• Title/Summary/Keyword: T-N removal efficiency

Search Result 326, Processing Time 0.027 seconds

Biological Removal Characteristics by the Internal Recycle Rate in the Attached Growth Process (부착증식공정에서 내부 반송율 변화에 따른 생물학적 제거 특성)

  • 박충기;김병욱;임재명
    • Journal of environmental and Sanitary engineering
    • /
    • v.14 no.4
    • /
    • pp.110-116
    • /
    • 1999
  • This study was conducted to investigate the contaminants removal efficiency and the optimal operating parameters by the internal recycle rate (IRR) in the combining A2/O process with fixed film. The average removal efficiency of BOD and COD was 92.5%~94.6%, 73.9%~87.0% in RUN 1 and 91.9%~94.7%, 77.7%~89.0% in RUN 2, respectively. Organic removal efficiency, at two different hydraulic retention time of 10 and 14hr, was similar. At 50% of the internal recycle rate, organic removal efficiency was somewhat higher than the other. Total nitrogen (T-N) and total phosphorus (T-P) were removed, highly, at 50% of internal recycle rate. It could be suggested by this study that the optimum internal recycle rate is 50% and hydraulic retention time is 14hr.

  • PDF

Simultaneous Nitrification and Denitrification using Submerged MBR packed with Granular Sulfur and Non-woven Fabric (부직포 및 황 충진 MBR을 이용한 포기조내 동시 질산화/탈질에 관한 연구)

  • Moon, Jin-Young;Hwang, Yong-Woo;Park, Ji-Hyoung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.4
    • /
    • pp.439-446
    • /
    • 2009
  • This study was performed to evaluate SND(simultaneous nitrification and denitrification)efficiency, nitrogen removal efficiency and filtration function of non-woven fabric by using submerging MBR packed with granular sulfur covered with non-woven fabric filter. Synthetic wastewater was used as influent wastewater. Concentration of $NH_4{^+}-N$ in influent was maintained about 40 mg/L and the experiment was performed in four phases according to the flow rate. Nitrogen loading rate divided four phases ranging from $0.04 kg\;NH_4{^+}-N/m^3-day$ to $0.16 kg\;NH_4{^+}-N/m^3-day$. As a result, the maximum $NH_4{^+}-N$ removal rate was accomplished at $0.142 kg\;NH_4{^+}-N/m^3-day$ in nitrogen loading of $0.147 kg\;NH_4{^+}-N/m^3-day$. Nitrification efficiency was higher than 95% in all phases. $NO_3{^-}-N$ loading rate was adjusted ranging from $0.22 kg\;NO_3{^-}-N/m^3-day$ to $0.89 kg\;NO_3{^-}-N/m^3-day$. The maximum $NO_3{^-}-N$ removal rate was accomplished up to $0.71 kg\;NO_3{^-}-N/m^3-day$ in $NO_3{^-}-N$ loading of $0.89 kg\;NO_3{^-}-N/m^3-day$. The maximum $NO_3{^-}-N$ removal efficiency was 95% in $NO_3{^-}-N$ loading of $0.22 kg\;NO_3{^-}-N/m^3-day$. T-N removal rate was 90% and concentration of T-N in effluent was 3.7 mg/L in T-N loading rate of $0.039 kg\;NO_3{^-}-N/m^3-day$. In this study, TMP in reactor with and without non-woven fabric filter were observed to define fouling of hollow-fiber membrane module. Reaching time to standard washing pressure(22 cm Hg) of two reactors were 29 days with non-woven fabric But the reactor without non-woven fabric reached standard washing pressure only after 4 days. Accordingly, non-woven fabric was demonstrated the superiority as a filtration ability. With high nitrogen removal rate and decreasing of fouling of membrane, MBR packed with granular sulfur covered with non-woven fabric filter submerging in activated sludge aeration tank can be used as an advanced treatment process.

