The two major tannins were separated by Sephadex LH-20 and MCI-gel CHP-20 from peel of astringent persimmon fruits. Purified tannins were identified to (+)-catechin and (+)-gallocatechin by NMR, IR spectrum and FAB-mass spectrum. The removal rate of turbidity, T-N, T-P and CODcr in wastewater with lime and (+)-gallocatechin was higher than those of (+)-catechin because (+)-gallocatechin has more hydroxyl groups. As increasing concentration of tannins from peel of astringent persimmon fruits, the removal rate of turbidity, T-N, T-P and CODcr were increased. Synergistic activity by mixed tannins(catechin+gallocatechin) was also observed.
An evaluation of the application of SBR and biofilm en small sewerage system was conducted. A newly developed small sewerage system, using SBR, was successfully applied to the nutrient treatment using municipal wastewater. The system was consisted of 6 compartments. Two systems, with SBR (A type) or without SBR (B type), were compared by several parameters (COD, SS, T-N, NH$_4$$\^$+/-N, NO$_3$$\^$-/-N, NO$_2$$\^$ -/-N, alkalinity, pH, DO) in all experimental periods. Also, the time variation of several parameters (DO, pH, NH$_4$$\^$+/-N, NO$_3$$\^$-/-N NO$_2$$\^$-/-N) was examined in a SBR applied sewerage system. T-N removal efficiency of B type Was higher than that Of A type by the effect of nitrification and denitrification even though the COD removal efficiencies were similar. In aeration stage, the pH was decreased from 6.4 to 6.3 within 1 h and increased to 6.65 at the end of aerobic stage, and pH was decreased to 6.2 in non-aeration stage, and these phenomena were explained. The effects of nitrification and denitrification were compared in A type and B type sewerage system, and the typical nitrification and denitrification were observed in B type sewerage system.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.2
/
pp.970-976
/
2013
An evaluation of the organic matter removal efficiency showed high removal efficiencies of 91.1~96.3% and 91.4~97.5% for TCODcr and TBOD5, respectively, for 9hr or longer of HRT. However, the removal efficiencies decreased to 86.9~90.5% and 88.0~90.9%, respectively for 6hr of HRT. $NH_3$-N showed a high removal efficiency of 95% or higher for 9hr or longer of HRT. The total nitrogen removal efficiency was 67.6~76.7% for 9~12hr of HRT, and it decreased to 50% for 6hr of HRT, which seems to be due to the insufficient carbon source required for denitrification. The T-P removal efficiency was 32% on average. To comply with the legal standards, a chemical phosphorus removal process is needed after the reactor.
The aim of this study was to evaluate on the removal effect of total nitrogen and phosphorus in municipal wastewater with temperature change from 1$0^{\circ}C$ to 24$^{\circ}C$ in CNR(Cilia Nutrient Removal) process. CNR process is the process combining $A^2$/O process with cilium media of H2L company. The removal efficiencies for T-N were found to be 57.9% at 1$0^{\circ}C$ below, 53.7% at 10-2$0^{\circ}C$, 52.2%at 20-24$^{\circ}C$ and 44.4% over 24$^{\circ}C$ respectively. The removal efficiencies for T-P were 53.3% at 1$0^{\circ}C$ below, 59.1% at 10-2$0^{\circ}C$, 72.4% at 20-24$^{\circ}C$ and 50.0% over 24$^{\circ}C$ respectively. The specific nitrification rate (kg NH$_3$-N/kg MLSS.d) of Oxic basin was 0.088 and 0.053 at 1$0^{\circ}C$ below, 0.077 at 10-2$0^{\circ}C$, 0.097 at 20-24$^{\circ}C$ and 0.088 over 24$^{\circ}C$ respectively. The specific denitrification rate (kg NH$_3$-N/kg MLSS.d) in anaerobic and anoxic was 0.013, 0.008 respectively.
This study was carried out to investigate the removal of nitrogen and phosphorus in municipal sewage depending on existence of biological coated media in BCM reactor. The reactor with biological coated media is the process combining $A_2/O$ process. The removal efficiencies for $COD_{Mn},\; BOD_5,\;SS$, T-N and T-P were $78\%,\;90.5\%,\;92.3\%,\;61.9\%,\;60.2\%$, respectively. The specific nitrification rate$(mgNO_3-N/gMLSS{\cdot}d)$ of Contact aeration basin was 52.2 and the specific denitrification rate$(mgNO_3N/gMLSS{\cdot}d)$ in anoxic basin was 95.1. Also, phosphorus release$(mgPO_4-P/gMLSS{\cdot}d)$ in Anaerobic basin was 71.8 and Phosphorus uptake$(mgPO_4-P/gMLSS{\cdot}d)$ in contact aeration was 27.1.
This paper describe the working of algal culture system under batch and continuous feeding effluents in biological treatment process. The main objective of this study was the determination of fundamental opeating parameters such as dilution rates, light intensity, biomass concentration, nutrients contents, which engender an effective nutrient and organic waste removal process.
