• Title/Summary/Keyword: Supply status

Search Result 865, Processing Time 0.031 seconds

Analysis on the Supply Chain of Port & Logistics, Industry from the Viewpoint of its Relationship (관계 유형 관점에서의 항만물류 공급망 분석)

  • Choi Hyung-Rim;Park Nam-Kyu;Kwon Hae-Kyoung;Yoo Dong-Yeol
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.10 no.3
    • /
    • pp.38-47
    • /
    • 2005
  • To efficiently manage the supply chain of an industry, the structure and characteristics of a supply chain have to be predefined and it is strongly required to get a framework to analyze a supply chain. We have developed a framework to analyze a supply chain from the viewpoint of chain relationship. It is possible to evaluate the degree of supply chain of each entity by using the framework. We have applied the framework to the port & logistics industry. From this research, we have identified tile current status of supply chain of port & logistics industry in the Korea and extracted some considerations for the healthy supply chain of Korean port & logistics industry.

  • PDF

The Supply Status Analysis of New Renewable Energy Based on Public Obligation System (공공의무화 제도에 따른 신재생에너지 보급 실태 분석)

  • Seo, Sang-Hyun;Lee, Yong-Ho;Kim, Hyung-Jin;Cho, Young-Hum;Hwang, Jung-Ha
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.220-225
    • /
    • 2011
  • Based on the supply status statistics of new renewable energy according to public obligation system, current status of overall application centered on solar heat, solar ray, and geothermal heat as energy sources that can be applied to buildings may be analyzed as follows. (1) After the public obligation system, the investment costs on the total construction costs by years were between 5.21% and 7.12%: they were 7.12% in 2004, where the system was initially implemented; and they were gradually declined from 2005 to 2011, 5.76% in average. The ratio of equipment investment per energy sources in the total construction costs was 5.9%, which was slightly more than the obliged ratio. The order of investment costs per energy source was solar ray, geothermal heat, and solar heat. (2) Among the 1,433 sites in the plan of new renewable energy installation based on the public obligation system, "for cultural & social use" was most in target institution, and facilities for education & research was most in use classification, followed by public working, culture & rally, and sports. The number of facilities applied according to the case for planning installation per use classification of the target institution was between 1.1 and 1.5, or 1.4 in average of energy source. Conclusively, the authors of this study investigated overall current status of new renewable energy supply from the analysis of statistic data, and it may be needed of further supplementation of various examinations by visiting investigation and interviews with practitioners based on classification of use of target institutions.

  • PDF

A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method (최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구)

  • Choe, Gyu-Sik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

Activation Strategy for the Ship Supply Industry at the Port of Busan

  • Gu, Min-Jin;Ahn, Jin-Woo;Moon, Sang-Young
    • Journal of Navigation and Port Research
    • /
    • v.36 no.2
    • /
    • pp.141-148
    • /
    • 2012
  • This study evaluates how activation plans presented by previous research are perceived by employees in the ship supply industry by sample surveys. Another objective of this study is to also assist in the selection of effective activation plans. It is becoming more and more difficult for the Port of Busan to strengthen its competitiveness in the ship supply industry by maintaining the status quo. Much research extending the scope of research subjects in the port logistics industry indicates that the development of the port logistics industry is very important for creating new value for the Port of Busan. The results shows that improvement in the retail structure and government support had a significantly positive correlation between the importance and necessity of the ship supply industry activation.

A Study on Power Supply Infrastructure Construction of Pusan U-City Test bed (부산 U-City 테스트베드 전원 인프라 구축에 관한 연구)

  • Kim, Jung-Guen;Baik, Song-Hun
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.55-58
    • /
    • 2008
  • This article describes power supply infrastructure construction methods which are considered from U-City infrastructure. For the eisting city and town, it is one the issue to find an economic method to construct outside infrastructure including ubiquitous service device. Because the economic construction method could minimize the construction budget which cost big portion of U-City. And the power supply infrastructure is the fundamental layer to keep network and service layer stable. This paper suggests several ways to construct methods with keeping pre-constructed underground power cable by attaching inepensive power nodal controller working in zigbee network and introduces how to monitor and mana ge the status of power supply to network and service device.

  • PDF

A Solution for Sourcing Decisions under Supply Capacity Risk (공급능력 리스크를 고려한 최적 구매계획 해법)

  • Jang, Won-Jun;Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.42 no.1
    • /
    • pp.38-49
    • /
    • 2016
  • This paper proposes a mathematical model-based solution for sourcing decisions with an objective of minimizing the manufacturer's total cost in the two-echelon supply chain with supply capacity risk. The risk impact is represented by uniform, beta, and triangular distributions. For the mathematical model, the probability vector of normal, risk, and recovery statuses are developed by using the status transition probability matrix and the equations for estimating the supply capacity under risk and recovery statuses are derived for each of the three probability distributions. Those formulas derived are validated using the sampling method. The results of the simulation study on the test problem show that the sourcing decisions using the proposed solution reduce the total cost by 1.6~3.7%, compared with the ones without a consideration of supply capacity risk. The total cost reduction increases approximately in a linear fashion as the probability of risk occurrence or reduction rate of supply capacity due to risk events is increased.

I-O Analysis for the Economic Impact of Water Industry (산업연관분석에 의한 수도산업의 경제적 파급효과 분석)

  • Choi, Han-Joo;Park, Doo-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.1
    • /
    • pp.25-32
    • /
    • 2010
  • Until now, we recognize that water supply is a public sector rather than business sector in Korea. In spite of the general recognition, water supply sector has an important role within the national economy as an industry. This study try to analyze the current status of water supply sector as a industry with input-output analysis. As we expected, water supply sector is still minor as an industry sector. However, this is not because water supply sector is not important as a industry, but because the price of water too low or free. With regard to the water price impacts, our results show that the 10% increasing water price has only increased 0.01% of the general price level, which is neglectable. To have a competitiveness as a industry, water sector should be reevaluated based on its socioeconomic value. Government policy for water supply sector should achieve two purposes; the one is for as a public service, the other is for the setting new paradigm as an industry.