Removal Efficiency of Non-point Source Pollutants through Constructed Wetland: Case Study of Annaecheon Wetland in Daecheong Reservoir (인공습지를 이용한 호소 유입 비점오염물질 제거 효율 평가: 대청호 안내천 습지 사례 분석)

  • Pyeol-Nim Park;Young-Cheol Cho
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.5
    • /
    • pp.291-304
    • /
    • 2023
  • Harmful algal blooms (HABs) have become an increasing concern in terms of human health risks as well as aesthetic impairment due to their toxicity. The reduction of water pollutants, especially nutrients from non-point sources in a reservoir watershed, is fundamental for HABs prevention. We investigated the pollutant removal efficiencies of a constructed wetland to evaluate its feasibility as a method for controlling non-point sources located in the Annaecheon stream within the Daecheong Reservoir watershed. The overall removal efficiencies of pollutants were as follows: BOD 14.3%, COD 17.9%, SS 50.0%, T-N 19.0%, and T-P 35.4%. These results indicate that constructed wetlands are effective in controlling pollutants from non-point sources. The seasonal variation in removal efficiency depended on the specific pollutants. The removal efficiencies of BOD, COD, and T-N were stable throughout the year, except during winter, which might have been influenced by lower microorganism activity. In contrast, T-P showed a consistent removal efficiency even during the winter season, suggesting that the wetland can reduce external phosphorus loading to the reservoir. Regarding the effects of pollutant loadings on removal efficiency, the effluent concentrations of all pollutants were significantly decreased compared to those in the influent in case of middle and high loadings. This demonstrates that constructed wetlands can handle high pollutant loads, including the initial runoff during rainfall, to prevent reservoir eutrophication. Despite the various strengths of wetland water purification, there are limitations as passive treatment. Therefore, more case studies should be conducted to suggest optimum operational conditions for constructed wetlands, taking into consideration reservoir-specific characteristics.

Change in Influent Concentration of Domestic Wastewater from Separated Sewer and Biological Nitrogen and Phosphorus Removal of a Full Scale Air-vent SBR (분류식 하수관거로의 전환시 유입하수의 성상 변화 및 선회와류식 SBR공법의 처리 특성)

  • Lee, Jang-Hee;Kang, Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.63-70
    • /
    • 2012
  • This study was carried out to investigate change in influent concentration of domestic wastewater flowed from a newly constructed separate sewer system (SSS) and biological nutrients removal efficiency of a full scale Air-vent sequential batch reactor (SBR, $600m^3/d$). The average concentration of $BOD_5$, SS, T-N and T-P from SSS were 246.5 mg/L, 231.6 mg/L, 42.974 mg/L, 5.360 mg/L, respectively which corresponds to 2.2times, 1.2times, 1.8times and 2.1times higher than those from the conventional combined sewer system (CSS). The removal efficiency of $BOD_5$, SS, T-N, and T-P for the Air-vent SBR operated with influent from SSS averaged 99.1%, 99.0%, 91.2%, and 93.5%, respectively. Especially the respective nitrogen and phosphorus removal was 15% greater than that of the SBR operated with influent from CSS. Simultaneous nitrification and denitrification (SND) was observed in an aerobic reactor(II) as a result of DO concentration gradient developed along the depth by the Air-vent system. In order to achieve T-N removal greater than 90%, the C/N ratio should be over 6.0 and the difference between $BOD_5$ loading and nitrogen loading rate be over 100 kg/day (0.130 kg $T-N/m^3{\cdot}d$). Even with high influent T-P concentration of 5.360 mg/L from SSS (compared with 2.465 mg/L from CSS) T-P removal achieved 93.5% which was 15.5% higher than that of the SBR with influent from CSS. This is probably due to high influent $BOD_5$ concentration from SSS that could provide soluble carbon source to release phosphorus at anaerobic condition. In order to achieve T-P removal greater than 90%, the difference between $BOD_5$ loading and phosphorus loading rate should be over 100 kg /day (0.130 kg $T-N/m^3{\cdot}d$).

Vertical Flow Zeolite-Filled Reed Bed for Treatment of Artificial Sewage with Intermittent Feeding (수직 흐름 제올라이트 갈대 여과상의 간헐적 주입에 의한 인공하수 처리)

  • 서정윤;김태형;최민수
    • KSBB Journal
    • /
    • v.18 no.2
    • /
    • pp.140-144
    • /
    • 2003
  • The artificial sewage was treated using a vertical flow zeolite-filled reed bed. The artificial sewage was fec into the reed bed for 10 minutes every 6 hours at the hydraulic load 314 L/$m^2$ \ulcorner day. The filtering height of the reed bed was 100 cm and the zeolite mixture was filled in the reed bed. The mixture consisted of the same volume of two types of zeolites ; 0.5~1 mm and 1~3 mm in diameter. Annual average removal efficiency was CO$D_{Cr}$ 95.1%, T-N 49.5%, $NH{_4^+}$-N 99.4% and T-9 56.4%. T-N removal efficiency decreaced remarkably from 73 to 27% with the operating time. Most of T-P was adsorbed in the uper area of the reed bed. The major portion of adsorbed phosphorus was composed of Fe-, Ca- and reductant selubele Fe-P.

