• Title/Summary/Keyword: Tie line limits

Search Result 8, Processing Time 0.027 seconds

Multi Area Economic Dispatch using Secant Method

  • Sudhakar, A.V.V.;Chandram, Karri;Jayalaxmi, A.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.744-751
    • /
    • 2013
  • In this paper, Secant method is proposed to solve multi area economic dispatch (MAED) problem. Generator limits of all generators in each area are calculated at given area power demands plus export (or import) using secant method and the generator limits of all generators are modified as modified generator limits. Central economic dispatch (CED) problem is used to determine the output powers of all generators. Here, Secant method is applied to solve the CED problem. The proposed approach has been tested on two-area (two generators in each area) system and four-area (four generators in each area) system. It is observed from various cases that the proposed approach provides optimally best solution in terms of cost with tie line loss with less computational burden.

Operational Cost Minimization Considering Line Flow Limits of MIcroGrid Connection (마이크로 그리드간 선로제약을 고려한 운영비용 최소화)

  • Rhee, Sang-Bong;Kim, Kyu-Ho;Kim, Soo-Nam;Lee, Sang-Keun;Kim, Chul-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.151_152
    • /
    • 2009
  • The capacity constraints of tie-lines in production cost analysis are very important issues in the operation and planning of MicroGrid power systems. This paper presents the Harmony Search(HS) algorithm to solve the Economic Dispatch (ED) problem with tie-line capacity limits in MicroGrid system. The applied HS algorithm has achieved efficient and accurate solutions for three-area MicroGrid systems with renewable power units.

  • PDF

A Study on the Specification-Oriented Control Chart (제품규격중심(製品規格中心)의 관리도(管理圖)에 관한 고찰(考察))

  • Kim, Gwang-Seop
    • Journal of Korean Society for Quality Management
    • /
    • v.7 no.2
    • /
    • pp.3-6
    • /
    • 1979
  • The Specification-Oriented Control Chart is obtained by moving from the tolerance limits toward the center line. And when chart are based on center lines, no automatic tie-in with tolerance is provided. The author recomend the Specification-Oriented Control Chart in instances where tolerance limits on the individual unit or product must be met.

  • PDF

EP Based PSO Method for Solving Multi Area Unit Commitment Problem with Import and Export Constraints

  • Venkatesan, K.;Selvakumar, G.;Rajan, C. Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.415-422
    • /
    • 2014
  • This paper presents a new approach to solve the multi area unit commitment problem (MAUCP) using an evolutionary programming based particle swarm optimization (EPPSO) method. The objective of this paper is to determine the optimal or near optimal commitment schedule for generating units located in multiple areas that are interconnected via tie lines. The evolutionary programming based particle swarm optimization method is used to solve multi area unit commitment problem, allocated generation for each area and find the operating cost of generation for each hour. Joint operation of generation resources can result in significant operational cost savings. Power transfer between the areas through the tie lines depends upon the operating cost of generation at each hour and tie line transfer limits. Case study of four areas with different load pattern each containing 7 units (NTPS) and 26 units connected via tie lines have been taken for analysis. Numerical results showed comparing the operating cost using evolutionary programming-based particle swarm optimization method with conventional dynamic programming (DP), evolutionary programming (EP), and particle swarm optimization (PSO) method. Experimental results show that the application of this evolutionary programming based particle swarm optimization method has the potential to solve multi area unit commitment problem with lesser computation time.

Windows Based Programming for Optimal Power Flow Analysis (윈도우환경을 기반으로 한 최적전력조류 프로그램 팩키지 개발)

  • Kim, Kyu-Ho;Rhee, Sang-Bong;Lee, Jae-Gyu;You, Seok-Ku
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.239-242
    • /
    • 2001
  • This paper presents a windows program package for solving security constrained OPF in interconnected power systems, which is based on the combined application of evolutionary programming(EP) and sequential quadratic programming(SQP). The objective functions are the minimization of generation fuel costs and system power losses. The control variables are the active power of the generating units, the voltage magnitude of the generator, transformer tap settings and SVC setting. The state variables are the bus voltage magnitude, the reactive power of the generating unit, line flows and the tie line flow. In OPF considering security, the outages are selected by contingency ranking method. The resulting optimal operating point has to be feasible after outages such as any single line outage(respect of voltage magnitude, reactive power generation and power flow limits). The OPF package proposed is applied to 10 machines 39 buses model system.

