Development of a New Numerical Analysis Method for Nodal Probabilistic Production Cost Simulation (각 부하지점별 확률론적 발전비용 산정을 위한 수치해석적 방법의 개발)

  • Kim, Hong-Sik;Mun, Seung-Pil;Choe, Jae-Seok;No, Dae-Seok;Cha, Jun-Min
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.9
    • /
    • pp.431-439
    • /
    • 2001
  • This Paper illustrates a new numerical analysis method using a nodal effective load model for nodal probabilistic production cost simulation of the load point in a composite power system. The new effective load model includes capacities and uncertainties of generators as well as transmission lines. The CMELDC(composite power system effective load duration curve) based on the new effective load model at HLll(Hierarchical Level H) has been developed also. The CMELDC can be obtained from convolution integral processing of the outage capacity probabilistic distribution function of the fictitious generator and the original load duration curve given at the load point. It is expected that the new model for the CMELDC proposed in this study will provide some solutions to many problems based on nodal and decentralized operation and control of an electric power systems under competition environment in future. The CMELDC based on the new model at HLll will extend the application areas of nodal probabilistic production cost simulation, outage cost assessment and reliability evaluation etc. at load points. The characteristics and effectiveness of this new model are illustrated by a case study of MRBTS(Modified Roy Billinton Test System).

  • PDF

Latin Hypercube Sampling Based Probabilistic Small Signal Stability Analysis Considering Load Correlation

  • Zuo, Jian;Li, Yinhong;Cai, Defu;Shi, Dongyuan
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1832-1842
    • /
    • 2014
  • A novel probabilistic small signal stability analysis (PSSSA) method considering load correlation is proposed in this paper. The superiority Latin hypercube sampling (LHS) technique combined with Monte Carlo simulation (MCS) is utilized to investigate the probabilistic small signal stability of power system in presence of load correlation. LHS helps to reduce the sampling size, meanwhile guarantees the accuracy and robustness of the solutions. The correlation coefficient matrix is adopted to represent the correlations between loads. Simulation results of the two-area, four-machine system prove that the proposed method is an efficient and robust sampling method. Simulation results of the 16-machine, 68-bus test system indicate that load correlation has a significant impact on the probabilistic analysis result of the critical oscillation mode under a certain degree of load uncertainty.

Stability analysis of settled goaf with two-layer coal seams under building load-A case study in China

  • Yao, Lu;Ning, Jiang;Changxiang, Wang;Meng, Zhang;Dezhi, Kong;Haiyang, Pan
    • Geomechanics and Engineering
    • /
    • v.32 no.3
    • /
    • pp.245-254
    • /
    • 2023
  • Through qualitative analysis and quantitative analysis, the contradictory conclusions about the stability of the settled goaf with two-layer coal seams subject to building load were obtained. Therefore, it is necessary to combine the additional stress method and numerical simulation to further analyze the foundation stability. Through borehole analysis and empirical formula analogy, the height of water-conducting fracture zone in No.4 coal and No.9 coal were obtained, providing the calculation range of water-conducting fracture zone for numerical simulation. To ensure the accuracy of the elastic modulus of broken gangue, the stress-strain curve were obtained by broken gangue compression test in dried state of No.4 coal seam and in soaking state of No.9 coal seam. To ensure the rationality of the numerical simulation results, the actual measured subsidence data were retrieved by numerical simulation. FISH language was used to analyze the maximum building load on the surface and determine the influence depth of building load on the foundation. The critical building load was 0.16 MPa of No.4 settled goaf and was 1.6 MPa of No.9 settled goaf. The additional stress affected the water-conducting fracture zone obviously, resulted in the subsidence of water-conducting fracture zone was greater than that of bending subsidence zone. In this paper, the additional stress method was analyzed by numerical simulation method, which can provide a new analysis method for the treatment and utilization of the settled goaf.

