• Title/Summary/Keyword: System performance test

Search Result 7,452, Processing Time 0.045 seconds

Testing Items Change on Characteristics of Protective relays (보호계전기 특성시험기술의 시험항목 변화)

  • Jang, Byung-Tae;Lee, Nam-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.161-162
    • /
    • 2008
  • The steady state performance test for the digital protective relay using general relay test equipment has been main test methods. Because of the development of advanced power system testing equipments, dynamic performance test has been carried out additionally using a digital simulator such as RTDS(Real Time Digital Simulator). For the case of newly adopted digital protective relay with IEC 61850 and network, performance testing items need supplementing. This report displays testing items change according to newly protective relay.

  • PDF

Performance of Local Exhaust Ventilation Systems of Degreasing and Plating Workplaces (일부 탈지세척 및 도금공정 국소배기장치의 성능점검과 개선방안)

  • Han, Don-Hee
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.8 no.2
    • /
    • pp.178-185
    • /
    • 1998
  • In order to evaluate and improve the performance of local exhaust ventilation systems for two TCE degreasing (A, B) and two electroplating (C, E) and one acid dipping & plating (D) operations located in Kimhae, the performance test was conducted with trace gases and a thermal anemometer (Kanomax 24-6111, Japan). For the inadequately designed systems, the improvement and redesigns in compliance with recommendation by ACGIH was suggested. The results of performance test for each system are as follows; 1. System of Workplace A was generally well-designed. Actual exhaust air flow rate was in excess of 68% above the recommended standard exhaust air flow rate. 2. System of Workplace B was very well-designed and completely enclosed. 3. All systems of Workplace C including hoods were poorly-designed and actual exhaust air flow rates were insufficient for open tanks. All systems should be upgraded according to ACGIH recommendations. 4. Supply and exhaust air flow rate of push-pull exhaust systems in Workplace D should be greatly increased. The width of flange of dipping tank hood should be increased with the value suggested. 5. System of Workplace E was well-designed. Actual exhaust air flow rate was in excess of 54% above the required.

  • PDF

MSBS-SPR Integrated System Allowing Wider Controllable Range for Effective Wind Tunnel Test

  • Sung, Yeol-Hun;Lee, Dong-Kyu;Han, Jong-Seob;Kim, Ho-Young;Han, Jae-Hung
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.18 no.3
    • /
    • pp.414-424
    • /
    • 2017
  • This paper introduces an experimental device which can measure accurate aerodynamic forces without support interference in wide experimental region for wind tunnel test of micro aerial vehicles (MAVs). A stereo pattern recognition (SPR) method was introduced to a magnetic suspension and balance system (MSBS), which can eliminate support interference by levitating the experimental model, to establish wider experimental region; thereby MSBS-SPR integrated system was developed. The SPR method is non-contact, highly accurate three-dimensional position measurement method providing wide measurement range. To evaluate the system performance, a series of performance evaluations including SPR system measurement accuracy and 6 degrees of freedom (DOFs) position/attitude control of the MAV model were conducted. This newly developed system could control the MAV model rapidly and accurately within almost 60mm for translational DOFs and 40deg for rotational DOFs inside of $300{\times}300mm$ test section. In addition, a static wind tunnel test was conducted to verify the aerodynamic force measurement capability. It turned out that this system could accurately measure the aerodynamic forces in low Reynolds number, even for the weak forces which were hard to measure using typical balance system, without making any mechanical contact with the MAV model.

Development of Life Test Equipment with Real Time Monitoring System for Butterfly Valves

  • Lee, Gi-Chun;Choi, Byung-Oh;Lee, Young-Bum;Park, Jong-Won;Nam, Tae-Yeon;Song, Keun-Won
    • International Journal of Fluid Machinery and Systems
    • /
    • v.10 no.1
    • /
    • pp.40-46
    • /
    • 2017
  • Small valves including ball valves, gate valves and butterfly valves have been adopted in the fields of steam power generation, petrochemical industry, carriers, and oil tankers. Butterfly valves have normally been applied to fields where in narrow places installing the existing valves such as gate valves and ball valves have proven difficult due to the surrounding area and the heavier of these valves. Butterfly valves are used to control the mass flow of the piping system under low pressure by rotating the circular disk installed inside. The butterfly valve is benefitted by having simpler structure in which the flow is controlled by rotating the disc circular plate along the center axis, whereas the weight of the valve is light compared to the gate valve and ball valve above-mentioned, as there is no additional bracket supporting the valve body. The manufacturing company needs to acquire the performance and life test equipment, in the case of adopting the improving factors to detect leakage and damage on the seat of the valve disc. However, small companies, which are manufacturing the industrial valves, normally sell their products without the life test, which is the reliability test and environment test, because of financial and manpower problems. Furthermore, the failure mode analysis of the products failed in the field is likewise problematic as there is no system collecting the failure data on sites for analyzing the failures of valves. The analyzing and researching process is not arranged systematically because of the financial problem. Therefore this study firstly tried to obtain information about the failure data from the sites, analyzed the failure mode based on the field data collected from the customers, and then obtained field data using measuring equipment. Secondly, we designed and manufactured the performance and life test equipment which also have the real time monitoring system with the naked eye for the butterfly valves. The concept of this equipment can also be adopted by other valves, such as the ball valve, gate valve, and various others. It can be applied to variously sized valves, ranging from 25 mm to large sized valves exceeding 3000 mm. Finally, this study carries out the life test with square wave pressure, using performance and life test equipment. The performance found out that the failures from the real time monitoring system were good. The results of this study can be expanded to the other valves like ball valves, gate valves, and control valves to find out the failure mode using the real time monitoring system for durability and performance tests.