  • PDF

A Study on the Load Frequency Control of Power System Using an Optimal Modulation Controller (최적 변조제어기를 이용한 전력시스템의 부하주파수 제어에 관한 연구)

  • 정형환;허동렬;정문규;주석민;이준탁
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.26 no.3
    • /
    • pp.299-306
    • /
    • 2002
  • The load frequency control(LFC) of power system is one of important subjects in view of system operation and control. That is, even though the rapid load disturbances are applied to the given power system, the stable and reliable power should be supplied to the users, converging unconditionally and rapidly the frequency deviations and the tie-line power flow ones of each area into allowable boundary limits. Nonetheless of such needs, if the internal parameter perturbation and the sudden load variation are given, the unstable phenomena of power systems can be often brought out because of the large frequency deviation and the unsuppressible power line one. So, an optimal modulation controller for UC of multi-area power system is designed by a recursive algorithm that determines the state weighting matrix Q of a linear quadratic performance criterion. The optimal modulation controller is based on optimal control and can obtain the exact dynamic response of the UC of multi-area power system in the time domain. The performances of the resultant optimal modulation control, that is, the steady-state deviations of frequency and tie-line power flow and the related dynamics, were investigated and analyzed in detail by being applied to the UC of multi-area power system in the perturbations of predetermined internal parameters. Through the simulation results tried variously in this paper for disturbance of stepwise load changes, the superiorities of the proposed optimal modulation controller in robustness and stability were proved.

Load Frequency Control of Multi-area Power System using Auto-tuning Neuro-Fuzzy Controller (자기조정 뉴로-퍼지제어기를 이용한 다지역 전력시스템의 부하주파수 제어)

  • Jeong, Hyeong-Hwan;Kim, Sang-Hyo;Ju, Seok-Min;Heo, Dong-Ryeol;Lee, Gwon-Sun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.3
    • /
    • pp.95-106
    • /
    • 2000
  • The load frequency control of power system is one of important subjects in view of system operation and control. That is even though the rapid load disturbances were applied to the given power system, the stable and reliable power should be supplied to the users, converging unconditionally and rapidly the frequency deviations and the tie-line power flow one on each area into allowable boundary limits. Nonetheless of such needs, if the internal parameter perturbation and the sudden load variation were given, the unstable phenomenal of power system can be often brought out because of the large frequency deviation and the unsuppressible power line one. Therefore, it is desirable to design the robust neuro-fuzzy controller which can stabilize effectively the given power system as soon as possible. In this paper the robust neuro-fuzzy controller was proposed and applied to control of load frequency over multi-area power system. The architecture and algorithm of a designed NFC(Neuro-Fuzzy Controller) were consist of fuzzy controller and neural network for auto tuning of fuzzy controller. The adaptively learned antecedent and consequent parameters of membership functions in fuzzy controller were acquired from the steepest gradient method for error-back propagation algorithm. The performances of the resultant NFC, that is, the steady-state deviations of frequency and tie-line power flow and the related dynamics, were investigated and analyzed in detail by being applied to the load frequency control of multi-area power system, when the perturbations of predetermined internal parameters. Through the simulation results tried variously in this paper for disturbances of internal parameters and external stepwise load stepwise load changes, the superiorities of the proposed NFC in robustness and adaptive rapidity to the conventional controllers were proved.

  • PDF

Windows Program Package Development for Optimal Pourer Flour Analysis (최적전력조류 해석을 위한 원도우프로그램 팩키지 개발)

  • Kim, Gyu-Ho;Lee, Sang-Bong;Lee, Jae-Gyu;Yu, Seok-Gu
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.12
    • /
    • pp.584-590
    • /
    • 2001
  • This paper presents a windows program package for solving security constrained OPF in interconnected Power systems, which is based on the combined application of evolutionary programming(EP) and sequential quadratic programming(SQP). The objective functions are the minimization of generation fuel costs and system power losses. The control variables are the active power of the generating units, the voltage magnitude of the generator, transformer tap settings and SYC setting. The state variables are the bus voltage magnitude, the reactive power of the generating unit, line flows and the tie line flow In OPF considering security, the outages are selected by contingency ranking method. The resulting optimal operating point has to be feasible after outages such as any single line outage(respect of voltage magnitude, reactive power generation and power flow limits). The OPF package proposed is applied to IEEE 14 buses and 10 machines 39 buses model system.

  • PDF