• Title/Summary/Keyword: Time plan

Search Result 3,770, Processing Time 0.033 seconds

IGRINS Operation Plan and the status of the IGRINS Reduction Pipeline

  • Lee, Jae-Joon;Hwang, Narae;Park, Byeong-Gon;Yuk, In-Soo;Park, Chan;Le, Huynh Anh N.;Pak, Soojong
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.39 no.2
    • /
    • pp.94.2-94.2
    • /
    • 2014
  • After successful commissioning observations, IGRINS will soon begin its normal scientific operations on the 2.7m Harlan J. Smith telescope at the McDonald Observatory. We will present a working version of the IGRINS operation plan. A fraction of IGRINS guaranteed time will be devoted to a selection of strategic programs with legacy values, whereas the rest of the time will be used for normal programs. We will also describe the current status of the IGRINS data reduction pipeline package and its future development plan.

  • PDF

A Study on Business Process Patterns for Integrated Supply Chain Planning : Based on Analysis of RFQ Types (통합 공급망계획을 위한 비즈니스 프로세스 패턴 연구 : 견적요청 유형 분석을 바탕으로)

  • Jeong, Han-Il;Chang, Tai-Woo
    • Journal of Information Technology Applications and Management
    • /
    • v.15 no.1
    • /
    • pp.83-97
    • /
    • 2008
  • Today's competitive global market makes most enterprise endeavor to specialize their business areas, and co-operate with trading partners in supply chain by the forms of collaboration, information and business process sharing. However, even the supply chain plan generated by co-operation often fails to be executed successfully, because it was generated without capacities of suppliers and more over nested suppliers. To overcome this limitation, the supply chain plan of an enterprise should be generated truly integrated way. In this paper, we classify business patterns based on scenarios about quotation processing and supply chain planning in self-integrated environment. And we present business process models about four business patterns and describe them, which are classified by whether request for quotation includes information about price, required time periods, and quantity for each required time period and whether it is received from customer or sent to supplier. In addition, we describe the types of supply chain planning problem.

  • PDF

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

A Study on the Distribution Planning using Computer Systems (전산 시스템을 이용한 배전계획 연구 - CADPAD를 이용한 배전계획 -)

  • Hwang, S.Ch.;Moon, B.H.;Hong, S.H.;Jang, J.T.
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.205-207
    • /
    • 1993
  • Distribution planning requires comprehensive knowledge about not only distribution but also transmission/subtransmission system expansion plan. At the same time, distribution planning is very time consuming and a series of routine job which involves a lot of experience and efforts of planning engineers. Since the quality of distribution planning depends upon the ability of planning engineers, the economy of investment should be taken into consideration. The object of this study is to establish a computerized distribution planning system which helps distribution engineers finding a new system expansion plan. It provides the engineers with at optimal system expansion plan which satisfies the condition of both reliability and economy.

  • PDF

A Study of the Tower Crane Hoisting Time Estimation Simulation Model with Climate Element for the High-Rise Building Construction (기후요소를 고려한 초고층 건설공사의 타워크레인 양중시간 예측 시뮬레이션 모델)

  • Yang, Kanghyeok;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyeok;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.96-107
    • /
    • 2013
  • Tower crane hoisting plan is one of the key element for the success of entire High-Rise Building construction. Hoisting time is the basic factor to appropriate hoisting plan which need to the hoisting load estimate and tower crane selection. With this reason, accurate hoisting time is needed to the proper hoisting plan. The current hoisting time estimation for High-Rise Building focus on the hoisting cycle time estimation with historical data. However, this method underestimated the external influences like environmental factor. Thus, this paper aims to develop the hoisting time estimation model with discrete event simulation which include the wind influences with certain height. According to the simulation result, the hoisting time which applied wind influence is increasing with height growth. Because of the high speed wind, the upper area of building has more operation delay time than the mechanical operation time. Seoul, the research area, has the most fastest wind speed on April and the least on October. Due to these differences of wind speed, the hoisting time is estimated with significant differences between April and October. This hosting time estimation model would be used for estimating the influence of wind. Moreover, this could apply to make the realistic hoisting plan.

