-Service and Coffee-Shop Menu, flow of basic food in the kitchen, extent and result of division of labor and integration in the kitchen, scale of outlet kitchen, productivity, the turnover rate of food in store, food cost rate one another which all vary in Kitchen Systems. All these elements are compared and analyzed each other being divided into two main groups such as①. Main Production kitchen and Banquet Kitchen, and ②. coffee-shop kitchen and Room-service Kitchen. Therefore this study is to point out the problems in managing kitchens of superior class hotels which are different in systems. An effort was made to find out the better Kitchen System for superior deluxe hotels. I emphasize the followings on the proper scale of division of labor and integration of unit kitchen and a disposition plan for outlet kitchens of restaurant. First, KITCHEN SYSTEM as a sub-system of Hotel Management System is composed of sub-systems of outlet unit kitchen. Basic food materials are cooked and served for the guests while support kitchen and out restaurant kitchen interact organically each other. So Kitchen should be considered as a system composed of integrated sub-systems. Second, support and banquet kitchens should be integrated to be managed. And these unit kitchens have to be designed to be placed in the back of banquet rooms area. Third, coffee-shop kitchen and room-service kitchen should be integrated to be managed. Fourth, several unit business kitchens should be place on the same floor. Fifth, main production kitchens ought to be located near the loading duck, food store and large refrigerator. Sixth, considering the limits of supervision, duties should be adjusted as 12-20 cooks in two shifts a day for a sub-kitchen, and 18-30 cooks in three shifts a day so that labor division can be made. Last, I would like to two points for direction and task of future study. Firstly, I compare the effective income and increasing costs each other, which are incurred by increasing the use rate of the second processing materials for foods perched outside and through the results. I can find out the better points of the processing production and circulation system, and then I study this effects made on hotel kitchen system. Secondly, I can point out that more efficient kitchen system shall be established through comparing and analyzing the matter of amount of indirect costs and flow of food in different kitchen systems.

  • PDF

Cyclic Seismic Testing of Cruciform Concrete-Filled U-Shape Steel Beam-to-H Column Composite Connections (콘크리트채움 U형합성보-H형강기둥 십자형 합성접합부의 내진성능)

  • Park, Chang-Hee;Lee, Cheol-Ho;Park, Hong-Gun;Hwang, Hyeon-Jong;Lee, Chang-Nam;Kim, Hyoung-Seop;Kim, Sung-Bae
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.4
    • /
    • pp.503-514
    • /
    • 2011
  • In this research, the seismic connection details for two concrete-filled U-shape steel beam-to-H columns were proposed and cyclically tested under a full-scale cruciform configuration. The key connecting components included the U-shape steel section (450 and 550 mm deep for specimens A and B, respectively), a concrete floor slab with a ribbed deck (165 mm deep for both specimens), welded couplers and rebars for negative moment transfer, and shear studs for full composite action and strengthening plates. Considering the unique constructional nature of the proposed connection, the critical limit states, such as the weld fracture, anchorage failure of the welded coupler, local buckling, concrete crushing, and rebar buckling, were carefully addressed in the specimen design. The test results showed that the connection details and design methods proposed in this study can well control the critical limit states mentioned above. Especially, the proposed connection according to the strengthening strategy successfully pushed the plastic hinge to the tip of the strengthened zone, as intended in the design, and was very effective in protecting the more vulnerable beam-to-column welded joint. The maximum story drift capacities of 6.0 and 6.8% radians were achieved in specimens A and B, respectively, thus far exceeding the minimumlimit of 4% radians required of special moment frames. Low-cycle fatigue fracture across the beam bottom flange at a 6% drift level was the final failure mode of specimen A. Specimen B failed through the fracture of the top splice plate of the bolted splice at a very high drift ratio of 8.0% radian.

