• 제목/요약/키워드: TWBP Market

검색결과 14건 처리시간 0.018초

Proposed Method for Determining Price Cap in the Korean Electricity Market Applicable to TWBP

  • Kang Dong-Joo;Moon Young-Hwan;Kim Balho H.
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권2호
    • /
    • pp.199-203
    • /
    • 2005
  • This paper proposes the level of price cap in the TWBP(Two- Way Bidding Pool) market in Korea for which the draft of market design has been prepared by KPX. Max - GMCP(Maximum Generation Market Clearing Price) and APC(Administered Price Cap) would be separately applied as individual price caps for a normal period and a Price Capping period in TWBP. The level of price cap is determined for inducing optimal investment in the Korean Electricity Market considering the 'electricity resource baseline plan' published by the Korean government in 2002 for maintaining government-leading resource planning in Korea. In this regard, Max - GMCP is calculated from the equilibrium condition of investment based on reliability standard and fixed cost of the peaking plant. For verifying the propriety of the proposed price cap, this paper compares the proposed value with the estimated VoLL(Value of Lost Load) based on Korea's GDP(Gross Domestic Product).

베스팅계약 전력시장에서 선물 최적헷지전략 연구 (Optimal Hedge Strategy Using Future Contract in the Vesting Contract Electricity Market)

  • 맹근호;송광재;박종근
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권7호
    • /
    • pp.414-419
    • /
    • 2004
  • In TWBP new uncertainty will be increased. Risk management is risen to a important problem. Vesting contract makes market Players trade at fixed price in TWBP early stages. In the case of advanced country, market players manage risk with a future contract. When a risk management method moves from vesting contract to future contract, it may have to use together two contracts for schedule period. In this paper, risk management strategy that use vesting contract and forward contract at the same time is proposed.

닷넷 환경기반의 시장 모델링 및 가격모의 프로그램 개발 (Development of Market Modeling and Price Simulator(MMPS) Under the .NET Framework)

  • 허진;강동주;정해성;문영환
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권2호
    • /
    • pp.88-96
    • /
    • 2005
  • At present, the Korean electricity industry is undergoing restructuring and the Cost Based-generation Pool(CBP) market is being operated preparing for Two Way Bidding Pool(TWBP) market open. As the circumstance of the traditional system is changed according to power system deregulation, the simulation tool which should reflect market code providing market operating mechanism is needed to analyze an electricity market. This paper presents the development of an unique market simulator, Market Modeling and Price Simulator(MMPS) that is designed to imitate the Korean electricity market considering uniform price. The MMPS is developed in VB.NET and is composed of two modules that consist of market modeling and price simulation interfacing access database program. To evidence the features and the performance of MMPS, a small two way bidding market with 12-bus system and one way bidding market for generator competition will be presented for the electricity market simulations using MMPS.

TWBP 시장에서의 시장지배력 행사 가능성 분석 (Market Power Analysis in the TWBP market)

  • 강동주;허진;김태현;문영환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.466-468
    • /
    • 2003
  • 본 논문에서는 산업자원부에 의해 확정된 제5차 장기전력수급계획에 근거하여 2004년에서 2009년까지의 기간에 대해 시장지배력 사업자인 한수원의 시장지배력 행사 가능성을 분석해 보았다. 시뮬레이션은 본 연구원에서 보유하고 있는 PLEXOS로 각 해당 년도 내 임의의 하루 24시간을 선정하여 수행하였다. 시뮬레이션 결과는 2004년과 2007년을 선택하여 정리하였다. 2004년은 베스팅 계약의 비율이 100%에 가깝고 2007년에는 절반 정도로 떨어지게 된다. 2가지 경우의 결과를 비교하여 베스팅 계약이 시장에 미치는 영향과 시장지배력 행사 가능성을 분석할 수 있다.

  • PDF

전력시장에서의 시장가격예측 및 발전회사의 수익성 분석 (A Study on the Korean Electricity Market Price and Cost/Benefit Analysis of each Generation Resource Type)

