• Title/Summary/Keyword: Time Resource

Search Result 3,300, Processing Time 0.027 seconds

An Analysis on Husbands and Wives' Time Distribution and Space Occupancy in the Division of Labor (부부의 노동분담에 대한 시간대별 활동 및 공간활용도 분석)

  • Yoon So-Young
    • Journal of Family Resource Management and Policy Review
    • /
    • v.9 no.4
    • /
    • pp.21-40
    • /
    • 2005
  • The purpose of this study was to exam the activities by the distribution of time and space occupancy on their weekday and weekend. to study the space and labor segregation by sex. The sample population included 23 wives and their husbands(30-40 years old). The major findings of the research are as follows: First, it shows that wives' time use by activity was consistent with the space occupancy on weekday. Second, on weekend, wives was used to stay in living room most of time. Thirdly, husbands show the stereotype of time use on weekday, and substitute leisure time for labor time. Finally, on weekend, the wives and husbands have the joint time in the household labor or leisure activities.

  • PDF

Gender Differences of Leisure Time based on Simultaneous Activities (여가시간의 동시적 활동 분석을 통한 성차 연구)

  • Yoon, So-Young;Kim, Hyun
    • Journal of Family Resource Management and Policy Review
    • /
    • v.11 no.2
    • /
    • pp.85-93
    • /
    • 2007
  • The purpose of this study was to assess gender differences in the quantity and quality of leisure time. It uses time diary for a nationally representative sample of Koreans(10 years old over) collected in 2004 by KNSO. This time use surveys provide information about a primary activity and a secondary activity (that is simultaneous activity accompanying the primary activity). The results was that married women experience less of leisure time and more contaminated leisure time by a secondary activity(especially household labor) than married men. This research presents that men and women have different quantity and quality of leisure time, and gender discrepancies persist in the experience of leisure time.

  • PDF

Efficient Genetic Algorithm for Resource Constrained Project Scheduling Problem (자원 제약이 있는 프로젝트 스케줄링을 위한 효율적인 유전알고리즘)

  • Lee, Sang-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.6
    • /
    • pp.59-66
    • /
    • 2011
  • Resource constrained project scheduling problem with multiple resource constraints as well as precedence constraints is well-known as one of the NP-hard problem. Since these problems can't be solved by the deterministic method during reasonable time, the heuristics are generally used for getting a sub-optimal during reasonable time. In this paper, we introduce an efficient genetic algorithm for resource constrained project scheduling problem using crossover which is applying schema theory and real world tournament selection strategy. Experimental results showed that the proposed algorithm is superior to conventional algorithm.

The Effects of the Electronic Health Record System on Work Overload and Stress Moderation of Hospital Employees

  • Choi, Young-Jin;Noh, Jin-Won;Boo, Yoo-Kyung
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.9
    • /
    • pp.35-44
    • /
    • 2018
  • Purpose - In endless competition, companies pursue cost reduction and work efficiency. So, entrepreneurs try to increase job intensity, which may lead to job stress and high turnovers because of job burnout. But, Information systems are acknowledged as a work support tool that secures work convenience and the productivity of employees. In this study, we aimed to confirm the effects of information systems in reduing the work overload of employees in a human resource intensive industry. Research design, data and methodology - This is based on the job demands-resources model, conducting an empirical analysis of surveys given to hospital employees working in a human resource intensive industry. Results - The research revealed that information systems reduced the work overload of employees in a human resource intensive industry. Conclusion - This study confirmed the effects of information systems as a job resource based on JD-R theory, and presentation of empirical results indicated that information systems alleviate employee job overload and increases job satisfaction in the medical services industry. In the medical services industry, using electronic health record system decreases in work overload, which results in employees gaining time for self-development and time management, reducing job stress, and leading to job satisfaction.

CPS: Operating System Architecture for Efficient Network Resource Management with Control-Theoretic Packet Scheduler

  • Jung, Hyung-Soo;Han, Hyuck;Yeom, Heon-Young;Kang, Soo-Yong
    • Journal of Communications and Networks
    • /
    • v.12 no.3
    • /
    • pp.266-274
    • /
    • 2010
  • The efficient network resource management is one of the important topics in a real-time system. In this paper, we present a practical network resource management framework, control-theoretic packet scheduler (CPS) system. Using our framework, an operating system can schedule both input and output streams accurately and efficiently. Our framework adopts very portable feedback control theory for efficiency and accuracy. The CPS system is able to operate independent of the internal network protocol state, and it is designed to schedule packet streams in fine-grained time intervals to meet the resource requirement. This approach simplifies the design of the CPS system, and leads us to obtain the intended output bandwidth. We implemented our prototype system in Linux, and measured the performance of the network resource management system under various network QoS constraints. The distinctive features of our principles are as follows: It is robust and accurate, and its operation is independent of internal network protocols.

