• Title/Summary/Keyword: System Recovery

Search Result 3,169, Processing Time 0.031 seconds

Recovery Technique using PLT in a Page-Server Object Oriented DBMS (페이지-서버 객체지향 DBMS에서의 PLT를 이용한 회복기법)

  • Cho, Sung-Je
    • The KIPS Transactions:PartD
    • /
    • v.9D no.6
    • /
    • pp.1097-1104
    • /
    • 2002
  • Recently, with a drop in memory chip price and rapid development of mass storage memory chip technology, research on client-server Database Management Systems has gained wide attention. This Paper discusses the recovery technique in a page-server OODBMS environment. Although most researchers have studied client-server systems, the recovery technique has been a poor researches. In this paper, client transfers only the completed log records to the server and resolves the problems in the current recovery techniques. In addition, the server manages only the execution of completed log records suggesting a simple recover algorithm, Client uses system concurrency, fully, by acting to abort actions and it suggests a page unit recovery technique to reduce time that is required in the whole database.

The Improvement of Translucent Cryptography (Translucent Cryptography의 취약점 개선)

  • 김종희;이필중
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.12C
    • /
    • pp.1276-1281
    • /
    • 2002
  • Bellare and Rivest proposed the translucent cryptography which was a kind of key recovery system. Translucent cryptography is a system in which the third party can recover encrypted message with the probability p(0$\leq$p$\leq$1). The key recovery agency doesn't need to store the user's private key in advance. The balance between key recovery agency and user can be controlled by the value of p. For example, if p is set to be 0.4 then the key recovery agency can recover 40 out of 100 encrypted messages. In this paper, we show that user can easily deceive the key recovery agency in the translucent cryptography. Then we propose the solution of this problem.

Design of the Efficient Clock Recovery Circuit in the Communication Systems using the Manchester Encoding Scheme (맨체스터 부호를 사용하는 통신시스템에서 효율적인 클럭복원 회로의 설계)

  • 오용선;김한종;강창언
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.16 no.10
    • /
    • pp.1001-1008
    • /
    • 1991
  • .In this paper the efficient clock recovery algorithm is proposed to regenerate the manchester code at the system using the Manchester encoding scheme such as LAN. Mobile communication and digital communication systems. The proposed clock recovery circuit recovers the clock using the two times of the same original transmitted frequency can be completely recovered. The implementation of the proposed clock recovery circuit and the interpretation of test results prove the validity of the proposed algorithm.

  • PDF

Characteristics on the Transformer-Type SFCL According to Reclosing Operation the Voltage Increase (전압증가 시 재폐로 동작에 따른 변압기형 초전도 한류기의 특성 분석)

  • Choi, Soo-Geun;Choi, Hyo-Sang
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.4
    • /
    • pp.477-480
    • /
    • 2010
  • Fault current in power system is expected to increase by demand of power capacity. Therefore, when the fault occurred, fault current was increased in the power system. Many studies have been progressed to limit the fault current. Superconducting fault current limiter (SFCL) is one of them which has been studied in worldwide. In this paper, we will analyze characteristics of a transformer-type SFCL by reclosing operation when the voltage increases. Twice opening times in the reclosing of circuit breaker were set as the 0.5 and 15 seconds, respectively. Turn's number of primary and secondary coils set 4:2 and we increased voltages from 120V to 280V for each experiment. By the current waveform, maximum fault current in second and third cycles was lowered when the voltage was increased. In the recovery waveform, recovery time was increased as the voltage was increased. The reason was that power burden of the SFCL increased when consumption power was increased, so the time to get back to SFCL took longer. We compared the characteristics of a resistive-type and transformer-type SFCL. As a result, we found that the fault current of a transformer-type was lower than resistive-type and recovery time of the SFCL was shorter. Consequently, transformer-type SFCL was more profitable for limitation of fault current and recovery time under the same condition for reclosing operation.

Construction of Resource Recovery System for Organic Wastes (유기성 폐기물의 자원화 체제구축에 관한 연구)

  • 양재경;최경민
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.2
    • /
    • pp.290-308
    • /
    • 1999
  • In this study a system for the treatment or recyling of organic wastes from both urban and rural area was recommended. It was developed based on the resource recovery system regarding human being by four tectnologies; forage, methane production, high-grade composting and complete decomposition. High quality compost can be produced by combining several kind of wastes produced from urban and agricultural areas. High quality compost must possess not only general characteristics of ordinary compost, but also a superior ability to improve the soil properties and must contain more nutrients for plant. Cedar chips were recommended as the main bulking agent to adjust moisture contents and air permeability. Charcoal and zeolite can be used not only as the second bulking agent but also as fertilizer for improve the soil amendment. Complete decomposition of organic wastes is defined by organic matter being completely converted to $CO_2$ and water. All the input water was evaporated by the heat produced through the oxidation of organic matter, In the present study, the complete treatments were successfully achieved for Shochu wastewater, swine wastes, thickened excess sewage sludge, wastes produced by Chinese restaurant and anaerobic digested sludge. First of all, recycling center of organic wastes should be established for the protect the environments and effective recovery of organic resources. This may means the way to derive the recovery of human value.

