• Title/Summary/Keyword: Tidal Power System

Search Result 136, Processing Time 0.02 seconds

Study on Extractable power capacity of Tidal current power farm in the Feasibility investigation (해양 조류발전단지 타당성 조사시 발전용량 산출방법에 관한 연구)

  • Jo, Chulhee;Kim, Doyoub;Chae, Kwangsu;Yim, Jinyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.169.1-169.1
    • /
    • 2010
  • Due to global warming, the need to secure an alternative resource has become the international issue. Not like other renewable energy sources, TCP is the high reliable and predictable and continuous energy source as the current pattern and speed can be predicted throughout the year. Having very strong tidal current speeds, there are many suitable site for the application of TCP (Tidal Current Power) on the west and south coastal region in Korea. The maximum current speed in the south is recorded up to 6.5m/s. Due to the high tidal current speed on the west coast of Korea, numerous tidal current projects are being planned. To extract a significant quantity of power, a tidal current farm with number of devices is required in the ocean. However, it is important to estimate the potential quantity of energy in the area. Also the realistic quantity that can be extracted is to be investigated. Based on the estimated energy production considering the number of devices and the interactional effects, system type, the water depth and etc., the cost of the development and the benefit from SMP can be estimated. The feasibility study for the 200MW tidal in Incheon, Korea has been performed recently. Based on the actual feasibility study, the procedure and the key points for the application of tidal current power farm are introduced in the paper.

  • PDF

Design and Performance Test of Savonius Tidal Current Turbine with CWC (사보니우스형 조류발전 터빈의 설계 및 회류수조 실험을 통한 성능평가)

  • Jo, Chul-Hee;Lee, Jun-Ho;Rho, Yu-Ho;Ko, Kwang-Oh;Lee, Kang-Hee
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.4
    • /
    • pp.37-41
    • /
    • 2012
  • Due to global warming, the need to secure alternative resources has become more important nationally. Because of the very strong current on the west coast, with a tidal range of up to 10 m, there are many suitable sites for the application of TCP (tidal current power) in Korea. In the southwest region, a strong current is created in the narrow channels between the numerous islands. A rotor is an essential component that can convert tidal current energy into rotational energy to generate electricity. The design optimization of a rotor is very important to maximize the power production. The performance of a rotor can be determined using various parameters, including the number of blades, shape, sectional size, diameter, etc. There are many offshore jetties and piers with high current velocities. Thus, a VAT (vertical axis turbine) system, which can generate power regardless of flow direction changes, could be effectively applied to cylindrical structures. A VAT system could give an advantage to a caisson-type breakwater because it allows water to circulate well. This paper introduces a multi-layer vertical axis tidal current power system. A Savonius turbine was designed, and a performance analysis was carried out using CFD. A physical model was also demonstrated in CWC, and the results are compared with CFD.

Design Load Analysis of Current Power Rotor and Tower Interaction

  • Jo, Chul H.;Lee, Kang-Hee;Hwang, Su-Jin;Lee, Jun-Ho
    • International Journal of Ocean System Engineering
    • /
    • v.3 no.4
    • /
    • pp.164-168
    • /
    • 2013
  • Tidal-current power is now recognized as a clean power resource. The turbine blade is the fundamental component of a tidal current power turbine. The kinetic energy available within a tidal current can be converted into rotational power by turbine blades. While in service, turbine blades are generally subjected to cyclic fatigue loading due to their rotation and the rotor-tower interaction. Predicting the fatigue life under a hydrodynamic fatigue load is very important to prevent blade failure while in service. To predict the fatigue life, hydrodynamic load data should be acquired. In this study, the vibration characteristics were analyzed based on three-dimensional unsteady simulations to obtain the cyclic fatigue load. Our results can be applied to the fatigue design of horizontal-axis tidal turbines.

Design and Performance Evaluation of the Savonius Tidal Current Turbine (항력식 조류발전 터빈의 최적 형상 설계 및 유동 수치해석을 통한 성능 평가)

  • Jo, Chul-Hee;Ko, Kwang-Oh;Lee, Jun-Ho;Lee, Kang-Hee
    • New & Renewable Energy
    • /
    • v.8 no.2
    • /
    • pp.6-13
    • /
    • 2012
  • Due to global warming, the need to secure an alternative resource has become more important nationally. Having very strong current on the west coast with up to 10 m tidal range, there are many suitable site for the application of TCP (Tidal Current Power) in Korea. On the south west regions between many islands that create strong current in the narrow channels. The rotor is one of the essential components which can convert tidal current energy into rotational energy to generate electricity. The design optimization of rotor is very important to maximize the power production. The performance of rotor can be determined by various parameters including number of blades, shape, sectional size, diameters and etc. This paper introduces the multi-layer vertical axis tidal current power system which can be applied to offshore jetties and piers effectively. Various cases of VAT turbine were designed. Specifically, the number of blades and turbine shape are changed in several cases. Also, performance analysis was carried out by CFD.

