• Title/Summary/Keyword: The 4 major rivers restoration project

Search Result 21, Processing Time 0.017 seconds

A Case Study on the Implementation of Integrated Operation System of the Nakdong River Estuary Barrage Due to the Drainage Gate Extension (낙동강 하굿둑의 배수문 증설에 따른 통합운영시스템의 구축 사례에 대한 연구)

  • Kim, Seokju;Lim, Taesoo;Kim, Minsoo
    • The Journal of Society for e-Business Studies
    • /
    • v.20 no.1
    • /
    • pp.183-199
    • /
    • 2015
  • Due to the Four Major Rivers Restoration Project, Nakdong River Estuary Barrage's designed flood quantity has been largely increased, and this has caused to construct several drainage gates at the right side of Eulsukdo island to secure the safety of downstream river area. For successful functioning of Nakdong River Estuary Barrage, such as flood control, disaster prevention, and the securing of sufficient water capacity, drainage gates at the both sides of island have to operate systematically and reliably. To manage this under restricted personnel and resources, we have implemented the IOS (Integrated Operation System) by integrating previous facilities and resources via information and communication technologies. The IOS has been designed to have higher availability and fault tolerance to function continuously even with the partial system's failure under the emergency situation like flood. Operators can use the system easily and acknowledge alarms of facilities through its IWS (Integrated Warning System) earlier. Preparing for Integrated Water Resources Management and Smart Water Grid, the architecture of IOS conformed to open system standards which will be helpful to link with the other systems easily.