Load comparison of 750kW WTGS by field test (750kW 풍력발전기 현장시험을 통한 하중 비교)

  • Bang, Jo-Hyug;Hong, Hyeok-Soo;Park, Jin-Il;Ryu, Ji-Yune
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.303-306
    • /
    • 2008
  • This study proposes an essential process of type certificate, which is load comparison for proving the calculated design load. The load measurement was carried out according to IEC 61400-13 standard and the load calculation was performed with same condition using FLEX 5 code. For more accurate load simulation, the controller parameter of original model at the design stage was modified to site optimized value and some node points are added to coincidence with measurement. The load comparison was performed with various wind parameter, turbulence intensity and wind shear. As a result, simulated loads ware good agreed with the measured load. Therefore, the calculated design loads according to IEC 61400-1 standard were proved to valid.

  • PDF

Development of Ice Load Generation Module to Evaluate Station-Keeping Performance for Arctic Floating Structures in Time Domain

  • Kang, Hyun Hwa;Lee, Dae-Soo;Lim, Ji-Su;Lee, Seung Jae;Jang, Jinho;Jung, Kwang Hyo;Lee, Jaeyong
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.394-405
    • /
    • 2020
  • To assess the station-keeping performance of floating structures in the Arctic region, the ice load should be considered along with other environmental loads induced by waves, wind, and currents. However, present methods for performance evaluation in the time domain are not effective in terms of time and cost. An ice load generation module is proposed based on the experimental data measured at the KRISO ice model basin. The developed module was applied to a time domain simulation. Using the results of a captive model test conducted in multiple directions, the statistical characteristics of ice loads were analyzed and processed so that an ice load corresponding to an arbitrary angle of the structure could be generated. The developed module is connected to commercial dynamic analysis software (OrcaFlex) as an external force input. Station-keeping simulation in the time domain was conducted for the same floating structure used in the model test. The mooring system was modeled and included to reflect the designed operation scenario. Simulation results show the effectiveness of the proposed ice generation module and its application to station-keeping performance evaluation. Considering the generated ice load, the designed structure can maintain a heading angle relative to ice up to 4°. Station-keeping performance is enhanced as the heading angle conforms to the drift direction. It is expected that the developed module will be used as a platform to verify station-keeping algorithms for Arctic floating structures with a dynamic positioning system.

A Dynamic Simulation of Voltage Instability Using EMTP (EMTP를 이용한 전압 불안정 현상의 동적 시뮬레이션)

  • 허정용;김철환
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.6
    • /
    • pp.295-300
    • /
    • 2003
  • Voltage instability has been studied for some decade now. But, There is not generally accepted definition of voltage instability because of the complex phenomenon and the variety of ways in which it can manifest itself. Both IEEE and CIGRE have the respective definitions. The areas of voltage instability research are the analysis, simulation and countermeasure of voltage instability. It needs to model the components of the power system to simulate the voltage instability and voltage collapse. At the beginning, the static simulation was used. This method provides the voltage stability indices and it requires less CPU resource and gives much insight into the voltage and power problem. However, it is less accurate than the dynamic simulation peformed in the time domain simulation. So, when it appears difficult to secure the voltage stability margin in a static stability, it is necessary to perform the dynamic simulation. To perform time-domain simulation, we have to model the dynamic component of the power system like a generator and a load. The dynamic simulation provides the accurate result of the voltage instability. But, it is not able to provide the sensitivity information or the degree of stability and it is time consuming and it needs much CPU resource. In this Paper, we perform a dynamic simulation of voltage instability and voltage collapse using EMTP MODELS. The exponential load model is designed with MODEIS and this load model is connected with test power system. The result shows the process of voltage change in time domain when the voltage instability or voltage collapse occurs.

