• Title/Summary/Keyword: Temporary structure

Search Result 303, Processing Time 0.03 seconds

Analysis of Permeability Characteristic for Z type Steel Sheet Pile by Field Test (현장시험 시공을 통한 Z형 강널말뚝의 현장차수특성 분석)

  • 이용수;정하익;홍승서;이광범;김상진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.325-330
    • /
    • 2000
  • In general steel sheet pile use the containment system, vertical barrier systems for waste disposal and landfill purposes, roads in excavation which have a more permanent character or temporary structure. The sheet pile joints between section of the wall are sealed with a filter material arid the resistance to seepage is a function of the type of material employed. The aim of this paper is to review a characteristic of permeability for Z type sheet pile by field test in various condition.

  • PDF

Receding Horizon FIR Parameter Estimation for Stochastic Systems

  • Lee, Kwan-Ho;Han, Soo-Hee;Lee, Changhun;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.159.1-159
    • /
    • 2001
  • A new time-domain FIR parameter estimation called the receding horizon least square estimation (RHLSE) is suggested for stochastic systems by combining the well known least square estimation with the receding horizon strategy. It can be always obtained without the requirement of any \textit{a priori} information about the horizon initial parameter. A fast algorithm for the suggested estimation is also presented which is remarkable in the view of computational advantage and simple implementation. It is shown that the proposed estimation is robust against temporary modeling uncertainties due to their FIR structure through simulation studies.

  • PDF

Performance Evaluation and Housing Design for Direct Current Surge Arrester in Railway Rolling Stock (직류 전차 탑재형 피뢰기의 하우징 설계 및 성능평가)

  • 조한구;김석수;한세원;이운용
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2000.07a
    • /
    • pp.128-131
    • /
    • 2000
  • The main objective of this paper is to design and test a new type of polymer ZnO surge arrester for DC power system of railroad vehicles. The rated voltage is 1500V direct current. The main research works are focused on structure design by finite element method, rating voltage, temporary over voltage and studies of characteristics of polymeric surge arrester.

  • PDF

Influence of the material for preformed moulds on the polymerization temperature of resin materials for temporary FPDs

  • Pott, Philipp-Cornelius;Schmitz-Watjen, Hans;Stiesch, Meike;Eisenburger, Michael
    • The Journal of Advanced Prosthodontics
    • /
    • v.9 no.4
    • /
    • pp.294-301
    • /
    • 2017
  • PURPOSE. Temperature increase of $5.5^{\circ}C$ can cause damage or necrosis of the pulp. Increasing temperature can be caused not only by mechanical factors, e.g. grinding, but also by exothermic polymerization reactions of resin materials. The aim of this study was to evaluate influences of the form material on the intrapulpal temperature during the polymerization of different self-curing resin materials for temporary restorations. MATERIALS AND METHODS. 30 provisonal bridges were made of 5 resin materials: Prevision Temp (Pre), Protemp 4 (Pro), Luxatemp Star (Lux), Structure 3 (Str) and an experimental material (Exp). Moulds made of alginate (A) and of silicone (S) and vacuum formed moulds (V) were used to build 10 bridges each on a special experimental setup. The intrapulpal temperatures of three abutment teeth (a canine, a premolar, and a molar,) were measured during the polymerization every second under isothermal conditions. Comparisons of the maximum temperature ($T_{Max}$) and the time until the maximum temperature ($t_{TMax}$) were performed using ANOVA and Tukey Test. RESULTS. Using alginate as the mould material resulted in a cooling effect for every resin material. Using the vacuum formed mould, $T_{Max}$ increased significantly compared to alginate (P<.001) and silicone (P<.001). In groups Lux, Pro, and Pre, $t_{TMax}$ increased when the vacuum formed moulds were used. In groups Exp and Str, there was no influence of the mould material on $t_{TMax}$. CONCLUSION. All of the mould materials are suitable for clinical use if the intraoral application time does not exceed the manufacturer's instructions for the resin materials.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Study on the Actual Condition of Scaffolding Construction in Accordance with the Revision of Safety Standards (비계공사 안전기준 개정에 따른 현장적용 실태에 관한 연구)

