• Title/Summary/Keyword: The Four Major Rivers Restoration Project

Search Result 23, Processing Time 0.037 seconds

A Case Study on the Implementation of Integrated Operation System of the Nakdong River Estuary Barrage Due to the Drainage Gate Extension (낙동강 하굿둑의 배수문 증설에 따른 통합운영시스템의 구축 사례에 대한 연구)

  • Kim, Seokju;Lim, Taesoo;Kim, Minsoo
    • The Journal of Society for e-Business Studies
    • /
    • v.20 no.1
    • /
    • pp.183-199
    • /
    • 2015
  • Due to the Four Major Rivers Restoration Project, Nakdong River Estuary Barrage's designed flood quantity has been largely increased, and this has caused to construct several drainage gates at the right side of Eulsukdo island to secure the safety of downstream river area. For successful functioning of Nakdong River Estuary Barrage, such as flood control, disaster prevention, and the securing of sufficient water capacity, drainage gates at the both sides of island have to operate systematically and reliably. To manage this under restricted personnel and resources, we have implemented the IOS (Integrated Operation System) by integrating previous facilities and resources via information and communication technologies. The IOS has been designed to have higher availability and fault tolerance to function continuously even with the partial system's failure under the emergency situation like flood. Operators can use the system easily and acknowledge alarms of facilities through its IWS (Integrated Warning System) earlier. Preparing for Integrated Water Resources Management and Smart Water Grid, the architecture of IOS conformed to open system standards which will be helpful to link with the other systems easily.

Determination of Ecological Flow at the Confluence of Nakdong River and Gumho River Using River2D (River2D를 이용한 낙동강-금호강 합류부의 생태유량 산정)

  • Seo, Il Won;Park, Inhwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.947-956
    • /
    • 2013
  • In this study, WUA (Weighted Usable Area) was calculated to determine ecological flow at the confluence of Nakdong River and Gumho River by using River2D. To calibrate River2D, simulation results of River2D were compared with calibrated HEC-RAS simulation results and the optimum parameters were determined. After parameter calibration, WUA of Zacco platypus and Zacco temmincki which are dominant species in Nakdong River was calculated with changing upstream flowrate. From the result, WUA is changed according to flowrate and growth stage. In the flowrate-WUA/A graph, ecological flow can be determined as $33.3m^3/s{\sim}39.96m^3/s$ in Nakdong River and $3.6m^3/s{\sim}4.32m^3/s$ in Gumho River. After dredging for Four major rivers restoration project, WUA of Zacco platypus and Zacco temmincki were calculated by using the ecological flow. The results show that WUA after dredging are decreased when compared with undredged condition. WUA of Common carp is 2~3 times bigger than WUA of Zacco platypus and Zacco temmincki at the dredged condition in Nakdong River.

Performance evaluation of hyperspectral bathymetry method for morphological mapping in a large river confluence (초분광수심법 기반 대하천 합류부 하상측정 성능 평가)

  • Kim, Dongsu;Seo, Youngcheol;You, Hojun;Gwon, Yeonghwa
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.3
    • /
    • pp.195-210
    • /
    • 2023
  • Additional deposition and erosion in large rivers in South Korea have continued to occur toward morphological stabilization after massive dredging through the four major river restoration project, subsequently requiring precise bathymetry monitoring. Hyperspectral bathymetry method has increasingly been highlighted as an alternative way to estimate bathymetry with high spatial resolution in shallow depth for replacing classical intrusive direct measurement techniques. This study introduced the conventional Optimal Band Ratio Analysis (OBRA) of hyperspectral bathymetry method, and evaluated the performance in a domestic large river in normal turbid and flow condition. Maximum measurable depth was estimated by applying correlation coefficient and root mean square error (RMSE) produced during OBRA with cascadedly applying cut-off depth, where the consequent hyperspectral bathymetry map excluded the region over the derived maximum measurable depth. Also non-linearity was considered in building relation between optimal band and depth. We applied the method to the Nakdong and Hwang River confluence as a large river case and obtained the following features. First, the hyperspectal method showed acceptable performance in morphological mapping for shallow regions, where the maximum measurable depth was 2.5 m and 1.25 m in the Nakdong and Hwang river, respectively. Second, RMSE was more feasible to derive the maximum measurable depth rather than the conventional correlation coefficient whereby considering various scenario of excluding range of in situ depths for OBRA. Third, highly turbid region in Hwang River did not allow hyperspectral bathymetry mapping compared with the case of adjacent Nakdong River, where maximum measurable depth was down to half in Hwang River.