  • 강동주;정해성;허진;김태현;문영환;정구형;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.272-274
    • /
    • 2004
  • 양방향입찰시장(TWBP)의 도입을 위해서는 이를 위한 시장설계 및 효율적인 시장운영을 위한 다양한 분석 작업들이 요구되고 있다. 특히 시장설계의 경우, 해외 자문회사와의 협력을 통해 경쟁적 전력시장을 이미 도입하여 운영하고 있는 해외 국가들의 사례들을 포함한 많은 시장운영 기법들이 검토되고 있으며 향후 도입될 TWBP 전력시장에 적합한 방안들을 준비하고 있다. 전력을 전력시장운영규칙이 정하는 바에 따라 전력시장을 통해서만 거래하도록 규정하고 있는 우리나라의 경우, 전력시장운영규칙은 전력시장과 전력계통의 운영에 대한 모든 것을 다루게 되는 만큼 이에 대한 합리적인 설계와 적용은 효율적인 TWBP 전력시장의 기본 틀이라고 할 수 있다. 양방향입찰시장에서의 가격결정은 전력수급과 시장가격 안정화를 위해 매우 중요한 사안이다. 또한 현재 CBP시장과 다른 용량요금(CP)제도의 폐지와 기타 공급예비력확보 제도 등 도매시장설계에 있어 중요한 자료를 제공한다. 양방향입찰시장하에서 가격수준 분석을 통해 시장개설 이전에 문제점을 사전에 검토하여 문제점을 개선하고 시장규칙에 반영하여야 한다. 또한 용량요금 폐지에 따른 보완대책을 수립하여 수급불안정을 방지하고 전력시장 안정화와 성공적인 도매경쟁시장 개설을 위해 필수적이라 할 수 있다. 본 논문에서는 CBP 시장과 TWBP 시장에서의 기본적 가격예측을 위한 구조적 모델링과 일부 시나리오에 대한 결과를 소개하고자 한다.

  • PDF

객체지향기법을 이용한 도매전력시장에서의 급전계획 프로그램 개발 (A Development of Dispatch Schedule Program for TWBP Using Object Oriented Technique)

  • 김광원
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권3호
    • /
    • pp.152-157
    • /
    • 2005
  • An objected-oriented programming(OOP) technique is introduced to dispatch schedules for TWBP. Some dispatch schedules such as constrained (pre)dispatch, unconstrained (pre)dispatch, and nominal self-dispatch schedule need to be peformed to make power market work. These dispatch schedules are similar but have some differences in required constraints, needed data, and scheduling time. Therefore, it makes the scheduling program simple to introduce the OOP technique to this problem: to have each instance of the OOP perform its own dispatch scheduling. The developed program adopts linear programming(LP) as an optimization tool and could consider some crucial constraints such as power balance, generation power limits, generation ramp-rates, power limitations of transmission lines, and power system security.

선형계획법을 이용한 양방향입찰시장에서의 제약급전계획 연구 (A Study on the Constrained Dispatch Scheduling Using Linear Programming for TWBP)

  • 김광원;이종배;정정원
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권10호
    • /
    • pp.573-580
    • /
    • 2004
  • A new real-time constrained dispatch scheduling (CDS) is needed for TWBP. The CDS needs to be performed at every dispatch period to decide generation power of scheduling generators and amounts of scheduling load. Therefore, the CDS is not based on real generation costs but on bidding data of market participants with some constraints such as power balance, generation limits, ancillary service, and transmission line limits. This paper selects linear programming(LP) as an optimization tool for the CDS and presents effective formulae for the LP application. This paper also presents the way of minimizing the number of variables and constraints of the LP to improve real-time applicability.

한국형 Market Simulator(PEXSIM) 개발(III) (Development of Korean Market Simulator(PEXSIM)(III))

  • 허진;강동주;정해성;이정호;문영환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.47-49
    • /
    • 2003
  • At present, the Korean electricity industry is undergoing restructuring and the CBP market is being operated preparing for TWBP market open. As the circumstance of the traditional system is changed according to power system deregulation the unique market simulator is needed to analyze and study an electricity market. In this paper, we implement the main two modules of unique market simulator(PEXSIM) and introduce the characteristics of PEXSIM focused on the M-SIM and P-SIM.

  • PDF

Development of an Integrated Power Market Simulator for the Korean Electricity Market

  • Hur Jin;Kang Dong-Joo;Moon Young-Hwan
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권4호
    • /
    • pp.416-424
    • /
    • 2005
  • At present, the Korean electricity industry is undergoing restructuring and the Cost Based-generation Pool (CBP) market is being operated in preparation of a Two Way Bidding Pool (TWBP) market. In deregulated electricity industries, an integrated power market simulator is one of the tools that can be used by market participants and market operators analyzing market behaviors and studying market structures and market codes. In this regard, it is very important to develop an electricity market simulator that reflects market code providing a market operation mechanism. This paper presents the development of an integrated market simulator, called the Power Exchange Simulator (PEXSIM), which is designed to imitate the Korean electricity market considering the various features of the market operating mechanism such as uniform price and constrained on/off payment. The PEXSIM is developed in VB.NET and composed of five modules whose titles are M-SIM, P-SIM, O-SIM, T-SIM and G-SIM interfacing the Access database program. To verify the features and the performance of the PEXSIM, a small Two Way bidding market with a 12-bus system and a One Way bidding market for generator competition will be presented for the electricity market simulations using PEXSIM.

무연탄 발전소에 대한 기반기금 지원효과분석 및 향후 지원정책방향 (Supporting policy and impact analysis of electricity fund for local coal generators)

  • 조인승;이창호;김창수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.676-678
    • /
    • 2003
  • The present support for local coal generator amounts to above 100 billion won every year by electricity fund collected from general consumer. This paper presents the appropriate supporting policy for local coal generator in TWBP market in the future.

  • PDF