Cyclic Loading Test and an Analytical Evaluation of the Modular System with Bracket-typed Fully Restrained Moment Connections (브래킷형 완전강접합 모듈러 시스템의 반복가력실험과 해석적 평가)

  • Park, Jae-Seong;Kang, Chang-Hoon;Shon, Su-Deok;Lee, Seung-Jae
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.19-28
    • /
    • 2018
  • Key factors that ensure competitiveness of modular unit include consistent high quality and connection condition that ensures high structural performance while minimizing the overall scale of the on-site process. However, it is difficult to evaluate the structural performance of the connection of modular unit, and its structural analysis and design method can be different depending on the connection to its development, which affects the seismic performance of its final design. In particular, securing the seismic performance is the key to designing modular systems of mid-to-high-rise structure. In this paper, therefore, the seismic performance of the modular system with bracket-typed fully restrained moment connections according to stiffness and the shapes of various connection members was evaluated through experimental and analytical methods. To verify the seismic performance, a cyclic loading test of the connection joint of the proposed modular system was conducted. As a result of this study, theoretical values and experimental results were compared with the initial stiffness, hysteresis behavior and maximum bending moment of the modular system. Also, the connection joint was modeled, using the commercial program ANSYS, which was then followed by finite element analysis of the system. According to the results of the experiment, the maximum resisting force of the proposed connection exceeded the theoretical parameters, which indicated that a rigid joint structural performance could be secured. These results almost satisfied the criteria for connection bending strength of special moment frame listed on KBC2016.

A Study on Structural Integrity and Dynamic Characteristic of Inertial Load Test Equipment for Performance Test of Railway Vehicle Propulsion Control System (철도차량 추진제어장치 성능시험을 위한 관성부하 시험설비의 구조안전성 및 동특성 평가 연구)

  • Jang, Hyung-Jin;Shin, Kwang-Bok;Lee, Sang-Hoon;Lee, Dae-Bong
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.363-370
    • /
    • 2010
  • This paper describes the evaluation of structural integrity and dynamic characteristic of inertial load test equipments for performance test of railway vehicle propulsion control system. The propulsion control system of railway vehicle has to be confirmed of safety and reliability prior to its application. Therefore, inertial load test equipments were designed through theoretical equation for performance test of propulsion control system. The structural analysis of inertial load test equipments was conducted using Ansys v11.0 and the dynamic characteristic was evaluated using Adams. The results showed that the structural integrity of inertial load test equipment was satisfied with a safety factor of 10.2 on the bearing part under combined load. Also, the structural stability of flywheel according to dynamic simulation was secured by the maximum oscillation displacement within 0.83mm.

Construction of small hydropower facilities performance evaluation system (소수력 발전설비 성능평가 시스템 구축)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.193.2-193.2
    • /
    • 2010
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

Construction of small hydropower facilities performance evaluation system (소수력 발전설비 성능평가 시스템 구축)

  • Kim, Youngjoon;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.206.2-206.2
    • /
    • 2011
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

A Study on Constructing the Requirement Management System of the Performance Tests and Safety Standards of the High Speed Railway using Model-Based Systems Engineering Approach (모델기반 시스템엔지니어링 접근을 통한 고속철도 성능시험 및 안전기준 요구사항 관리체계 구축에 관한 연구)

  • Choi Yo-Chul;Park Young-Won;Wang Jong-Bae
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.330-334
    • /
    • 2006
  • To maintain design-knowledge database and manage configuration for requirement of performance tests and safety standards of High Speed Railway(HSR), It is established that management system of performance tests and safety standards and then constructed that design-knowledge database and documented a performance test and safety specifications for supporting performance test and safety system using Model-Based Systems Engineering(MBSE) tool.

Development of Isokinetic Exercise System and Examination of Its Performance (등속운동 훈련장치의 개발 및 이의 성능시험에 관한 연구)

  • 윤용산;조영돈
    • Journal of Biomedical Engineering Research
    • /
    • v.11 no.1
    • /
    • pp.39-46
    • /
    • 1990
  • An isokinetic exercise system was designed and manufactured to perform muscular performance test and the traning of athletes and the rehabilitation of patients. The system majorly consists of gear box, D. C servo motor and servo controller, data reduction computer. Preliminary experiments were conducted to find out the performance of the system. The performance of the prototype isokinetic exercise system was turned out to be satisfactory compared with a commercial product called CYBEX system.

  • PDF