• 제목/요약/키워드: System Interruption Cost

검색결과 68건 처리시간 0.025초

초고압 가스차단부의 냉가스 유동해석 (An Analysis of Cold Gas Flow-Field for UHV Class Interrupters)

  • 송기동;박경엽;송원표
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제49권6호
    • /
    • pp.387-394
    • /
    • 2000
  • This paper presents a method of cold gas flow-field analysis within puffer type GCB(Gas Circuit Breaker). Using this method, the entire interruption process including opening operation of GCB can be simulated successfully. In particular, the distortion problem of the grid due to the movement of moving parts can be dealt with by the fixed grid technique. The gas parameters such as temperature, pressure, density, velocity through the entire interruption process can be calculated and visualized. It was confirmed that the time variation of pressure which was calculated from the application of the method to a model GCB agreed with the experimental one. Therefore it is possible to evaluate the small current interruption capability analytically and to design the interrupter which has excellent interruption capability using the proposed method. It is expected that the proposed method can reduce the time and cost for development of GCB very much. It also will be possible to develop the hot-gas flow-field analysis program by combining the cold-gas flow field program with the arc model and to evaluate the large current interruption capability.

  • PDF

영구정전과 순간전압강하를 고려한 신뢰도 비용 평가 (Evaluation of Reliability Worth Considering Sustained Interruptions and Voltage Sags)

  • 이희태;문종필;설규환;윤상윤;김재철
    • 조명전기설비학회논문지
    • /
    • 제22권5호
    • /
    • pp.13-20
    • /
    • 2008
  • 과거에는 순간전압강하(Sag)나 고조파(Harmonics)와 같은 순간전력품질 문제가 부하에 큰 영향을 미치지 않았으나, 최근 컴퓨터와 같은 마이크로 프로세서를 이용하는 민감부하의 사용 증가로 인하여 전력품질에 대한 관심이 고조되고 있다. 이에 따라 현재까지 영구정전(Sustained Interruption)에 초점을 맞추고 일부 순간정전(Momentary Interruption)을 포함하여 진행되어 온 배전계통 신뢰도 연구 분야는 새로운 전환점을 맞이하고 있다. 즉, 전력품질문제로 인하여 많은 민감기기들이 트립(Trip)되어 신뢰도 비용이 발생하기 때문에, 전력품질을 고려하지 않은 신뢰도 비용평가는 그 정확도가 떨어질 수밖에 없는 실정에 있다. 본 논문에서는 배전계통 사고 시 이 사고를 제거하기 위해 사용된 리클로져에 의해 발생하는 순간전압강하를 고려하였다. 기존의 영구정전에 의한 신뢰도 비용과 순간전압강하에 의해 트립되는 기기들의 신뢰도 비용을 포함하는 개선된 배전계통 신뢰도 비용 평가 기법을 제안하였다.

국내 수용가의 설문조사를 통한 수용가 정전비용 산출을 위한 수용가 특성에 관한 연구 (Study on the customer characteristics for the customer interruption cost analysis in term of the domestic customer survey)

  • 박수만;김재철;배주천;문기승;문승일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.142-144
    • /
    • 2003
  • Recently, the bidding between generating company and transmission company have been accomplished according to restructure of power system industry. And the bidding will develop to TWBP (Two-Way Bidding Pool)type. In this way, it will be important issue on optimum reliability maintenance of the power supply. Thus, in this paper illustrate to customer survey result for the interruption cost analysis. Actually the domestic customer survey is performed on 300 samples. Then the points at customer survey and direction are presented in this paper. Customer is divided into 5 types, total response of customer survey was 22 percent. Furthermore domestic customer survey result characteristics will be use for the basis data of the large scale customer survey.

  • PDF

수용가용 전력저장시스템의 경제성분석에 관한 연구 (A Study on the Economic Analysis of the Energy Storage System in Customer)

  • 김정호;장준오
    • 신재생에너지
    • /
    • 제10권3호
    • /
    • pp.47-54
    • /
    • 2014
  • Recently, BESS is considered as one of essential countermeasure for demand side management. However, an economic evaluation is critical issue for the introduction of power system because the cost of BESS is very high in present stage. Therefor, this paper presents economic evaluation method for customer use case by considering peak shaving function based on the real time price. From the case study on the model power system and educational customer, it is confirmed that the proposed method is a practical tool for the economic analysis of BESS. and analytical approach for the reliability assessment in radially operated distribution systems. The approach can estimate the expected reliability performance of distribution systems by a direct assessment of the configuration of the systems using the reliability indexes such as NDP (Non-Delivery Power) and NDE (Non-Delivery Energy). The indexes can only consider the number and configuration of the load, but can not consider the characteristics of the load which is the one of the most important factor in the investment cost for the distribution systems. Therefore, this paper presents the new performance indexes for the investment of the distribution facilities considering both the expected interruption cost for the load section and the operation characteristics of Energy Storage System. The results from a case study show that the proposed methods can be a practical tool for the reliability management in distribution systems including Energy Storage System.