Estimation of Vehicle Driving-Load with Application to Vehicle Intelligent Cruise Control

  • Kyongsu Yi;Lee, Sejin;Lee, Kyo-Il
    • Journal of Mechanical Science and Technology
    • /
    • v.15 no.6
    • /
    • pp.720-726
    • /
    • 2001
  • This paper describes a vehicle driving-load estimation method for application to vehicle Intelligent Cruise Control (ICC). Vehicle driving-load consists of aerodynamic force, rolling resistance, and gravitational force due to road slope and is unknown disturbance in a vehicle dynamic model. The vehicle driving-load has been estimated from engine and wheel speed measurements using a vehicle dynamic model a least square method. The estimated driving-load has been used in the adaptation of throttle/brake control law. The performance of the control law has been investigated via both simulation and vehicle tests. The simulation and test results show that the proposed control law can provide satisfactory vehicle-to-vehicle distance control performance for various driving situations.

  • PDF

Identification of Excitation System Model Parameters from the Test of Switching from MVR Mode to AVR Mode (MVR모드에서 AVR모드로의 절환에 의한 여자계 모델정수 결정)

  • Kim, Dong-Joon;Moon, Yung-Hwan;Choi, Kyung-Sun;Lyu, Seung-Hhon;Song, Seok-Ha;Lee, Heung-Taek
    • Proceedings of the KIEE Conference
    • /
    • 1996.11a
    • /
    • pp.91-94
    • /
    • 1996
  • A simulation procedure was developed for identifying Yungnam unit 2 excitation model parameters to improve the accuracy of stability simulation of KEPCO. First, generator model parameters are derived by using modified load rejection technique from measured load rejection test. For identifying excitation model parameters, switch was changed from MVR mode to AVR mode in Yungnam unit 2 excitation system instead of applying to a small step to the voltage reference($V_{ref}$) because of saving time and efforts, assuming the test result would show coincided result with applying to a small step to the $V_{ref}$. However, it was found that the response of switching from MVR to AVR is greatly different from it of applying small signal to the $V_{ref}$. A simulation procedure was needed to take into accounts of real AVR component status before and after switching from MVR to AVR. This paper reports the procedure which duplicated the measured response and addresses the merits of this test on conventional AVR step test.

  • PDF

Numerical Analysis Method for Nodal Probabilistic Production Cost Simulation (각 부하지점별 확률론적 발전비용 산정을 위한 수치해석적 방법)

  • Kim, Hong-Sik;Moon, Seung-Pil;Choi, Jae-Seok;Rho, Dae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.112-115
    • /
    • 2001
  • This paper illustrates a new nodal effective load model for nodal probabilistic production cost simulation of the load point in a composite power system. The new effective load model includes capacities and uncertainties of generators as well as transmission lines. The CMELDC based on the new effective load model at HLII has been developed also. The CMELDC can be obtain from convolution integral processing of the outage capacity probabilistic distribution function of the fictitious generator and the original load duration curve given at the load point. It is expected that the new model for the CMELDC proposed. In this study will provide some solutions to many problems based on nodal and decentralized operation and control of an electric power systems under competition environment in future. The CMELDC based on the new model at HLII will extend the application areas of nodal probabilistic production cost simulation, outage cost assessment and reliability evaluation etc. at load points. The characteristics and effectiveness of this new model are illustrated by a case study of a test system.

  • PDF

A Study on Economic Evaluations of ESS Load Test Device for Field Load Test in Fire-fighting Emergency Generator Systems (소방용 비상발전기의 현장부하시험을 위한 ESS 부하시험장치의 경제성평가에 관한 연구)

  • Choi, Seung-Kyou
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.380-386
    • /
    • 2020
  • The ESS load test device (ELTD) can store and exchange electrical energy during the load test of an emergency generator. On the other hand, it is difficult to commercialize ELTDs based on Li-ion batteries because of the high initial cost, which is higher than a load bank test. If the trade of electrical energy stored in ELTD during the test of an emergency generator is considered, it may be possible to commercialize the ELTD. Therefore, this paper proposes an economic model of ELTD composed of the costs and benefits by considering electrical energy trade to perform accurately economic evaluations of an ELTD. From the simulation results of the economic evaluations of an ELTD and the load bank method, it was found that the commercialization of ELTD is possible when the trade in electrical energy in ELTDs is considered.