• Title/Summary/Keyword: Temporary Building

Search Result 217, Processing Time 0.026 seconds

Measures for Improving the Quality of Temporary Container Classrooms (컨테이너 임시교사의 품질개선방안)

  • Yu, Byong-Jae;Bang, Hong-Soon;Lee, Jong-Sung;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.38-39
    • /
    • 2021
  • The use of temporary container classrooms has increased in recent years due to the development of the construction industry and renovation or rehabilitation of schools. Therefore, various problems, such as errors during assembling, design and insulation issues, and noise problems, have surfaced during the construction of temporary container classrooms. This study analyzes the causes of assembly errors during the manufacturing and installation processes to improve the quality of temporary container classrooms. Assembly errors are caused by non-level planes and inaccurate cutting during the manufacturing process. In the installation process, poor leveling is a major factor that causes errors during the assembly of temporary container classrooms. These causes result in uneven horizontal or vertical planes and uneven height. To solve these problems, quality improvement measures, such as pin connection, jig, joint coupling, and surface plates are proposed in this study.

  • PDF

The Classification Plan on Safety Certification System of Temporary Equipment (건설 가설재의 안전인증 분류방안)

  • Park, Sang-Wook;Park, Jun-Mo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.794-799
    • /
    • 2008
  • At the point of changing from the capacity qualification of temporary equipments for building to safety certification system, the meaning of qualification and the present state of main products are evaluated for Capacity qualification system and compare with related system in developed country. These suggest classification of temporary equipments for building construction in safety certification. Now, present state of the capacity qualification system is estimated; according to the reforming system from restating law in 2003, there are a lot of changing of application in every 3 years because of that. The ability of Making business is improved by checking again but, there are limitation to constantly keep the safety as the system to approve form about sent imitation products. Changing from the capacity qualification system to safely certification system make to include the structure of the qualification system and make a plan standard. It make least panic in the building market and set up some standards for capacity by changing building circumstance. The classification of temporary equipment for building construction in safety certification from the module of quotation form classify each duty quotation item, self-regulation safely verification item and option quotation item, these will more improve the system form and quality of temporary equipment for building than before.

  • PDF

Ensuring safety of temporary structures through on-site real-time structural analysis Construction Sites (가설구조물 구조검토의 실시간 현장 반영을 통한 안전성 확보)

  • Mo, Seung-Un;Moon, Seong Oh
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.19-20
    • /
    • 2022
  • Based on the survey analysis of safety accidents at construction sites that occur every year, most of them are caused by temporary structures. While analyzing in detail, it is confirmed that the main factors for such accidents are the quality problem of temporary equipment, unstable construction, and arbitrary change. As temporary structure is installed only for the construction of main structure, the reality is that no attention is paid to the construction of temporary structures.

  • PDF

Development of Temporary Facility Planning System for High-rise Building Constructions through the Analysis of Influence Factors (영향요소 분석에 의한 고층건축공사의 가설계획시스템 개발)

  • Jang Myung-Houn
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.164-173
    • /
    • 2002
  • The high-rise building construction field in the urban area is short of working space because it is surrounded by adjacent buildings and nearby roads. The insufficient space causes problems of interference and conflicts in transporting materials and working at the site. These problems can be resolved partly through the proper selection and layout of temporary facilities. A method proposed in this paper supports a decision-maker to evaluate and select the alternatives of temporary facilities plans by establishing and analyzing processes and influence factors of them. Knowledges considered in planning temporary facilities layout are structurized and a program is implemented for a field manager. Case studies are performed to evaluate the feasibility and applicability of the proposed method.

  • PDF

A Development of the Construction Manual for the Prefabricated Temporary Housing in Subway Stations (지하철역의 조립식 임시주거 시공 매뉴얼 개발 연구)

  • Kim, Eun Young;Jang, Soon Gak;Hwang, Eun Kyoung
    • Journal of the Korean housing association
    • /
    • v.26 no.5
    • /
    • pp.45-52
    • /
    • 2015
  • Following natural disasters, there is a need to develop temporary housing through the rapid installation of mass-produced prefabricated housing. This study has developed a model construction manual for prefabricated temporary housing installable in underground spaces. First, the temporary housing prototype was drawn based on opinion poll results from earlier studies. $4.32m^2$ was calculated as the basic unit of the temporary housing living space for one person. Units included panel type, box type and mixed-type, for a variety of field conditions and scales. In order to enable space expansion and movement desirable to the user, the prototype was combination of panel and box types. The drawn prototype was utilized as the basic design template for producing prototypes and for the manual. Second, the possibility of utilizing subway stations as temporary housing was verified through the production of the prototype, and the construction process was summarized in the manual. The manual was developed in the form of a checklist to provide a guideline for users to build with prefab materials.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

A Study on the Design Model of Modular Building System for Disaster Restorations in Fishing and Agrarian Villages (농어촌 재해복구용 모듈러 건축물의 설계안 연구)

  • Lim, Jae-Han
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.9 no.3
    • /
    • pp.33-45
    • /
    • 2007
  • Recently, large scale disasters have been occurred in rural areas. Most people suffering from the disaster live in the temporary containers. These could not provide the fundamental occupancy performances such as thermal insulation, ventilation and heating system. It is very important to rebuild the residence for sufferers quickly and safely. Because modular building system has some advantages such as short construction time, mobility, light-weight structure, modularity, flexibility and economical efficiency, it is expected that it could be easily applied to the disaster restoration. So, this research aims at developing the design model of modular building system for disaster restorations in fishing and agrarian villages. For this purpose, current counterplan for restoration was firstly investigated. Also the basic guideline was established through the investigation of current status of residence in fishing and agrarian villages. Finally, 2 types of design model such as single story residence and temporary accommodation facility were proposed. We could see that we could make the flexible building plan when applying the modular building system to the temporary housing for the sufferers.

  • PDF

A Study on Application of Construction Temporary System to Recover from Disaster on Heavy Snow (폭설재난에 대한 건설가설복구지원체계 활용방안 검토)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Ju;Kang, You-Mi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.59-60
    • /
    • 2011
  • In the 21th century, there ate problems of the environment caused by industrialization. for several years, the world has suffered great losses because of unforeseen weather phenomena. to make a system is needed about natural disaster especially to restore disaster on heavy snow, a role of construction temporary system is important. it needs to be construction temporary system to recover through analysing cases of disaster on heavy rain.

  • PDF

A Study on the Improvement Plan of Reusable Pipe Support Certification System (재사용 파이프서포트 인증제도의 개선방안 연구)

  • Moon, Seong-Oh;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.4-5
    • /
    • 2020
  • Pipe support is a representative structure that supports slab formwork, and it is a representative temporary equipment that has been systematically managed since the 1990s when the domestic temporary equipment performance test system was introduced. Nevertheless, it is also a reality that many of the products in circulation are used products that are reused and do not meet the performance of the initial manufacturing stage. However, if only new products are insisted, it could lead to delays in the process due to an increase in construction costs and difficulties in timely delivery. On the contrary, it is not acceptable for the safety of the construction site to use products of low quality without verification procedures or standards. Therefore, this study attempts to grasp the management system such as safety certification for temporary equipment and the actual condition of quality control to maintain performance, and propose improvement plans.

  • PDF

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.