• Title/Summary/Keyword: System Requirement

Search Result 3,342, Processing Time 0.032 seconds

Confirmation System of Feasibility of Train Position Through Tachometer and Balise (타코미터와 발리스를 통한 열차 위치 타당성 확인 시스템)

  • Oh, Kwi-Jin;Lee, Jin-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.472-475
    • /
    • 2009
  • Nowadays, Short headway is a requirement of Signaling System applied to subway and Light Rail Transit (LRT) being constructed in Korea. To satisfy this Systematic Requirement, the accuracy of train position information on the line is one of the main element to improve ATC system safety and performance. On-board ATC system performs feasibility of Train Position as comparing data from balise installed along the track with data from tachometer installed at both axles of train.

  • PDF

A Study on the methodology to develop Information System for Maintenance of Urban Transit (도시철도 유지보수 정보화시스템 개발방법론에 대한 연구)

  • 안태기;박기준;이호용;한석윤
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.574-579
    • /
    • 2002
  • This paper proposes the method to develop information system for maintenance of urban transit. We have to develop the standard information system, but have difficult to get user's requirement. To solve this problem, we propose the method, web-based, component-based, and prototype-based development method. Proposed method may provide a procedure to develop information system that have hard to get user's requirement.

  • PDF

Pretension process control based on cable force observation values for prestressed space grid structures

  • Zhou, Zhen;Meng, Shao-Ping;Wu, Jing
    • Structural Engineering and Mechanics
    • /
    • v.34 no.6
    • /
    • pp.739-753
    • /
    • 2010
  • Pointing to the design requirement of prestressed space grid structure being the target cable force, the pretension scheme decision analysis method is studied when there's great difference between structural actual state and the analytical model. Based on recursive formulation of cable forces, the simulative recursive system for pretension process is established from the systematic viewpoint, including four kinds of parameters, i.e., system initial value (structural initial state), system input value (tensioning control force scheme), system state parameters (influence matrix of cable forces), system output value (pretension accomplishment). The system controllability depends on the system state parameters. Based on cable force observation values, the influence matrix for system state parameters can be calculated, making the system controllable. Next, the pretension scheme decision method based on cable force observation values can be formed on the basis of iterative calculation for recursive system. In this way, the tensioning control force scheme that can meet the design requirement when next cyclic supplemental tension finished is obtained. Engineering example analysis results show that the proposed method in this paper can reduce a lot of cyclic tensioning work and meanwhile the design requirement can be met.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

A Study on the Effects of ISO 9001:2008 Quality Management Systems's Requirement Implementation According to the Certification Motives on Management Performance : Focused on the Manufacturer in the Small Businesses (ISO 9001:2008 품질경영시스템 인증동기에 따른 요구사항 실행이 경영성과에 미치는 영향에 관한 연구 : 중소기업 제조업체를 중심으로)

  • Kim, Yong-Jun;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.1-10
    • /
    • 2015
  • ISO 9001, quality management system, is widely known as advancing internal efficiency and productivity in various industry. As a result, the number of companies that have adopted ISO 9001's certification have been increasing continuously year by year since ISO 9000' family standard was published in 1987s. This fact shows that a lot of businesses are trying to get the accreditation for improving the competitiveness of quality. The purpose of this study is to present that ISO 9001's certification motives affect to the requirement's implementation and show that the execution of requirements influences on management performance in the small manufacturer. In order to carry out this research, we obtained 96 survey sheets and inspected twenty assumptions based on the reliability, validity of the questionnaires. The results of regression analysis are summarized as follows; First, the factors of certification motive influence on the requirement's implementation except resources management. Second, the two elements of ISO 9001 requirement, resources management and product realization, have an important effect on the operational performance and financial performance considerably in the companies that choose the internal motive. Finally, the two requisites of ISO 9001 requirement, resources management and measurement, analysis and improvement, affect to the operational performance and financial performance significantly in the businesses that select the external motive. Based on the results, the companies that choose the internal motive have a good performance to execute the ISO 9001 requirements. Also, to implement the requirements of ISO 9001 is helpful for the companies to produce the operational and financial performance.

Distance Relaying Algorithm for Intertie Protection of a Wind Farm Considering the Fault Ride-through Requirement (Fault ride-through 요구를 고려한 풍력발전단지 연계선 보호 거리계전 알고리즘)

  • Kang, Yong-Cheol;Kang, Hae-Gweon;Zheng, Tai-Ying;Kim, Yeon-Hee;Lee, Young-Gui
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1053-1058
    • /
    • 2010
  • A large modern wind farm should satisfy the requirements for a grid and accomplish the optimization of the wind farm system. The wind farm intertie protection system should consider a Fault Ride-Through (FRT) requirement for more reliable protection. The wind farm should keep connected to the grid in the case of a grid fault whilst it should be isolated for an intertie fault. This paper proposes a distance relaying algorithm suitable for wind farm intertie protection considering the FRT requirement. The proposed algorithm estimates the impedance based on a differential equation method because the frequency of the voltage and current deviates the nominal frequency. The algorithm extends the reach of Zone 1 up to 100 % of the length of the intertie to implement the FRT requirement. To discriminate an intertie fault from a grid fault, the algorithm uses a voltage blocking scheme because the magnitude of the voltage at the relaying point for an intertie fault becomes less than that for a grid fault. The performance of the algorithm is verified using a PSCAD/EMTDC simulator under various fault conditions. The algorithm can discriminate successfully the intertie fault from grid fault and thus helps to implement the FRT requirement of a wind farm.