Magmatic Evolutions based on Compositional Variations with Time in the Maljandeung Tuff, Ulleung Island, Korea (울릉도 말잔등응회암에서 시간에 따른 조성변화에 근거한 마그마 진화)

  • Hwang, Sang Koo;Lee, So-Jin;Ahn, Ung San
    • The Journal of the Petrological Society of Korea
    • /
    • v.28 no.2
    • /
    • pp.111-128
    • /
    • 2019
  • Ulleung Island is the top of an intraplate alkalic volcano rising 3200 m from sea floor in the East Sea (or Sea of Japan). The emergent 984.6 m consist of eruptive products of basaltic, trachytic and phonolitic magmas, which are divided into Dodong Basaltic Rocks, and Ulleung, Seonginbong and Nari groups. The Maljandeung Tuff in the Nari Group consists of thick pyroclastic sequences which are subdivided into 4 members (N-5, U-4, 3, 2), generating from explosive eruptions during past 18.8~5.6 ka B.P. From chemical data, the Member N-5, phonolitic in composition, is considerably enriched in incompatible elements and REE patterns with significant negative Eu anomalies. The members 4, 3 and 2 are phonolitic to tephriphonolitic in composition, and their REE patterns do not have significant Eu anomalies. In variation trend diagrams, many elements show abrupt compositional gaps between members, and gradual upward-mafic variations from phonolite to tephriphonolite within each member. It suggests a downward-mafic zonation that were evolved into phonolitic zone in the lower part to tephriphonolitic zone in upper part of magma chamber. It is supposed that the chemical stratification generated from multiple mechanisms of thermal gravidiffusion, crystal fractionation, and gradual melting and sequential emplacement. The stratified magmas were explosively erupted to generate a small caldera during short period (11 ka B.P.). Especially both members (U-3, 2) were accumulated by gradually erupting from the upper phonoltic zone to the lower tephriphonoltic zone of the stratified chamber in 8.4 ka B.P. and 5.6 ka B.P. time, respectively.

A Study of collapsed conditions of the stone pagoda in Mireuk Temple Site (미륵사지석탑 붕괴상태 고찰)

  • Kim, Derk-Moon
    • Korean Journal of Heritage: History & Science
    • /
    • v.38
    • /
    • pp.305-327
    • /
    • 2005
  • Although the stone pagoda in Mireuk Temple site, Iksan, Cholla Province has been collapsed long time ago, few historical record has clearly explained the reason why the pagoda was collapsed and when. The west side of the pagoda have been destroyed from top to the sixth floor and the broken or damaged stone materials have been piled up in disorder. the lower part in the west was reinforced and enclosed by a stone embankment levelled to the height of the first storey of the pagoda. With no record informing the historical fact when it was made and by whom, it is only presumed that the embankment may have been built long time ago in order to prevent remains from further destruction. In the second chapter of the study, it has been tried to restore a reasonable historical background of the pagoda based on records or comments found in literatures such as traditional poetry and essays in chronological order. The collapsed slope in the west side, just above the embankment surrounding the lower part of the pagoda, was concreted in 1915 during the Japanese colonial period. Then in 1998, the Jeollabukdo has examined the structural safety of the pagoda. The Cultural Properties Committee has decided have the concrete layer removed and moreover to take apart the whole pagoda. It is also included that the disassembled stone materials should be given proper conservation treatments before being put into the place where they were in the reassembling process. The front view of the collapsed phase of the pagoda was revealed when the concrete-covered layer was removed. A hypothesis was built that there may be as many different appearances of collapsed pagoda depending on natural causes such as earthquake, sunken foundation, flood and typhoon. In chapter three, characteristic features were classified by examining various images of pagodas destroyed by different natural reasons mentioned in historical records. The chapter four dealt with comparison and analysis on the conditions shown in the stone pagoda in Mireuk Temple site and other examples studied in advance. The result of the study revealed that though having been made higher than the ground surface, the podium or the base of the pagoda actually has been eroded by rain and water. The erosion is supposed not only to have been proceeded for a long time without break but also to have caused the first storey body stone in the west inclined to outward. It has come to a conclusion that the pagoda may have been lead to collapse when the first storey body stone, supporting the whole weight from the upper storeys, became out of upright position and lost its balance. However, no such distinctive features of structural changes shown in pagodas collapsed by natural causes like earthquake, typhoon or sunken basement, have been found in the stone pagoda in Mireuk Temple site.