• Title/Summary/Keyword: Suspended construction building

Search Result 14, Processing Time 0.026 seconds

A Study on Cognition Analysis for Effective Management of Suspended Construction Building (공사 중단 건축물의 효율적 관리를 위한 인식 분석 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.131-137
    • /
    • 2019
  • The purpose of this study is to investigate the perception of buildings suspended from construction and to analyze the problems that are inherent and effective in the management of public officials and residents in the area where construction is suspended. There are 63 buildings in the Gangwon area, 16% of which are occupied by the whole area. 31% of the apartment houses are occupied the most, and 10 years or more is suspended. 241 of them accounted for 62%. In order to efficiently manage buildings that are suspended from construction, protection measures should be taken to ensure safety and prevent crime through periodic and continuous management of facility grade management that conforms to the special act on safety and maintenance of facilities. Effective support for budget and personnel is required for efficient management of construction suspended.

Status and Problems of Buildings Neglected for Long Period after Discontinuance of Construction in Jeju (제주도내 공사중단 장기방치 건축물 현황과 문제점)

  • Kim, Doo-Seong;Han, In-Deok;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.153-154
    • /
    • 2023
  • Neglected buildings for long period can seriously reduce the durability of the building due to rust in rebars and deterioration in concrete quality due to exposure to outside air, and the seriousness of suspended buildings such as safety accidents and social crimes is emerging due to poor management. In this study, various problems such as the occurrence of safety accidents were analyzed through a fact-finding survey of buildings that have not been maintained due to long-term neglect in all areas of Jeju. In order to reuse a building that has been discontinued, the safety of the building structure itself must be checked. After securing safety through durability investigation, construction should be resumed or converted into a normal building through re-purposing, dismantling, remodeling, etc.

  • PDF

An Experimental Study on Lateral Load of Vertically Suspended Shear Reinforcement for Reinforced Concrete Flat Plate slab (철근콘크리트 무량판 슬래브의 수직걸림형 전단보강재의 수평하중에 대한 실험적 연구)

  • Woo, Jong-Yeol;Kim, Jae-Ung;Yoo, Choong-Geun;Kang, Su-Min;Lee, Byeong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.78-79
    • /
    • 2014
  • This study is concerned with the VS shear reinforcement that it can be installed easily in filed as product at the factory and seismic performance can be achieved. The method of study is as follows. first, we researched constructability and economy of existing construction method. Secondly, we made specimen and were examined structural performance tests in order to verify the performance of the shear reinforcement for lateral force like seismic load. As a result, developed VS shear reinforcement increased in shear strength and stiffness of reinforcement, structural safety is judged to be increased.

  • PDF

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

A Study on the Status and Actual Condition of Suspended Buildings in Gangwon (강원도 공사중단 건축물의 현황 및 실태 조사 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.138-144
    • /
    • 2019
  • To analyze the present state of buildings suspended in Gangwon and estimate the compressive strength by visual inspection and Schmidt hammer method in order to analyze durability etc.. In this study, we analyzed the problems that existed in the location where construction is suspended and efficient management method. Expected construction restoration of construction will be restarted, and important parts of the construction site should be given the best protection measures so that the quality can be maintained thoroughly. The construction of the suspended construction is exposed to the freezing and thawing damage over time. Therefore, it is necessary to take measures such as maintenance, and take protective measures by establishing a plan to improve the durability of buildings that are under construction.

Study on the Application of Tuned Pendulum Slab Damper system (TPSD) to Building structure (진자슬래브에 의한 진동제어시스템의 적용성 평가)

  • Kim, Yang-Jung;Seo, Gun-Bae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.181-184
    • /
    • 2012
  • The Tuned Pendulum Slab Damper(TPSD)system is mainly composed of suspended pendulum slab which was hanging with cable wire from the top floor of building without any extra loads structurally, and can be helpful to reduce vibration with effect of tuned mass damper function by the principle of pendulum movement. The experiment was performed with miniatures of the 30stories of steel structure building by the forced vibration test using shaking table, and the result was reduced about 42% of vibration. The purpose of this study was to make analysis of application of the TPSD system to new building and exist building against strong wind or seismic wave. The result of this study was that the TPSD system shall be satisfactory in field of execution, process control, safety and economical efficiency with saving up to 70% of construction cost.

