• Title/Summary/Keyword: Time distribution method

Search Result 3,414, Processing Time 0.033 seconds

A Study on the Storage Life Estimation Method for Decrease of Muzzle Velocity using Gamma Process Model (감마과정 모델을 적용한 포구속도 저하량에 따른 저장수명 예측기법 연구)

  • Park, Sung-Ho;Kim, Jae-Hoon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.16 no.5
    • /
    • pp.639-645
    • /
    • 2013
  • The aim of the study is to investigate the method to estimate a storage life of propelling charge on the decrease of muzzle velocity by stochastic gamma process model. It is required to establish criterion for state failure to estimate the storage life and it is defined in this paper as a muzzle velocity difference between reference value and maximum allowable standard deviation multiplied by 6. The relationship between storage time and muzzle velocity is investigated by nonlinear regression analysis. The stochastic gamma process model is used to estimated the state distribution and the life distribution for storage time for 155mm propelling charge KM4A2 because the regression analysis is a deterministic method and it can't describe the distribution of life for storage time.

Development of accelerated life test method for mechanical components using Weibull-IPL(Inverse Power Law) model (와이블-역승법을 이용한 기계류부품의 가속시험 방법 개발)

  • Lee, Geun-Ho;Kim, Hyoung-Eui;Kang, Bo-Sik
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.445-450
    • /
    • 2003
  • This study was performed 10 develop the accelerated life test method using Weibull-IPL(Inverse Power Law) model for mechanical components. Weibull-IPL model is concerned with determining the assurance life with confidence level and the accelerated life test time From the relation of weibull distribution factors and confidence limit, the testing times on the no number of failure acceptance criteria arc determined. The mechanical components generally represent wear and fatigue characteristics as a failure mode. IPL based on the cumulative damage theory is applied effectively the mechanical components to reduce the testing time and to achieve the accelerating test conditions. As the actual application example, accelerated life test method of agricultural tractor transmission was described. Life distribution of agricultural tractor transmission was supposed to follow Weibull distribution and life test time was calculated under the conditions of average life (MTBF) 3,000 hours and 90% confidence level for one test sample. According to IPL, because test time call be shorten in case increase test load test time could be reduced by 482 hours when we put the load 1.1 times of rated load than 0.73 times of rated load that is equivalent load calculated by load spectrum of the agricultural tractor. This time, acceleration coefficient was 11.7.

  • PDF

Impacts of Rainfall Events and Distribution on Unsaturated Soil Slope Analysis (불포화 토사사면 해석에 대한 강우사상과 분포의 영향)

  • Kim, Jae-Hong;Kim, Ho-Kyum;Kim, Byeongsu;Park, Seong-Wan
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.1
    • /
    • pp.35-43
    • /
    • 2016
  • The time distribution of rainfall is one of the most important considerations for evaluating soil slope stability. In order to study the rainfall-induced slope failure, the rainfall pattern has generally been assumed as uniform rainfall intensity for rainfall duration. However, it should be noted that the time distribution of the design rainfall method has a significant effect on the soil slope instability. The study implemented Mononobe, Huff, and uniform method as three types of time distribution method of the design rainfall to estimate the factor of safety of soil slopes by rainfall duration. As a result, the difference of soil suction and unsaturated hydraulic properties in a soil by rainfall pattern was found through the application of an appropriate time distribution method to numerical simulation for rainfall-induced slope stability.

Deciding the Maintenance Priority of Power Distribution System using Time-varying Failure Rate (시변 고장률을 이용한 배전계통 유지보수 우선순위 결정)

  • Lee, Hee-Tae;Moon, Jong-Fil;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.11
    • /
    • pp.476-484
    • /
    • 2006
  • The failure prediction and preventive maintenance for the equipment of nuclear power plant area using reliability-centered maintenance have been grown. On the other hand, the maintenance for power distribution system consists of time-based maintenance mainly. In this paper, the new maintenance algorithms for power distribution system are developed considering reliability indices. First of all, Time-varying failure rates are extracted from data accumulated at KEPCO using exponential distribution function and weibull distribution function. Next, based on the extracted failure rate, reliability for real power distribution system is evaluated for applying the effective maintenance algorithm which is the analytic method deciding the maintenance point of time and searching the feeder affecting the specific customer. Also the algorithm deciding the maintenance priority order are presented based on sensitivity analysis and equipment investment plan are analyzed through the presented algorithm at real power distribution system.