A Study on the Combined Treatment of Municipal Solid Waste Landfill Leachate (도시폐기물매립지침출수의 병합처리에 관한 연구)

  • 김동민;이병인
    • Journal of environmental and Sanitary engineering
    • /
    • v.11 no.1
    • /
    • pp.45-55
    • /
    • 1996
  • An experimental research was conducted in order to study the combined treatment o of municipal landfill leachate and municipal sewage. The landfill leachate was that of Nanjido landfill site, and the municipal sewage was that of Chungnang municipal sewage treatment plant in Seoul. Several sets of bench~scale sequencing batch reactor(SBR) were used as e experimental apparatus. Specially investigated items in this experiment were the removal efficiency of substrate and the influence of treatment time. The experiment lasted for about 2 years. The result are as follows ; 1. The characteristics of leachate were pH 7.5~8.2, BOD 80~336mg/L, COD 908~1,460mg/L, NH3-N 1,409~2,330mg/L, T~P 2.7~7.lmg/L, Cl~3,540~4,085mg/L, a and heavy metals are a very small amount. And the characteristics of sewage were pH 6.9~7.3, BOD 78.4~129.3mg/L, COD 121.2~305.0mg/L, T~N 14.9~36.4mg/L, T-P 2.3~8.9mg/L. 2. The treatability of leachate alone was not treat well. So for the good treatment of leachate, it was necessary to deal with the pretreatment before bi이ogical treatment and a combined treatment of municipal sewage. 3. The various contents of the leachate were 5%, 10%, 30%, and 50%, and the removal efficiency of COD was 86.0%, 82.8%, 60.6%, and 31.7%. The maximum content of the leachate which could be sucessfully treated by SBR in the combined treatment was 10% of that of sewage. And the removal efficiency of COD increased n notably, as its treatment time increased. 4. The various contents of the electrolytic treated leachate were 5%, 10%, 30%, and 50%, and the removal efficiency of COD was 89.9%, 86.1%, 79.2%, and 69.8%. The maximum content of the leachate which could be sucessfully treated by SBR in the combined treatment was 30 % of that of sewage. And the removal efficiency of C COD increased notably, as its treatment time increased.

  • PDF

Effect of Loading Rate in the Operation of DEPHANOX and Modified-DEPHANOX Processes (유입부하가 DEPHANOX 및 Modified-DEPHANOX 공정에 미치는 영향)

  • Ryu, Hong-Duck;Min, Kyung-Kook;Lee, Sang-Ill
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.1
    • /
    • pp.24-31
    • /
    • 2004
  • This study was initiated to evaluate the efficiencies of DEPHANOX and Modified-DEPHANOX, which were devoloped to enhance nitrogen removal efficiency in municipal wastewater treatment. In the results, removal efficiency of organic matters was not affected much by increased loading rate of organic matters which is contained in influent. The nitrogen removal efficiencies according to the loading rate of influent TN was decreased drastically in conditions of over $0.2kg/m^3{\cdot}day$, which is T-N loading rate, and the DEPHANOX process was affected more sensitively than the M-DEPHANOX was. When the temperature was altered from $25^{\circ}C$ to $16^{\circ}C$ at HRT 6hrs, the removal efficiency of ammonia nitrogen was still over 90% and it was concluded that both DEPHANOX and M-DEPHANOX were strong enough to endure temperature variation. Moreover, both processes showed over 90% in ammonia removal efficiencies in over HRT 5hrs, so it was concluded that they were strong in HRT variation. M-DEPHANOX process showed a higher value than DEPHANOX did in T-N removal efficiency to the extent of 4~21 %, which resulted from differency of denitrification rates and the biosorption efficiency of organic matter in both processes. In the condition of HRT less than 4hrs, concentrations of ammonia nitrogen contained in effluents and nitrification reactors, might be sensitively affected by biosorption efficiency of organic matters in first separation tank. In the effect of effluent nitrate concentration in phosphorus removal, the more effluent nitrate concentration was decreased, the more phosphorus removal efficiency was increased. This result is related to the decrease of concentration of effluent nitrate which resulted from nitrification inhibition by decreased HRT.

