• 제목/요약/키워드: Tilt-Up 공법

검색결과 2건 처리시간 0.015초

단독주택의 구조체 공사에 있어 Tilt-up 공법의 현장적용 (Application of Tilt-Up Construction Method for Building Single-Family house)

  • 전세미;김명길;안연수;소광호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.136-137
    • /
    • 2015
  • Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.

  • PDF