합리적 전력수요관리를 위한 직접부하제어 사업의 개선 방안 (An Improvement Scheme of Direct Load Control Program for Electric Power Demand Management)

  • 김규호;최승길;송경빈
    • 조명전기설비학회논문지
    • /
    • 제21권8호
    • /
    • pp.81-86
    • /
    • 2007
  • 본 연구에서는 현 직접부하제어사업의 실태 및 문제점을 도출하고 국내 실정에 맞는 직접부하제어 활용 및 개선을 위하여 직접부하제어 사업 계약자를 대상으로 제도 개선사항, 지원금액 개선사항 및 제도 실시 등에 대한 설문조사를 하였다. 대표적으로 개선되어야 할 방안으로는 직접부하제어사업 참여 업체 증가를 위하여 기본지원금 및 제어지원금의 검토 방안과 소비자의 의견을 반영한 수요측 입찰 실시 방안이 필요하며, 시장운영과 계통운영에 있어서 페널티, 차단시간, 차단 횟수, 통보시간, 계약기간 등에 대한 기준을 정립할 필요가 있음을 확인하였다.

배전계통의 신뢰도 향상을 위한 분산형전원의 설치 및 운영 (Placement and Operation of DG System for Reliability Improvement in Distribution Systems)

  • 김규호;이상근;김진오;김태균;전동훈;차승태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.348-350
    • /
    • 2004
  • This paper presents the scheme for reliability improvement by dispersed generation system (US) installation and operation in distribution systems. The objective functions such as power losses cost, operation cost of DGS, power buy cost and interruption cost are minimized for reliability improvement. The original objective functions and constraints are transformed into the equivalent multiple objective functions with fuzzy sets to evaluate their imprecise nature. The several indices for reliability evaluation are improved by dispersed generation system installation.

  • PDF

거시적인 접근방법을 통한 공급지장비 추정에 관한 연구 (A Study on the Outage Cost Assessment by using Macro Approach)

  • 박영신;전동훈;박정제;오태곤;조경희;최재석
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1703-1711
    • /
    • 2010
  • Electric power utilities are facing increasing uncertainties regarding the economic, political, societal, environmental constraints under they operate and plan their future systems. The utilities have to integrate consumers' interruption cost representing reliability worth of electricity into the process of determining the optimum investment level. In order to do so, the estimated outage cost must be included into quantitative index corresponding to system capital and operation investment cost to establish an optimal expansion plan. This paper is a study on the outage cost assessment by using macro approach for calculating IEAR(Interrupted Energy Assessment Rates) and the TRELSS(Transmission Reliability Evaluation for Large-Scale Systems) program was used to calculate EENS(Expected Energy Not Served).

국내 지중 배전계통의 부하특성별 최적계통 결정절차 및 사례검토 (Optimal configuration for underground power distribution system and its case study)

  • 노황래;조성수;박창호;김병숙;이수묵
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1450-1452
    • /
    • 1999
  • This paper presents the method of determination for optimal underground power distribution system in our country. To get optimal system, it is necessary to evaluate reasonably important factors such as installation cost, reliability index, customer interruption cost, convenience of installation and system flexibility. This study also described the new method which was applied to UI-San industrial park as a case study.

  • PDF

경제성에 기반한 배전계통 설비투자 우선순위 결정에 관한 연구 (A Study on the Decision Strategy of Investment Priority Focused on Economics in Distribution Network)

  • 박창호
    • 조명전기설비학회논문지
    • /
    • 제23권9호
    • /
    • pp.31-39
    • /
    • 2009
  • 본 논문에서는 경제성 평가를 기반으로 하는 배전 설비투자 우선순위를 결정하기 위하여 배전계통 구성, 설비 및 부하정보를 이용하여 배전계통을 모델링 하고, 현 계통의 신뢰도를 개선하기 위한 방향으로 설비투자 대안들을 설계한 다음, 이 대안들을 대상으로 신뢰도 및 경제성을 평가하는 모델을 제시하였다. 이러한 투자대안들의 신뢰도 영향과 경제성을 분석하기 위하여 한전의 주요 배전설비(15종)의 신도율(시변고장율)과 설비투자시 영향을 받는 고객들의 정전비용을 적용하여 경제적 효과를 산출하였으며, 이러한 투자 방법론의 유효성을 검증하기 위하여 한전의 배전사업소 실제 투자안을 대상으로 하여 경제성 평가를 수행한 결과와 비교분석하였다.

Developing a New Risk Assessment Methodology for Distribution System Operators Regulated by Quality Regulation Considering Reclosing Time

  • Saboorideilami, S.;Abdi, Hamdi
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권4호
    • /
    • pp.1154-1162
    • /
    • 2014
  • In the restructured electricity market, Performance-Based Regulation (PBR) regime has been introduced to the distribution network. To ensure the network stability, this regime is used along with quality regulations. Quality regulation impose new financial risks on distribution system operators (DSOs). The poor quality of the network will result in reduced revenues for DSOs. The mentioned financial risks depend on the quality indices of the system. Based on annual variation of these indices, the cost of quality regulation will also vary. In this paper with regard to reclosing fault in distribution network, we develop a risk-based method to assess the financial risks caused by quality regulation for DSOs. Furthermore, in order to take the stochastic behavior of the distribution network and quality indices variations into account, time-sequential Monte Carlo simulation method is used. Using the proposed risk method, the effect of taking reclosing time into account will be examined on system quality indicators and the cost of quality regulation in Swedish rural reliability test system (SRRTS). The results show that taking reclosing fault into consideration, affects the system quality indicators, particularly annual average interruption frequency index of the system (SAIFI). Moreover taking reclosing fault into consideration also affects the quality regulations cost. Therefore, considering reclosing time provides a more realistic viewpoint about the financial risks arising from quality regulation for DSOs.