A Study on the Optimal Operating Conditions for Removal of Nutrient Influential Substances Using Functional Media (기능성 여재를 활용한 부영양화 영양물질 제거의 최적 운전조건 연구)

  • Lee, Jong-Jun;Oh, Jong-Min;Choi, Seung-Jong;Kim, Ki-Jung
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.6
    • /
    • pp.549-555
    • /
    • 2019
  • The purpose of this study is to ensure optimal operating conditions for improving the removal efficiency of phosphorus (P) and nitrogen (N) that are the causative agents of eutrophication by utilizing functional media. The main ingredients of the functional media used in this study are Si, Al, and Fe, SiO2, KAlSiO3O8, Al2O2·2SiO2O, H3Al2Si2O9, Fe3O4O), and berylite. To identify the maximum efficiency of the filtration process, the processing efficiency experiment was carried out according to flow method, velocity, and thickness of residual media. The flow method carried out two experiments, 50 m/day, 100 m/day, 150 m/day, 200 m/day, 250 m/day, and 20 cm, 40 cm, 50 cm, 60 cm, 80 cm of lead depth. Experiments have shown that SS, T-N, and T-P all showed higher elimination efficiency of the upflow current conditions than the downflow current conditions, and that the processing efficiency of the linearity is the highest at SS 50 m/day, T-N 150 m/day and T-P 100 m/day. In addition, the analysis of the removal efficiency according to the residual thickness showed that SS, T-N, and T-P all showed the highest efficiency at 60 cm. In addition, the analysis of the removal efficiency according to the residual thickness showed that SS, T-N, and T-P all showed the highest efficiency at 60 cm. It is considered desirable to set the top-down flow conditions and residual thickness of 60 cm and adjust the velocity of the line according to the target media for removal.

Advanced Sewage Treatment by the Modified SBR(Sequencing Batch Reactor) Process (변형 연속회분식 반응기를 이용한 오수의 고도처리)

  • 김병군;서인석;홍성택;정위득
    • Journal of environmental and Sanitary engineering
    • /
    • v.17 no.3
    • /
    • pp.46-51
    • /
    • 2002
  • This study was performed to treat a sewage at the upper stream of dam using modified sequencing batch reactor, During the operating period, average $COD_{cr}$, removal efficiency was about 85% but average T-N and ${PO_4}^{3-}-P$ removal efficiencies were 43% and 30% respectively. Because the organic matter was very low compared with nitrogen and phosphorous in influent($BOD_{5}/{NH_4}^{+}-N{\;}={\;}2,{\;}BOD_{5}/{PO_4}^{3-}-P{\;}={\;}15.6$), nitrogen and phosphorus removal efficiency was relatively low. Average nitrogen removal efficiency was 50 % at $10^{\circ}C$ or above and it was 36 % at $10^{\circ}C$ or below. As reactor was located in outdoor without any thermostat, temperature decreased at least $2.4^{\circ}C$ in the winter season. Therefore, if we would apply this modified sequencing batch reactor to sewage which concentration of organic matter was very low compared with nitrogen and phosphorous, we have to addition of external carbon and installation of any thermostat.

Development of a Zero Discharge and Reuse System for Rural Areas (농촌지역을 위한 무방류 재이용시스템 개발)

  • Hong, Min;Choi, Kyung-Sook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.91-96
    • /
    • 2009
  • This study describes a zero discharge and reuse system developed for rural areas. The purpose of the system is decontamination of used irrigation water for down-stream usage and reuse of wastewater in rural villages for preventing water shortage problem expected to happen in near future. The system consists of anoxic, FES (Ferrous Electricity System), Oxic, Cralifier processes. The main feature of the system is to remove phosphorous by using Fe-ionizing module. Indoor experiments were undertaken with a trial product of the system to test its performance. The removal capacities of T-P, T-N, and BOD were examined. Also the proper time for the replacement of iron plate module was tested as well as the efficiency of T-P removal rate based on the usage of an automatic washing system for the iron plate. As results, the system showed very good water purification performances through obtaining the results of over 90% removal rates from T-P, BOD, and 67% from T-N. The proper time period for replacement of iron plate was maximum 2 years, and also efficiency of T-P removal rate found to be greatly influenced by the usage of an automatic washing system from the test.