• Title/Summary/Keyword: Tool Cost

Search Result 1,591, Processing Time 0.024 seconds

Prototype Development of PDM System with Target Costing Function (원가기획기능을 갖는 PDM 시스템의 시작품 개발)

  • 홍민선;임석철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.85-95
    • /
    • 2000
  • Since the cost of a new product is determined mainly at the design stage, systematic tools to support the new product to be manufactured at the predetermined cost is very important for successful introduction of a new product. PDM is a tool to support engineers to integrate product data throughout the product development. In this paper, we introduce a prototype of PDM system which has a target costing function, where cost estimation is coupled with structured product data.

  • PDF

An Approach of Cost-Benefit Analysis for GIS Project Evaluations (지리정보 사업의 비용편익 분석의 고찰)

  • Kim, Woo-Gwan;Kim, Young-Hoon
    • Journal of the Korean association of regional geographers
    • /
    • v.4 no.2
    • /
    • pp.79-94
    • /
    • 1998
  • This study begins with emphasis on the approach to public policy development and the extent to which a GIS framework can be used to evaluate projects objectively. This paper relates to public policy making and the use of GIS as a strategic management tool rather than the development of GIS technologies which has been the focus of attention since the advent of the first generation GIS systems in the 1960s. In order to consolidate a view towards public policy, the aim of this study is to show the advantages of using GIS to generate results which could be evaluated by cost and benefit analysis giving options of the alternative methods to estimate the feasibility of projects (both tangible and intangible) in a real public policy scenario. This study also reports that the tangible benefits associated with the GIS projects are better information processing, the easy analysis of data and the cost savings of map updates and printing, whilst the intangible benefits include quality decision making, and precise management of data through computing networks. In GIS context, the task of analysing and evaluating GIS projects is assumed in order to facilitate scientific and quantitative cost-benefit analysis. Previous methods of the cost-benefit analysis has not fully supported the evaluation of the intangible benefits and it has not been possible to make public policy realistic or scientifically understandable limiting decision makers in public domain. With the GIS decision makers are able to explore the potential of projects with this powerful decision supporting tool in practical application. On the basis of its potentials and limitations to cost-benefit analysis, therefore, it can be concluded that more flexible analysis and evaluation methodologies are needed to extend into the intangible benefits. In order to balance the evaluation of both quantitative and qualitative approaches on the cost-benefit analysis new or additional utilities will be required for the next GIS generation appraisal tool.

  • PDF

An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost (건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석)

  • Lee, Sung-Goo;Shin, Hyun-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안분석 연구)

  • Min, Sung Ki;Kim, Chul Whan;Kim, Kyoung Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.1-13
    • /
    • 2005
  • The purpose of this paper analyze development feasibility and alternatives for infrared detector development in both technology and cost. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 10 2008 year. We got raw input data from development and technical expert, and then analyze cost and technology for development feasibility, and alternatives study. Technology level is analyzed by TRL(Technology Readiness Level) and AOA(Analysis of Alternatives) is done by development cost estimate. Estimating the development cost, we use SEER-H that is parametric cost estimating tool based on Knowledge Base. This study can help those who are related to the cost and development feasibility analysis of other weapon systems.

  • PDF

Application of Quality Cost Model ln Quality Improvement Area (품질개선분야에서의 품질코스트모델의 적용)

  • Chung, Young-Bae;Kim, Yon-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.71-78
    • /
    • 2011
  • This parer proposes application of quality costing system in quality improvement area. Cost of quality in quality improvement area provides a valuable of both providing the need for improvement and giving a starting point for project. WQCMS(Web-based Q-Cost Management System) have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. Web-based quality cost management system to measure the performance of quality improvement activities in the business firms. This paper proposes standard model for quality cost process in quality improvement area.

Performance Evaluation of Scheduling Algorithms Using a Grid Toolkit(GridTool2) (그리드 툴킷인 GridTool2를 사용한 스케줄링 알고리즘의 성능 평가)

  • Kang, Oh-Han
    • The Journal of Korean Association of Computer Education
    • /
    • v.18 no.3
    • /
    • pp.115-124
    • /
    • 2015
  • In this paper, we introduce a web-based scheduling toolkit(GridTool2), which can run simulation of scheduling algorithm in grid system. And we suggest new algorithms which apply additional communication costs to the existing MinMin and Suffrage scheduling algorithms. Since GridTool2 runs in web environment using server and database, it does not require a separate compiler or runtime environment. The GridTool2 allows variables such as communication costs on the web for performance evaluation, and shows simulation results on the web page. The new algorithm with communication costs was tested using GridTool2 to check for performance improvements. The results revealed that the new algorithm showed better performance as more workloads were incorporated to the system.