Study on Reserve Requirement for Wind Power Penetration based on the Cost/Reliability Analysis

  • Shin, Je-Seok;Kim, Jin-O;Bae, In-Su
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.4
    • /
    • pp.1397-1405
    • /
    • 2017
  • As the introduction of wind power is steadily increasing, negative effects of wind power become more important. To operate a power system more reliable, the system operator needs to recognize the maximum required capacity of available generators for a certain period. For recognizing the maximum capacity, this paper proposes a methodology to determine an optimal reserve requirement considering wind power, for the certain period in the mid-term perspective. As wind speed is predicted earlier, the difference of the forecasted and the actual wind speed becomes greater. All possible forecast errors should be considered in determining optimal reserve, and they are represented explicitly by the proposed matrix form in this paper. In addition, impacts of the generator failure are also analyzed using the matrix form. Through three main stages which are the scheduling, contingency and evaluation stages, costs associated with power generation, reserve procurement and the usage, and the reliability cost are calculated. The optimal reserve requirement is determined so as to minimize the sum of these costs based on the cost/reliability analysis. In case study, it is performed to analyze the impact of wind power penetration on the reserve requirement, and how major factors affect it.

Ancillary Service Requirement Assessment Indices for the Load Frequency Control in a Restructured Power System with Redox Flow Batteries

  • Chandrasekar, K.;Paramasivam, B.;Chidambaram, I.A.
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.6
    • /
    • pp.1535-1547
    • /
    • 2016
  • This paper proposes various design procedures for computing Power System Ancillary Service Requirement Assessment Indices (PSASRAI) for a Two-Area Thermal Reheat Interconnected Power System (TATRIPS) in a restructured environment. In an interconnected power system, a sudden load perturbation in any area causes the deviation of frequencies of all the areas and also in the tie-line powers. This has to be corrected to ensure the generation and distribution of electric power companies to ensure good quality. A simple Proportional and Integral (PI) controllers have wide usages in controlling the Load Frequency Control (LFC) problems. So the design of the PI controller gains for the restructured power system are obtained using Bacterial Foraging Optimization (BFO) algorithm. From the simulation results, the PSASRAI are calculated based on the settling time and peak over shoot concept of control input deviations of each area for different possible transactions. These Indices are useful for system operator to prepare the power system restoration plans. Moreover, the LFC loop coordinated with Redox Flow Batteries (RFB) has greatly improved the dynamic response and it reduces the control input requirements and to ensure improved PSASRAI, thereby improving the system reliability.

A Study on the RF performance analysis for Multi-band Ultra Wide Band Systems (멀티밴드 UWB 시스템의 무선성능 분석에 관한 연구)

  • Choi, Seok;Kim, Gil-Gyeom;Kwack, Jun-Ho;Kim, Hak-Sun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.12A
    • /
    • pp.951-957
    • /
    • 2003
  • The analysis of RF performance requirement conditions on communication system is critical indicator to predict the performance of system. UWB(Ultra Wide Band) system which the standard is not established yet is difficult to derive the precise system performance requirement condition. Also, there are differences between conventional UWB system and multi-band system about RF performance requirement condition. In this thesis, the differences are analyzed and performance requirement conditions of multi-band UWB system are described on the basis of the differences. Throughput, maximum transmit power, and sensitivity of multi-band UWB system is varied with respect to the number of Sub-Bands. In addition, because of Multi-path effect, if PRF(Pulse Repetition Frequency) is changed, the Multi-path link margin is happened to compensate for Multi-path Energy Loss which is contributed by increasing of the Link Margin. According to Multi-path Margin, the variation of the resistance with respect to sensitivity and interference signal is observed and analyzed through the simulation.

A Study on DRM Model Using Electronic Cash System (전자화폐 시스템을 적용한 DRM 모델에 관한 연구)

  • Lee, Deok-Gyu;Oh, Hyung-Geun;Lee, Im-Yeong
    • Journal of Korea Multimedia Society
    • /
    • v.7 no.8
    • /
    • pp.1107-1119
    • /
    • 2004
  • There is Electronic-cash system as important payment means in Electronic-commerce and the requirement of electronic cash is independence, transferability, divisibility etc. This is important requirement in DRM to provide contents as a same requirement to contents. Because contents itself can see that requirement of Electronic-cash can be transferred the control of to contents requirement as monetary concept. Can apply equally in reproduction and copy for contents, anonymity user's access etc, and several relations. In this paper, wish to put by value that is equal about Electronic-cash and contents, and apply concept of Electronic-cash through this and present DRM model after examine requirement of Electronic-cash and DRM's requirement. Concept used in this paper left copy use authority to use hierarchic tree structure and endowed anonymity for contents and anonymity about user for anonymous user. Finally, examines and compares and analyzes proposed existing methods.

  • PDF