A Introduction Class on the Tidal Power Generation for Elementary School Students by University Students

  • Hwang, Kwang-Il
    • Journal of Engineering Education Research
    • /
    • v.13 no.5
    • /
    • pp.3-7
    • /
    • 2010
  • As 10th energy consumption country in the world, it is very important to educate the importance of the energy to the elementary school students. The purpose of this class is to let the pupils understand the mechanisms and performances of tidal power generation as a renewable energy application system. To satisfy the educational goals, a lecture material and a simple type of tidal power generator kit is developed. As the survey result after lecture and experiments which include assembly and test, 'Well understood' is marked as 90% among 58 elementary students, and moreover 70% among them feel to participate in higher level course. This project shows the possibility and effect of the renewable energy education course as a service engineering, which is managed and carried out by undergraduates for pupils under the professor's guide.

  • PDF

Design of Ocean Fishways as Eco-movement Passages (생태이동통로로서의 해양어도의 설계)

  • Jang, Kyung-Soo;Lee, Jung-Eun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.624-627
    • /
    • 2009
  • Design of ocean fishways as eco-movement passages for turbine structures, sluice structures and barrages of a environmentally-friendly tidal power system through which fish can pass are suggested. The ocean fishways comprise a plurality of fishways to allow fish to move between the sea-side and the lake-side of the barrages and turbine structures and sluice structures. It is demonstrated that the inventive ocean fishways are cost effective to construct and environmentally-friendly eco-movement passages for fish and benthos to move between sea-side and lake-side without passing through the turbine blades of a tidal power plant in operation.

  • PDF

Annual Energy Production Maximization for Tidal Power Plants with Evolutionary Algorithms

  • Kontoleontos, Evgenia;Weissenberger, Simon
    • International Journal of Fluid Machinery and Systems
    • /
    • v.10 no.3
    • /
    • pp.264-273
    • /
    • 2017
  • In order to be able to predict the maximum Annual Energy Production (AEP) for tidal power plants, an AEP optimization tool based on Evolutionary Algorithms was developed by ANDRITZ HYDRO. This tool can simulate all operating modes of the units (bi-directional turbine, pump and sluicing mode) and provide the optimal plant operation that maximizes the AEP to the control system. For the Swansea Bay Tidal Power Plant, the AEP optimization evaluated all different hydraulic and operating concepts and defined the optimal concept that led to a significant AEP increase. A comparison between the optimal plant operation provided by the AEP optimization and the full load operating strategy is presented in the paper, highlighting the advantage of the method in providing the maximum AEP.

A Study on Energy Extraction from Tidal Currents

  • Hoang, Anh Dung;Yang, Chang-Jo
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2011.06a
    • /
    • pp.79-79
    • /
    • 2011
  • The oceans are an untapped resource, capable of making a major contribution to our future energy needs. In the search for a non polluting renewable energy source, there is a push to find an economical way to harness energy from the ocean. Tidal stream is one of ocean energy form that is being investigated as potential source for power generation. Tidal current turbines are therefore designed as conversion machinery to generate power from tidal currents. A study on energy extraction from tidal currents is presented in this paper.

  • PDF

The Development of Tidal Power System Can be Installed in Existing Dykes - The Open Channel Experimental Verification (기존 방조제에 설치 가능한 조력발전 장치 개발 - 개수로 현장실험 검증)

  • HyukJin Choi;Dong-Hui Ko;Nam-Sun Oh;Shin Taek Jeong
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.35 no.1
    • /
    • pp.13-21
    • /
    • 2023
  • As problems such as difficulties in securing stable energy resources and global warming due to the emission of greenhouse gases due to the use of fossil fuels have emerged, interest in the development of renewable energy is increasing. Since the tidal phenomenon has a regularity that occurs regularly with a certain period, it is possible to predict accurately in advance, which has a advantage in terms of energy recovery. Therefore, various methods have been devised to utilize the tide as an energy source. Tidal power using barrages is a representative method that is widely operated, but the promotion of tidal power generation projects is being delayed or stopped due to the decrease in the level of water in the tidal basin, changes in water quality and in the ecosystem. In this study, a field experiment was conducted to develop and verify the performance of a tidal power device applicable to sea areas where dykes are already installed. As a result of carrying out four cases of experiments using two water tanks, pipe lines, open channels, weirs, and water turbine and generator, the possibility of developing a power generation system capable of 10 kW output or more and 60% efficiency or more was confirmed. These research results can be used for small-scale tidal power by utilizing the existing dykes.

Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel (장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계)

  • Kim, Won-Seok
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.3
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.