• Title/Summary/Keyword: Thermal Equipment

Search Result 774, Processing Time 0.026 seconds

Estimation of the Optimum Number of Machines and Equipments for Professional Dairy Farm (낙농 전업농의 기계장치 최적 규모 추정)

  • 유병기;이용범;장진택;이동현;권두중;기광석;성시흥;이대원
    • Journal of Animal Environmental Science
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 1996
  • A survey was conducted for dairy farmer to estimate the optimum number of machine and equipment in 1994. Labor hours, operation costs and operation methods for each dairy processing were investigated and analyzed for the farmers to find the expected numbers of machine and equipment on the basis of the desired farm scale. And also, the estimated models were compared and analyzed with the conventional models which more than half dairy farmers used bucket milker in tie stall barn. Some of the results are as follows : 1. Analysis results of conventional model showed that a dairy farm could raise to 15 heads of dairy cow with family labor of 1.5 men, labor hours of 2, 700 in you and total operation costs of 734 thousand won per head. 2. The result, used in conjunction with minimum operation costs in tie stall barn, showed that 28 dairy cows could be raised by using concentrates feeding by hoppers, water supply by water cups, milking by pipeline milker, and manure cleaning by barn cleaner with total operation costs of 520 thousands won per head. 3. The total operation costs of a loose barn system is higher than those of tie stall barn system to raise about 30 heads. For the loose barn system, the herringbone parlour was used for milking, concentrate feeding by automatic concentrate feeder, water supply by thermal insulation feeder, and manure cleaning by scraper with total operation costs of 582 thousands won per head every year.

  • PDF

Design of the Condenser and Automation of a Solar Powered Water Pump (태양열 물펌프의 운전 자동화 설계)

  • Kim Y. B.;Son J. G.;Lee S. K.;Kim S. T.;Lee Y. K.
    • Journal of Animal Environmental Science
    • /
    • v.10 no.3
    • /
    • pp.141-154
    • /
    • 2004
  • The solar powered water pump is very ideal equipment because solar power is more intensive when the water is more needed in summer and it is very helpful in the rural area, in which the electrical power is not available. The average so]ar radiation energy is 3.488 kWh/($m^2{\cdot}day$) in Korea. In this study, the automatic control logic and system of the water pump driven by the radiation energy were studied, designed, assembled, tested and analyzed for realizing the solar powered water pump. The experimental system was operated automatically and the cycle was continued. The average quantity of the water pumped per cycle was about 5,320 cc. The cycle time was about 4.9 minutes. The thermal efficiency of the system was about $0.030\%$. The pressure level of the n-pentane vapour in flash tank was 150$\%$450 hPa(gauge) which was set by the computer program for the control of the vapour supply. The pressure in the condenser and air tank during cycles was maintained as about 600 hPa and 1,200 hPa respectively. The water could be pumped by the amount of 128kg/($m^2{\cdot}day$) with the efficiency of $0.1\%$ and the pumping head of 10 m for the average solar energy in Korea.

  • PDF

Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete (응결시간조정에 의한 매트기초 매스 콘크리트의 온도균열저감 공법적용의 Mock-up Test)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.55-61
    • /
    • 2009
  • Recently, the number of high-rise buildings being built in Korea by major construction companies for residential and commercial use has been increasing. When constructing a high-rise building, it is necessary to apply massive amounts of concrete to form a mat foundation that can withstand the huge load of the upper structure. However, it is of increasing concern that due to limitations in terms of the amount of placing equipment, available job-sites and systems for mass concrete placement in the construction field, it is not always possible to place a great quantity of concrete simultaneously in a large-scale mat foundation, and for this reason consistency between placement lift cannot be secured. In addition, a mat foundation Is likely to crack due to the stress caused by differences inhydration heat generation time. To derive a solution for these problems, this study provides test results of a hydration heat crack reduction method by applying placement lift change and setting time control with a super retarding agent for mass concrete in a large-scale mat foundation. Mock-up specimens with different mixtures and placement liftswere prepared at the job-site of a newly-constructed high-rise building. The test results show that slump flow of concrete before and after adding the super retarding agent somewhat Increases as the target retarding time gets longer, while the air content shows no great difference. The setting time was observed to be retarded as the target retarding time gets longer. As the target retarding time gets longer, compressive strength appears to be decreased at an early stage, but as time goes by, compressive strength gets higher, and the compressive strength at 28 days becomes equal or higher to that of plain concrete without a super retarding agent. For the effect of placement lift change and super retarding agent on the reduction of hydration heat, the application of 2 and 4 placement lifts and a super retarding agent makes it possible to secure consistency and reduce temperature difference between placement lifts, while also extending the time to reach peak temperature. This implies that the possibility of thermal crack induced by hydration heat is reduced. The best results are shown in the case of applying 4 placement lifts.

A study on inspection methods for waste treatment facilities(II): Derivation of problems and improvement direction in inspection methods (폐기물처리시설의 세부검사방법 마련연구(II): 세부검사방법 문제점도출 및 개선방향 설정)

  • Pul-Eip Lee;Eunhye Kwon;Jun-Ik Son;Jun-Gu Kang;Taewan Jeon;Dong-Jin Lee
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.31 no.1
    • /
    • pp.85-100
    • /
    • 2023
  • In this study, in order to improve the installation periodical inspection method of waste treatment facilities, we conducted on-site surveys of waste treatment facilities classified into six fields, grasped the problems of inspection methods, and made improvements accordingly. And revised the inspection method for waste treatment facilities. As a result, in the field of incineration and incineration heat recovery, inspection methods such as total temperature measurement and one-year TMS data comparison using a thermal imaging camera were established. And for the safety of the inspected person, it was applied so that the waste can be replaced with a document without opening it. In the case of landfill facilities, the details regarding the use of video information processing equipment and the management of facilities covering the upper part of the landfill facility are presented in the law, but the items that do not have a inspection methods were applied to the inspection method. In the case of Food Waste Treatment Facility, inspection methods were put in place to ensure compliance with standards for foul-smelling fish in odor control, a major cause of complaints. As a result, 10 out of 18 improvement proposals were reflected in the incineration and sterilization grinding, cement kiln, and incineration heat recovery facilities, and 11 out of 12 improvement proposals were reflected in the landfill facility. In the case of food distribution waste treatment facilities, 10 out of 12 improvement proposals were reflected, and a total of 31 inspection methods were improved.