• Title/Summary/Keyword: Tank Container

Search Result 92, Processing Time 0.016 seconds

Dewaterability Improvement and Volume Reduction of Bio-Solid using Ultrasonic Treatment (Bio-Solid의 탈수성 개선 및 감량화를 위한 초음파 적용)

  • Park, Cheol;Ha, Jun Soo;Kim, Young Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.4019-4023
    • /
    • 2014
  • This study examined the effectiveness of ultrasound on enhancing the dewaterability and volume reduction of bio solids from a waste treatment plant. The test specimen was obtained from a storage tank immediately before the dewatering process at a local treatment plant. The test conditions included the energy levels of ultrasonic waves and treatment time. The tests were undertaken using three types of different treatment processors (7 liter, 1 ton, 7 ton container). The capillary suction time (CST) and the viscosity of sludge, which is one of the influencing factors for dewaterbility, were obtained under various test conditions. The results showed that ultrasound increases the CST of the raw specimens, whereas a significant reduction (20 % of the maximum value) of CST occurred in the sample with ultrasound and flocculent. The decrease in viscosity reached 40 % of the maximum value. A centrifugal test was performed to examine the characteristics of the sludge settlement. The settling rate and time required to reach the final values were both enhanced by the ultrasonic energy. An ultrasonic treatment is potentially useful tool for reducing the amount of released sludge. To examine the possible use of field application, the real scale sonic processor was designed and operated. The results were similar (50 % of the maximum value) to those of laboratory experiments.

Short-Term Nutrient Enrichment Bioassays and Nutrient Limitation in Daechung Reservoir (대청호에서의 단기 영양염 첨가 실험 및 제한 영양염류 분석)

  • Lee, Sang-Jae;An, Kwang-Guk
    • Korean Journal of Ecology and Environment
    • /
    • v.43 no.1
    • /
    • pp.136-141
    • /
    • 2010
  • In situ experiments of Nutrient Enrichment Bioassays (NEBs) were conducted in the field along with in the laboratory to determine which nutrient limited phytoplankton growth as a indicator of primary productivity. For the NEBs, the water was sampled using a polyethylene-lined container and dispensed into 6 L water tank in the laboratory. The control (C, no nutrient spike) and six treatments of phosphorus (P), 2-fold phosphorus (2P), 4-fold phosphorus (4P), nitrate nitrogen ($NO_3$-N), 2-fold nitrate nitrogen ($2NO_3$-N), and phosphorus and nitrate nitrogen (P+$NO_3$-N) were set up in the lacustrine zone near the dam site, Daechung Reservoir in September, 2009 and analyzed the diel changes of total nitrogen (TN), total phosphorus (TP), and chlorophyll-$\alpha$ (Chl-$\alpha$) in the cubitainers. The short-term NEBs showed that algal response in the treatments spiked phosphorus (P, 2P, and 4P) were significantly (p < 0.05) greater than the response in the control (C), and nitrogen-spike. Also, the response in 4P-treatment was greater than those in the P- and 2P-treatments. In contrast, there was no significant differences (p > 0.20) between the $NO_3$-N and $2NO_3$-N treatment. The outcomes of the NEBs suggest that phosphorus limited the phytoplankton growth and nitrogen was not limited in this system. Furthermore, in the N + P treatments, the response was minimum, compared to all other treatments and the control, indicating that even if the system is evidently P-limited system, when added the nitrogen, the response showed the inhibition. Also, > 95% of observed long-term TN:TP ratios in the ambient water showed > 17, which is the criteria of P-limitation, supporting the P-limitation in the system. Overall, these results suggest that phytoplankton biomass near the dam is a direct linear function of P-loading near the watershed, if the phosphorus pool is mainly dissolved fraction.