  • Kim, Ja Yeon;Cho, Youn Hee
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.15-22
    • /
    • 2020
  • Scaffolding works are demolished after this structure is completed, and safety accidents often occur because they are installed differently from legal standards or frequently change during work. Therefore, in order to strengthen the safety of scaffolding, the Ministry of Land, Infrastructure and Transport required a need for design standards for temporary facilities that can systematically prevent and solve large-scale safety accidents that are repeatedly increasing during temporary construction. It has been enacted, and some contents have been revised for the past three years. However, construction site personnel do not know or know the revised matters, but often install scaffolding by the installer's experience rather than complying with relevant laws and regulations. It is the situation that the ground strength test of the foundation ground for the load applied to the floor of the column is omitted in most sites. Therefore, this study grasped the actual situation on the degree of recognition of the revised laws and regulations of the construction site and the foundation-based treatment of the floor working load of the scaffolding column, and derived problems. In addition, we intend to provide reference materials for the endurance test according to the ground conditions to small-scale small sites where it is difficult to conduct the test by carrying out the endurance test of the scaffolding ground according to the revised standards.

Architectural Design Elements for Hazard-Resistant and Reduction House (방재 및 감재주택을 위한 건축 계획 요소의 설정)

  • Kim, Hyeong-Eon
    • KIEAE Journal
    • /
    • v.16 no.6
    • /
    • pp.77-82
    • /
    • 2016
  • Purpose: Almost every research carried out in our country against the natural disaster is focused on the temporary facilities such as temporary housing, emergency shelter and as a result, it is very hard to find out researches on the ordinary houses which installed integrated systems of hazard-resistant against the natural disaster. Method: To conduct this research, categorizing process for design, structural, environmental and installation elements found in the Hazard-Resistant and Reduction House built for sale in Japan was performed. Result: In this study, several design concepts and subordinate items are recommended for hazard-resistant housing. First, design concept of 'Preparedness' which means security and access to the storage storing goods especially food & beverage for the emergencies is needed. The subordinate items consist of security of stocking space, diversified and circular storage system, and safety storage system. Second, design concept of 'Security' which means security of physical safety space and rapid recovery to returning to daily life against natural disaster is needed. The subordinate items consist of many items including not only structure and facilities but also architectural design method. And finally, design concept of 'Maintenance, Support and Return' which means minimizing the physical and psychological damages and support safety and physical conditions of the victims from the impact of the disaster to returning to daily life is needed. The subordinate items consist of high efficiency insulation/airtightness design, microclimate design, combination of photovoltaic system and storage battery, non-power appliance system against the power failure, storing system for drinking water, rainwater storing and utilization system.

Automatic design, planning and drawing of scaffolding system for constructions

  • Hara, Takashi;Shimomura, Katsukiyo;Hamano, Keita;Miyake, Shoko
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.179-196
    • /
    • 2019
  • Temporary scaffold systems in the construction site play an important role for ensuring the safety of the workers and for constructing the stable structures. To assemble the scaffold, the pipe scaffolding system, the wedge binding scaffolding system and the particular materials have been utilized. To design the material arrangement of a scaffold, firstly the configuration was determined considering the construction geometry. Then, the strength of the scaffold was confirmed and the quantity of the material was accounted. In this paper, the design method of the temporary scaffold was proposed for intending the semi-automatic procedure. In the proposed design method, the geometric design and the safety requirement were specified by the safety standard and the design flow was followed by the designer's knowledge. The size and the quantities of the materials were calculated by referring to the relation between the scaffold and the constructing structure. In the calculating procedure, three dimensional positions of each scaffold materials were calculated and recorded simultaneously. Then, three dimensional scaffold structural was drawn semi-automatically on the CAD software by using the obtained material sizes, positions and directions. The proposed design method provides us the precise quantities of scaffold materials and enables us to reduce the design effort and the cost estimation processes. In addition, the obtained results can be applied to BIM software after converting to IFC format.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

The Case Study on the Erection Construction Method for Soft Retractable Roof Structures (연성개폐 지붕구조물 Erection 시공법에 관한 사례 연구)

  • Park, Keum-Sung;Kim, Hyung-Do;Kwak, Myong-Keun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.101-108
    • /
    • 2016
  • Lifting plan in the large spacial structure is an important factor influencing the efficiency and economy of the construction process. The purpose of this study was deriving the requirements for lifting techniques as the basic research in the double spoke wheel roof structure construction. In the lift up erection method, management plan of the interference error in the column and outer-ring was needed that occur during lifting roof structure. In the bent erection method, material usage reduction plan was required by the structural design of the temporary bent. In the hybrid erection method, lifting plan was needed that minimizes weather condition and crane usage. All lifting techniques were required Value Engineering model for reduction of cost and construction period.