  • PDF

Wind load parameters and performance of an integral steel platform scaffold system

  • Zhenyu Yang;Qiang Xie;Yue Li;Chang He
    • Wind and Structures
    • /
    • v.36 no.4
    • /
    • pp.263-275
    • /
    • 2023
  • As a new kind of construction facility for high rise buildings, the integral steel platform scaffold system (ISPS) consisting of the steel skeleton and suspended scaffold faces high wind during the construction procedure. The lattice structure type and existence of core tubes both make it difficult to estimate the wind load and calculate the wind-induced responses. In this study, an aeroelastic model with a geometry scale ratio of 1:25 based on the ISPS for Shanghai Tower, with the representative square profile, is manufactured and then tested in a wind tunnel. The first mode of the prototype ISPS is a torsional one with a frequency of only 0.68 Hz, and the model survives under extreme wind speed up to 50 m/s. The static wind load and wind vibration factors are derived based on the test result and supplementary finite element analysis, offering a reference for the following ISPS design. The spacer at the bottom of the suspended scaffold is suggested to be long enough to touch the core tube in the initial status to prevent the collision. Besides, aerodynamic wind loads and cross-wind loads are suggested to be included in the structural design of the ISPS.

Optimum topology design of geometrically nonlinear suspended domes using ECBO

  • Kaveh, A.;Rezaei, M.
    • Structural Engineering and Mechanics
    • /
    • v.56 no.4
    • /
    • pp.667-694
    • /
    • 2015
  • The suspended dome system is a new structural form that has become popular in the construction of long-span roof structures. Suspended dome is a kind of new pre-stressed space grid structure that has complex mechanical characteristics. In this paper, an optimum topology design algorithm is performed using the enhanced colliding bodies optimization (ECBO) method. The length of the strut, the cable initial strain, the cross-sectional area of the cables and the cross-sectional size of steel elements are adopted as design variables and the minimum volume of each dome is taken as the objective function. The topology optimization on lamella dome is performed by considering the type of the joint connections to determine the optimum number of rings, the optimum number of joints in each ring, the optimum height of crown and tubular sections of these domes. A simple procedure is provided to determine the configuration of the dome. This procedure includes calculating the joint coordinates and steel elements and cables constructions. The design constraints are implemented according to the provision of LRFD-AISC (Load and Resistance Factor Design-American Institute of Steel Constitution). This paper explores the efficiency of lamella dome with pin-joint and rigid-joint connections and compares them to investigate the performance of these domes under wind (according to the ASCE 7-05), dead and snow loading conditions. Then, a suspended dome with pin-joint single-layer reticulated shell and a suspended dome with rigid-joint single-layer reticulated shell are discussed. Optimization is performed via ECBO algorithm to demonstrate the effectiveness and robustness of the ECBO in creating optimal design for suspended domes.

An Experimental Study of Vertically Suspended Shear Reinforcement for Reinforced Concrete Flat Plate slab (철근콘크리트 무량판 슬래브의 수직걸림형 전단보강재에 관한 실험적 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Doh, Sun-Boong;Kim, Sang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.173-174
    • /
    • 2012
  • This study is concerned with the VSTUD shear reinforcement that it can be installed easily in filed as product at the factory and seismic performance can be achieved. The method of study is as follows. first, we researched constructability and economy of existing method. Secondly, we made specimen and were examined structural performance tests in order to verify the performance of the shear reinforcement. As a result, developed SL shear reinforcement increased in shear strength and stiffness of reinforcement, structural safety is judged to be increased.

  • PDF

Extent and persistence of dissolved oxygen enhancement using nanobubbles

  • Tekile, Andinet;Kim, Ilho;Lee, Jai-Yeop
    • Environmental Engineering Research
    • /
    • v.21 no.4
    • /
    • pp.427-435
    • /
    • 2016
  • In this study, change in water-dissolved oxygen (DO) was analyzed under various synthetic water qualities and nanobubbles (NBs) application conditions, such as gas type, initial DO as well as water dissolved, suspended and organic matters contents. When oxygen, rather than air, was introduced into nitrogen-desorbed ultra-pure water, the stagnation time was significantly increased. It took ten days for DO concentration to drop back to saturation. The higher the initial DO concentration, the longer particles were observed above saturation due to particle stability improvement. The oxygen mass transfer rate of 0.0482 mg/L/min was found to reach a maximum at an electrolytic concentration of 0.75 g/L, beyond which the transfer rate decreased due to adsorption of negative ions of the electrolyte at the interface. High levels of turbidity caused by suspended solids have become a barrier to dissolution of NBs oxygen into the water solution, and thus affected the transfer performance. On the other hand, by applying NBs for just an hour, up to 7.2% degradation of glucose as representative organic matter was achieved. Thus, NBs technology would maintain a high DO extent for an extended duration, and thus can improve water quality provided that water chemistry is closely monitored during its application.