• Title/Summary/Keyword: TRUTEC

Search Result 1, Processing Time 0.014 seconds

Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building (트루텍 빌딩의 3차원 입체 커튼월 시공)

  • Park, Choel;Hong, Doo-Pyo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.119-122
    • /
    • 2007
  • TRUTEC building, which is located at DMC B block is zone, is just one the office building in Soeul. TRUTEC building is designed by Barkow Leibinger Architeken in Germany, has 5 stories under and 12 stories above and has been finished with the unique three dimensional curtain wall unit. Big trial to make unique elevation succeeded as getting rid of the typical plain curtain wall unit. In addition, aluminum bars are treated by the latest CNC machine in order to achieve 3D section. Construction of curtain wall is highly focused from the moment of contract to keep the schedule because the contract period is 18 months. Regular design meeting and technical meeting between stakeholders including construction manager, designer, engineer, consultant and so on have been held during the construction to minimize the risks from the unique elevation and trial. Step by step mock-up test (design mock-up and visual mock-up on site) has been performed before functional mock-up test.

  • PDF