The Development of Offshore Wind Resource Measurement System and Remote Monitoring System (해상기상관측 시스템 및 실시간 원격 모니터링시스템 개발)

  • Ko, Suk-Whan;Jang, Moon-Seok;Lee, Youn-Seop
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.6
    • /
    • pp.72-77
    • /
    • 2011
  • The purpose for installation of offshore weather station is a measurement of wind resources and so on. If weather station is operated, it will be possible to analysis for wind resource and arrangement of wind farm by using measured data. In this paper, we carried out the development of offshore wind resource measurement system for measuring offshore wind resource. Also, In order to monitor for real-time wind data with 1 Hz, we installed the wireless transmission system. All wind characteristic data are sent to the server PC through the this system is connected outport of DataLogger. Transmitted wind data were used in order to look at in the Web-page and tablet PC on a real time basis in a graph. In this paper, we will introduce about the wind resource measurement and remote monitoring system that is the result of study.

Trade-off between Resource Efficiency and Fast Protection for Shared Mesh Protection

  • Cho, Choong-hee
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.7
    • /
    • pp.2568-2588
    • /
    • 2021
  • Shared mesh protection (SMP) protects traffic against failures occurring in a working path, as with linear protection, and allows resource sharing of protection paths with different endpoints. The SMP mechanism coordinates multiple protection paths that require shared resources when failures occur on multiple working paths. When multiple failures occur in SMP networks sharing limited resources, activation can fail because some of the resources in the protection path are already in use. In this case, a node confirming that a resource is not available has the option to wait until the resource is available or to withdraw activation of the protection path. In this study, we recognize that the protection switching time and the number of protected services can be different, depending on which option is used for SMP networks. Moreover, we propose a detailed design for the implementation of SMP by considering options and algorithms that are commonly needed for network nodes. A simulation shows the performance of an SMP system implemented with the proposed design and utilizing two options. The results demonstrate that resource utilization can be increased or protection switching time can be shortened depending on the option selected by the network administrator.

Design and Implementation of a Grid System META for Executing CFD Analysis Programs on Distributed Environment (분산 환경에서 CFD 분석 프로그램 수행을 위한 그리드 시스템 META 설계 및 구현)

  • Kang, Kyung-Woo;Woo, Gyun
    • The KIPS Transactions:PartA
    • /
    • v.13A no.6 s.103
    • /
    • pp.533-540
    • /
    • 2006
  • This paper describes the design and implementation of a grid system META (Metacomputing Environment using Test-run of Application) which facilitates the execution of a CFD (Computational Fluid Dynamics) analysis program on distributed environment. The grid system META allows the CFD program developers can access the computing resources distributed over the network just like one computer system. The research issues involved in the grid computing include fault-tolerance, computing resource selection, and user-interface design. In this paper, we exploits an automatic resource selection scheme for executing the parallel SPMD (Single Program Multiple Data) application written in MPI (Message Passing Interface). The proposed resource selection scheme is informed from the network latency time and the elapsed time of the kernel loop attained from test-run. The network latency time highly influences the executional performance when a parallel program is distributed and executed over several systems. The elapsed time of the kernel loop can be used as an estimator of the whole execution time of the CFD Program due to a common characteristic of CFD programs. The kernel loop consumes over 90% of the whole execution time of a CFD program.

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

Strategic Allocation of the Limited Same Resource by Program Management Office Considering Financial Values (재무 가치를 고려한 PMO의 전략적 동일 한정 자원 배분)

  • Hwang, Jin-Ha;Kim, Ju-Han;Hwang, Jee-Yeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2012
  • Priority rules or sequencing heuristics conventionally used to determine resource allocation is to maximize the earned value on time and cost. This study provides a effective strategy-oriented approach for the program resource management problem with limited same resource, which systematically connects individual project objectives to the overall organizational goal, by introducing financial values as well as priority rules in a broader context. It deals with the resource allocation problem as the decision making problem in the strategic management paradigm to meet business objective and solves it using the analytic hierarchy process, and explains the method of application and usefulness through some simulation cases.