A Study on the Dynamic Export Yard Planning Considering Pattern of Coming-in Containers (반입 패턴을 고려한 동적 수출 장치장 운영 계획에 관한 연구)

  • Lee, Jong-Ho;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.337-339
    • /
    • 2007
  • The productivity of container terminal is usually regarded same as the productivity of quay crane. Operation of quay crane for the export is started from picking up a container in yard block. In doing so, smooth flow of container is vital to maximize the productivity of quay crane. Improvement of quay crane's productivity means improvement of entire productivity in container terminal, which reinforces the competitiveness of terminal consequently. Setting effective plan is essential to improve work flow from yard to quay crane. For optimal plan, it is necessary to gather information about exact time schedule of come-and-go containers for loading, amount of containers that will be come to terminal. Generally, the arrival time of containers and the amount of containers are definite and predictable. However, in the case of export container, the arrival time of containers is random and unpredictable. This study examines the pattern of coming-in containers as time goes in container yard and provides the solution to how to plan export yard considering the change of state in terminal and adapt it to container yard plan

  • PDF

Clinical Analysis of Inverse Planning for Radiosurgery ; Gamma Knife Treatment Plan Study (방사선 수술 역방향 치료계획 유용성 평가)

  • Jin, Seong Jin;Je, Jae Yong;Park, Cheol Woo
    • Journal of the Korean Society of Radiology
    • /
    • v.9 no.6
    • /
    • pp.343-348
    • /
    • 2015
  • The purpose of this study is a comparison of forward planning(FP) and inverse planning(IP) of a radiosurgery procedure. 10 patients of acoustic schwannoma MR image were used for treatment plan. FP-1,2 and IP were established under the same condition. FP and IP were compared by number of shot, conformity index(CI), paddic conformity index(PCI), gradiant index(GI) and treatment time. On average the treatment plan produced by IP tool provided an improved or similar CI, PCI, GI and reduced treatment time as compared to the FP (CI;FP-1:0.85, FP-2:0.86, IP:0.94, PCI;FP-1:0.79, FP-2:0.81, IP:0.78, GI;FP-1:2.94, FP-2:2.94, IP:3.01). The inverse planning system provides a clinically useful plan while reducing the planning time and treatment time.

The Study on Decline Plan of Primary Production Organic Matter of Uiam Lake Basin (의암호 유역에서 발생하는 자체생산 유기물 저감방안에 관한 연구)

  • 허인량;이건호;함광준;최지용;정의호
    • Journal of Environmental Health Sciences
    • /
    • v.30 no.1
    • /
    • pp.50-58
    • /
    • 2004
  • The present study was designed to evaluate primary production organic matter in basin of lake around by execution of total maximum daily loading. BOD influent loading of Uiam lake was 2,819 kg/day, which was less then 28.3 percent, total effuluent loading as 3,619 kg/day, in comparision with BOD, total nitrogen influent loading was 4,681 kg/day, which was less then 10.0 percent, total effuluent loading as 5,150 kg/day. But in case of total phosphors influent loading was 73.3 kg/day, which was more then 34.2 percent, total run off loading as 48.3 kg/day. The result of survey reduction plan of primary production organic matter in basin of lake around which objectives of abstract is as follows. First plan was reduction of primary production organic matter by moving the outlet of municipal wastewater treatment center from present place to lake downstream. Secondary plan was improvement by diffusion type of outlet municipal wastewater treatment center. The third plan was reduction of environmental impact by passing and storing of municipal wastewater. Finally plan was decline water surface level which was present hydrouric retention time was reduction from 7.6 day to 6.0 day per meter.

Analysis of Disaster Recovery System in Bank Industry (국내 금융권 재해복구시스템의 문제점 분석)

  • Kim Yong-soo;Baek Seung-Moon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.2 s.34
    • /
    • pp.223-229
    • /
    • 2005
  • DRS (Disaster Recovery System) that was invested on a large-scale becomes obsolete when it is neglected for a certain Period of time. Also the DRS can not be accomplished through the duplicated computer systems. When a disaster happens, the normal operation is possible only if the processes that had been being done before the disaster recover without any loss. Therefore the DRS is not a IT project but needs an analysis of whole business Processes and business continuity plans. This paper analyze the present state of DRS of the domestic bank industry and suggests a remedy.

  • PDF

A Study on Planning Aspects & Detaild Techniques of the Eco-school (Eco-School의 계획측면과 세부수법에 관한 연구)

  • Kang, Eun-Ju;Oh, Deog-Seong
    • KIEAE Journal
    • /
    • v.2 no.4
    • /
    • pp.27-39
    • /
    • 2002
  • The fields of green building and ecological design have much to offer to those who are seeking to improve the ecological impact of schools and school grounds. These well established disciplines are particularly useful to existing schools considering renovations to make them more energy, water, and resource efficient as well as healthier places to work and play, Green building and ecological design principles and techniques are also very effective, of course, if incorporated into the design for brand new school buildings. The major concept of the Eco-school plan is to understand that the school consists of an ecosystem, so the design concept should focus on minimising impact but at the same time maintaining close contact with the environment. T his is becoming the basic concept in applying the Eco-school design to the new 21st century school building. This thesis is an analysis on the methods of application, based on careful examination of case-studies from the U.S.A about detailed plan element and design method, through the following six aspects ; (1) site use plan, (2) green plan, (3) water system plan, (4) materials and recycling of resources, (5) energy use plan, (6) indoor environment plan.