A Study on the Conceptual Design of Smart App Authoring Tool

  • Chang, Young-Hyun
    • International Journal of Advanced Culture Technology
    • /
    • v.3 no.2
    • /
    • pp.118-123
    • /
    • 2015
  • IT environment gets more complicated in terms of open platform, network standards, device design and hardware, etc. Smart network and application are in the fields of corporate as well as national competition for future fusion technology. In development environment focused on computers, the ideas of authoring tool have been presented in terms of improved software productivity. In smart environment where subdividing works are consecutively done, current authoring tool should be effectively updated for effective development of programs and easier access to business works. The basic concept of a new conceptual App development tool, Smart App Authoring Tool, which has been designed in this study and enables to apply on-site requirements to smart phones, is to develop Apps on the level using easy-to-learn Word or Excel in a computer. Therefore, this study is intended to design a conceptual Smart App Authoring Tool to optimize the cost and time for developing and maintaining new application services under various smart phone platform environments. Based on the performance of smart app authoring tool herein, every people can develop a smart app program at moderate level. So this paper have designed a conceptual smart app authoring tool. This study presented educational efficiency of the authoring tool by developing business Apps under various business environments and applying them under university and high school environments.

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

Tool-Setup Monitoring of High Speed Precision Machining Tool

  • Park, Kyoung-Taik;Shin, Young-Jae;Kang, Byung-Soo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.956-959
    • /
    • 2004
  • Recently the monitoring system of tool setting in high speed precision machining center is required for manufacturing products that have highly complex and small shape, high precision and high function. It is very important to reduce time to setup tool in order to improve the machining precision and the productivity and to protect the breakage of cutting tool as the shape of product is smaller and more complex. Generally, the combination of errors that geometrical clamping error of fixing tool at the spindle of machining tool and the asynchronized error of driving mechanism causes that the run-out of tool reaches to 3$^{\sim}$20 times of the thickness of cutting chip. And also the run-out is occurred by the misalignment between axis of tool shank and axis of spindle and spindle bearing in high speed rotation. Generally, high speed machining is considered when the rotating speed is more than 8,000 rpm. At that time, the life time of tool is reduced to about 50% and the roughness of machining surface is worse as the run-out is increased to 10 micron. The life time of tool could be increased by making monitoring of tool-setup easy, quick and precise in high speed machining tool. This means the consumption of tool is much more reduced. And also it reduces the manufacturing cost and increases the productivity by reducing the tool-setup time of operator. In this study, in order to establish the concept of tool-setup monitoring the measuring method of the geometrical error of tool system is studied when the spindle is stopped. And also the measuring method of run-out, dynamic error of tool system, is studied when the spindle is rotated in 8,000${\sim}$60,000 rpm. The dynamic phenomena of tool-setup are analyzed by implementing the monitoring system of rotating tool system and the non-contact measuring system of micro displacement in high speed.

  • PDF

Machinability of ceramic and WC-Co green compacts (세라믹 및 초경합금 성형체의 피절삭성)

  • Lee, Jae-Woo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.9
    • /
    • pp.1520-1530
    • /
    • 1997
  • Machining pressed compacts of ceramic and WC-Co materials can be the most cost effective way of forming the bodies prior to sintering when the required number of pieces is small. In this study, in order to clarify the machinability for turning, the $Si_3N_4$ and the WC-Co green compacts unsintered were machined under different cutting conditions with various tools. Absorbing chips by vacuum hose decreases tool wear. The tool wear becomes larger in the order of the ceramic, CBN and cemented carbide tools in machining the $Si_3N_4$ green compacts. In machining the WC-Co green compacts, the tool wear becomes larger in the order of the ceramic, cemented carbide and CBN tools. The land of cutting edge does not affect tool wear. When machining with cemented carbide tool, the tool wear i equal cutting length is nearly identical in spite of the increase of cutting spee, and the roughness of machined surface was the best in the cutting speed of 90 m/min. The tool wear decreases with the increase of rake angle and relief angle and with the decrease of nose radius. The machined surfaces become worse with the increase of feed rate and depth of cut, and with the decrease of rake angle and relief angle. The tool wear is not affected by the feed and depth of cut.