  • PDF

Anaerobic Hydrogen Fermentation and Membrane Bioreactor (MBR) for Decentralized Sanitation and Reuse-Organic Removal and Resource Recovery

  • Paudel, Sachin;Seong, Chung Yeol;Park, Da Rang;Seo, Gyu Tae
    • Environmental Engineering Research
    • /
    • v.19 no.4
    • /
    • pp.387-393
    • /
    • 2014
  • The purpose of this study is to evaluate integrated anaerobic hydrogen fermentation and membrane bioreactor (MBR) for on-site domestic wastewater treatment and resource recovery. A synthetic wastewater (COD 17,000 mg/L) was used as artificial brown water which will be discharged from urine diversion toilet and fed into a continuous stirred tank reactor (CSTR) type anaerobic reactor with inclined plate. The effluent of anaerobic reactor mixed with real household grey water (COD 700 mg/L) was further treated by MBR for reuse. An optimum condition maintained in anaerobic reactor was HRT of 8 hrs, pH 5.5, SRT of 5 days and temperature of $37^{\circ}C$. COD removal of 98% was achieved from the overall system. Total gas production rate and hydrogen content was 4.6 L/day and 52.4% respectively. COD mass balance described the COD distribution in the system via reactor byproducts and effluent COD concentration. The results of this study asserts that, anaerobic hydrogen fermentation combined with MBR is a potent system in stabilizing waste strength and clean hydrogen recovery which could be implemented for onsite domestic wastewater treatment and reuse.

Basic Survey for Evaluation of Instream flow at Natural Recovery Reach (자연형 하천 복원구간의 하천유지유량 산정을 위한 기초조사)

  • Sea, Kyu-Woo;Woo, Sang-Hwan;Kim, Gwang-Seob
    • Journal of Wetlands Research
    • /
    • v.3 no.2
    • /
    • pp.119-131
    • /
    • 2001
  • This study uses HEC-RAS for the quantitative aspects and the QUAL2E model for the qualitative aspects of the flow of urban streams, where the natural recovery system is applied. The instream flow of the small streams is estimated using the numerical model by verifying the existing data with the acquired data. The characteristics of the model reach place more weight on the drought discharge around the ordinary discharge, and this is caused by the natural recovery system that maintains the existing bank. The data of direct discharge to the sewage treatment plant through the inception pipe, BOD, DO, temperature, and so forth, are the official data from the department of environment. Considering the characteristics of small streams, the factors for the QUAL2E model are estimated with the focus on the hydraulic conditions and the stream view. This study proposes the future improvements for the natural recovery system by investigating the practical use of the waterfront and the application of the proper instream flow. Also, the hydraulic and hydrological investigation of the covering rate by the natural vegetation and the meandering by the varying river way is performed.

  • PDF

Evaluation of the Performance and the Energy Consumption Characteristics of Heat Recovery Ventilators in Apartments (공동주택 열교환기의 성능 및 에너지소비 특성 평가)

  • Kim Sang-Min;Park Byung-Yoon;Sohn Jang-Yeul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.5
    • /
    • pp.496-504
    • /
    • 2005
  • Heat recovery ventilators (HRV) are developed in order to satisfy both energy conservation and the improvement of indoor air quality as an alternative for current natural ventilation systems and local mechanical ventilation systems in kitchens and bathrooms. However, the performance of HRV system and the consequent effect on heating and cooling energy saving have not been sufficiently validated quantitatively in case of the application of HRVs in real residences. In this study, field measurement and computer simulation were conducted in both summer and winter period to assess the performance and validate energy conservation effect of HRVs. Under the Korea weather condition, average total heat recovery efficiency was $27\%$ in summer and $46\%$ in winter. According to the field measurement, HRV system can save the energy by $10\%$ in summer and 15$\%$ in winter. Furthermore, according to the simulation assessment, HRV system can save the energy by $17\%$ in summer and $17\%$ in winter.

Numerical Analysis on Energy Consumption of an Exhaust Air Heat Recovery Type Outdoor Air Conditioning System for Semiconductor Manufacturing Clean Rooms (반도체 클린룸용 배기 열회수식 외기공조시스템의 에너지소비 수치해석)

  • Song, Gen-Soo;Yoo, Kyung-Hoon;Kim, Hyoung-Tae
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1306-1311
    • /
    • 2009
  • In recent semiconductor manufacturing clean rooms, in order to improve clean room air quality, air washers are used to remove airborne gaseous contaminants such as $NH_3$, SOx and organic gases from the outdoor air introduced into clean room. Meanwhile, there is a large amount of exhaust air from a clean room. From an energy conservation point of view, heat recovery is therefore useful for reducing the outdoor air conditioning load for a clean room. Therefore it is desirable to recover heat from the exhaust air and use it to reheat the outdoor air. In the present study, numerical analysis and experiment was conducted to simulate the amount of energy reduction of exhaust air heat recovery type air washer system. The present numerical results showed good agreement with the results of the experimental data.

  • PDF

The Study of Validity on the High Temperature Heat Pump System using Dyeing Wastewater (염색폐수를 이용한 고온수 히트펌프 시스템 타당성 연구)

  • Kim, Jeong-Yeol;Chung, Dong-Yeol;Park, Shung-Sang;Peck, Jong-Hyeon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.996-1001
    • /
    • 2009
  • The purposes of this work were suggested and validated the methods of heat recovery from dyeing wastewater exhausted in Sihwa and Banwol dyeing industrial park. We analyzed the present conditions of heat supplies and demands. So it was made a selection of the system combined heat exchanger for waste heat recovery and the high temperature heat pump. We decided the specifications of the heat recovery facilities. After this, economical assessment is performed to this system. The payback periods are within 4 years, 20 years and 5 years in case of K company, S company and A company. In addition, when they are produced the heat of same capacity, quantities of pollutants from used fuels were calculated.

  • PDF