Time Distribution Characteristics of an Annual Maximum Rainfall According to Rainfall Durations using Huff's Method (Huff의 4분위법을 이용한 지속기간별 연 최대치 강우의 시간분포 특성연구)

  • Lee, Jong-Kyu;Chu, Hyun-Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5B
    • /
    • pp.519-528
    • /
    • 2006
  • In the construction of hydraulic structures deciding a design flood is one of the most important works. It should be especially noted that the time distribution of the design rainfall method makes a significant effect on the results of the design flood. Thus, choosing an appropriate time distribution method for the design rainfall is a very important process. In recent years, Huff's method is usually used in Korea. This method presents dimensionless rainfall-time cumulative curves, which are made through the analyses of storm data. In this study, the annual maximum rainfall data, from 1961 to 2004 were analyzed to make the dimensionless rainfall-time cumulative curves and hyetographs in Seoul. The results were compared with the "Regional Time Distribution of the Design Rainfall", (KICT, 1989 and MCT, 2000). As a result, the dimensionless rainfall-time cumulative curves are smoother than Huff's results when the duration of an annual maximum rainfall is short. In addition, the curves are similar with the Huff's results as the duration is longer.

Application of joint time-frequency distribution for estimation of time-varying modal damping ratio

  • Bucher, H.;Magluta, C.;Mansur, W.J.
    • Structural Engineering and Mechanics
    • /
    • v.37 no.2
    • /
    • pp.131-147
    • /
    • 2011
  • The logarithmic decrement method has been long used to estimate damping ratios in systems with only one modal component such as linear single degree of freedom (SDOF) mechanical systems. This paper presents an application of a methodology that uses joint time-frequency distribution (JTFD) as input, instead of the raw signal, to systems with several vibration modes. A most important feature of the present approach is that it can be applied to a system with time-varying damping ratio. Initially the precision and robustness of the method is determined using a synthetic model with multiple harmonic components, one of them displaying a time-varying damping ratio, subsequently the results obtained from experiments with a reduced model are presented. A comparison is made between the results obtained with this methodology and those using the classical technique of Least Squares Complex Exponential Method (LSCE) in order to highlight the advantages of the former, such as, good precision, robustness and excellent performance in extreme cases, e.g., when very low frequency components and time varying damping ratio are present.

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

A Practical Method for Designing Vehicle Routing with Time Windows in Warehouse (정시배송체계의 실용적 설계를 위한 방법론)

  • Byeon, Eui-Seok
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.455-461
    • /
    • 2000
  • Logistics systems can be evaluated by how productively distribution center operates, how promptly transportation vehicle dispatches, how efficiently facility layout is, and so on. In this paper, a practical vehicle routing scheme with fixed delivery time and fixed vehicle routes is introduced. The method helps the distribution center reduce logistics cost with respect to dispatching vehicles, and satisfy the customer with pre-determined delivery time window constraints. A case study has shown that the proposed scheme not only generates a feasible schedule with time windows, but also balances material flow in warehouse.

  • PDF

Proposal of a Time-dependent Method for Determining the Forming Limit of Sheet Metal (판재의 성형한계 결정을 위한 시간의존적 방법의 제안)

  • Kim, S.G.;Kim, H.J.
    • Transactions of Materials Processing
    • /
    • v.27 no.2
    • /
    • pp.115-122
    • /
    • 2018
  • Most domestic and international standards on the forming limit diagram (FLD) including ISO 12004-2, use a 'position-dependent method,' which determines the forming limit from a strain distribution measured on the specimen after necking or fracture. However, the position-dependent method has inherent problems such as the incidence of asymmetry of a strain distribution, the estimation of missing data near fracture, the termination time of test, and the deformation due to the new stress equilibrium after a fracture, which is blamed for causing sometimes a significant lab-to-lab variation. The 'time-dependent method,' which is anticipated to be a new international standard for evaluating the forming limit, is expected to greatly improve these intrinsic disadvantages of the position-dependent method. It is because the time-dependent method makes it possible to identify and accurately determine the forming limit, just before the necking point from the strain data as continuously measured in a short time interval. In this study, we propose a new time-dependent method based on a Gaussian fitting of strain acceleration with the introduction of 'normalized correlation coefficient.' It has been shown in this study that this method can determine the forming limit very stably and gives a higher value, which is in comparison with the results of the previously studied position-dependent and time-dependent methods.

Wind Data Simulation Using Digital Generation of Non-Gaussian Turbulence Multiple Time Series with Specified Sample Cross Correlations (임의의 표본상호상관함수와 비정규확률분포를 갖는 다중 난류시계열의 디지털 합성방법을 이용한 풍속데이터 시뮬레이션)

  • Seong, Seung-Hak;Kim, Wook;Kim, Kyung-Chun;Boo, Jung-Sook
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.19 no.5
    • /
    • pp.569-581
    • /
    • 2003
  • A method of synthetic time series generation was developed and applied to the simulation of homogeneous turbulence in a periodic 3 - D box and the hourly wind data simulation. The method can simulate almost exact sample auto and cross correlations of multiple time series and control non-Gaussian distribution. Using the turbulence simulation, influence of correlations, non-Gaussian distribution, and one-direction anisotropy on homogeneous structure were studied by investigating the spatial distribution of turbulence kinetic energy and enstrophy. An hourly wind data of Typhoon Robin was used to illustrate a capability of the method to simulate sample cross correlations of multiple time series. The simulated typhoon data shows a similar shape of fluctuations and almost exactly the same sample auto and cross correlations of the Robin.