The results of this research indicate that the algae system will remove effectively nutrient and organic waste. In batch cultures, 91.8% dissolved orthophosphate and 83.3% ammonia nitrogen were removed from the sewage in ten days. In continuous flow systems, a detention time of 2.5 days was found adequate to remove 91% T-P, 87% T-N and 95% $NH_3-N$. At 22-28$^{\circ}C$, 60 rpm, with an intensity of 3500 Lux, the specific growth rate, k was 0.59/day in batch experiments. The optimal growth temperature and nutrients rate (N/P) were respectively $25^{\circ}C$ and 3~5. With an abundant supply of untrients, it was possible to sustain substantial population densities in the temperature range of 22~28$^{\circ}C$.
Proceedings of the Korean Society for Agricultural Machinery Conference
/
1993.10a
/
pp.1379-1394
/
1993
The purpose of this study is to examine the purification efficiency of the septic tank method which has been applied by the most of Korean livestock farms, in terms of anaerobic and aerobic treatment. Except several days in summer, BOD of effluent shows 1,500 -3,000 ppm by anaerobic process. In most cases , it exceeds according to the seasons show an increase by decrease of temperature. The removal effect on T-N is hardly found. The suspended solids contents of effluent are reduced to the level of 50-90%. Although BOD contents of effluent are kept high in the beginning, the removal rate of BOD shows 80 percent in the latter half by the aerobic treatment . The removal efficiency of total nitrogen does not appear through the experimental period, but the contents of T-N are not increased in the aerobic process unlike in the anaerobic process. The total phosphorous contents in effluent keep a constant level of 14 mg/L in average. The removal rate of phosphorous shows 91 percent i the last stage.
The treatment of the washout from small scale incinerator was performed physically, chemically and biologically. The results are as follows. 1. SS, FS removal efficiency of washout wastewater from incinerator was 67.4%, 37.4%, while SS, FS of sewage wastewater was removed 63.2% 35.4% respectively. 2. The optimal conditions for chemical coagulation turned out to be pH 7.5, alum(Al2O3 10%) 30ml/ι and polyelectrolyte(A-601P 0.1%) 4ml/ι. SS 86%, FS 89.5%, BOD 42.5% and CODMn, 63.5% was removed and the removal efficiency of some metals are shown as Pb 93.5%, Zn 86.5% and Fe 80.6%. The concentration of the effluent was SS 9mg/ι, BOD 98.4mg/ι, and CODMn 138.4mg/ι. 3. The removal efficiency in treating washout wastewater of incinerator through HBC-briquet media was getting higher with increasing HRT, and mixed wastewater with 1:1, 1:2 ratio could be met up to the standard limit with higher HRT than 12hr. Under the condition of 1:2 mix ratio and HRT 24 hr, removal efficiency of SS, BOD, CODMn, T-N and T-P was 92.1%, 90%, 87%, 48.2% and 48%, respectively, and the concentration of treated wastewater was SS 2.9 mg/ι, BOD 10.3mg/ι, CODMn 14.1mg/ι, T-N 11.6 mg/ι and T-P 1.3 mg/ι, respectively.
The effects of HRT and effluent time on removals of pollutants in the electrochemical pilot were investigated. COD removal after 8 hour electrochemical reaction time in HRT 30 and 60 minutes were higher than that of 15 minute HRT. Turbidity removal was 90% or greater regardless of conditions during effluent time. Removals of T-N and T-P during effluent time in HRT 30 and 60 minutes were $71{\sim}74%$ and $85{\sim}98%$, respectively. To evaluate the combination of activated sludge process and continuous electrochemical as pretreatment, the removal efficiencies of pollutants was investigated. In two treatment processes of a single activated sludge system and a electrolysis pilot plus activated sludge systems, SVI and MLSS during effluent time were kept with $82{\sim}112$ and $1,230{\sim}1,750$ mg/L, respectively. COD removal was approximately 90% at early effluent time for both treatment systems, but COD removal in a single activated sludge was slightly decreased as effluent time went by, compared with the single activated sludge COD removal was slightly increased in the early stage of the electrolysis plus activated sludge system. Turbidity removal during effluent time was higher than 95% for both treatment systems. T-N removals during effluent time in a single activated sludge system and a electrolysis pilot plus activated sludge systems were $62{\sim}74%$ and $72{\sim}86%$, respectively. T-P removal in a electrolysis pilot plus activated sludge systems was increased by 9% at early effluent time and 15% after 72 hours of effluent time in compared with a single activated sludge system.
In this study, we investigated the buffering effect with different COD, $NH_4{^+}-N$ and TP shock loads on the performance of lab-scale Sequencing Batch Reactor(SBR) using synthetic wastewater. This study was operated under the following conditions : HRT, 12 hrs : MLSS, 2,000 mg/L : F/M ratio, $0.2kgCOD/kgMLSS{\cdot}d$ : SRT, 20days, and was increased by a factor, COD : ranging from 200-2000 mg/L, $NH_4{^+}-N$ : ranging from 30-300 mg/L, T-P : ranging from 5-50 mg/L in the reactor. As results, COD removal rate at different shock loads was decreased until 42.1%(stable state : 95%) and concentration with effluent was higher than 695 mg/L(at Run 6). In case of $NH_4{^+}-N$ removal rate was decreased until 35.8% from 97.0% and also T-P removal rate was decreased until 5.0%. Effluent concentrations of COD, $NH_4{^+}-N$ and T-P were rapidly increased according to shock loads and needed 3, 4 and 6 additional cycle times for recovering the stable condition.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.