• Title/Summary/Keyword: The offshore Sinan

Search Result 3, Processing Time 0.018 seconds

The Source Parameters of Offshore Earthquakes with Magnitude Larger than 4.0 Nearby Sinan (신안 앞바다 인근 규모 4.0 이상 지진들의 지진원 상수)

  • Choi, Hoseon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.5
    • /
    • pp.213-219
    • /
    • 2014
  • The source parameters of four earthquakes with magnitude larger than 4.0 nearby the offshore Sinan are analyzed. The waveform inversion method is used for analyzing the source parameters of two events (20 August 2012 and 21 April 2013) with C&B and AK135-c crustal velocity structure models. The source parameters of the other two events (26 July 1994 and 23 March 2003) are obtained from references. Focal mechanisms of the events are strike slip faulting or strike slip faulting with a thrust component. The directions of P-axes of the events are ENE-WSW or NE-SW which are similar to previous studies on P-axes in and around the Korean peninsula. With regard to the events nearby the offshore Sinan, the regional stress, rather than being local stress, is seen to be the result of the combination of tectonic forces from the compression of plates colliding to the Eurasian Plate.

Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula (국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정)

  • Kim, Ji-Young;Kang, Keum-Seok;Oh, Ki-Yong;Lee, Jun-Shin;Ryu, Moo-Sung
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

Development and Utilization of Evaluation Methods for Offshore Wind Farm Landscape Quality Assessment (해상풍력발전단지 경관의 질 평가를 위한 평가기법의 개발 및 활용방안)

  • Jin-Oh Kim;Byoungwook Min;Kyung-Sook Woo;Jin-Pyo Kim
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.6
    • /
    • pp.577-589
    • /
    • 2023
  • In Korea, the technical techniques for assessing visual impacts are standardized, but the methods for assessing the marine landscape itself are not standardized and need to be improved. In particular, in the landscape impact assessment of offshore wind power generation in Korea, it is necessary to recognize the landscape itself as a receptor and prepare a system that can evaluate the characteristics and sensitivity of the landscape. In this study, we propose an evaluation method for preparing a marine landscape quality assessment document that reflects the project characteristics of offshore wind power projects, and examine the possibility of utilization by applying it to actual project sites as an example. To evaluate the quality of marine scenery in offshore wind power projects, evaluation items of landscape characteristics, physical characteristics, and socio-cultural characteristics were evaluated based on the preliminary survey contents, and the quality of marine scenery was divided into five grades. Next, the evaluation criteria of the evaluation items were synthesized and the quality of the marine landscape was classified into preservation grade (grade 5), semi-preservation grade (grade 4), buffer grade (grade 3), semi-improvement grade (grade 2), and improvement grade (grade 1). In addition, the Sinan-Ui Offshore Wind Farm, an actual project site, was randomly selected to conduct the evaluation process and examine its utilization. This study aims to complement the existing method of visual impact assessment in offshore wind power projects and evaluate the quality of the marine landscape itself to effectively conserve marine landscape resources during offshore wind power projects. Rather than relying on mechanical and quantitative evaluation, this study is expected to be used as a basis for comprehensive understanding of the location and socio-cultural characteristics of the project site and for communication and cooperation with stakeholders.