Kim, Kyung-Yup;Suh, Sang-Ho;Lee, Jung-Woo;Roh, Hyung-Woon;Kim, Sang-Gyun
유체기계공업학회:학술대회논문집
/
2001.11a
/
pp.165-170
/
2001
An extensive range of pumping facilities are employed in the regional water supply system in metropolitan areas, and optimization and the systematic combination of the Pump facilities have direct bearing on the stability and economy of the water supply system concerned. These systems must be able to guarantee stability, efficiency and offer high reliability. Preparation of metropolitan area regional water supply system construction project must include a basic plan which takes into account the suitability of pumping facilities to be used, the environment in which facilities will be installed, man-power requirements and basic operational and management policies. This paper contains over-all analysis of the management of metropolitan area regional water supply systems as like Jayang, Paldang 1st pump station. In the study, it aims to prepare counterplan which will be operated and managed the pump upon the operational conditions and to suggest the proposal for water facilities codes to decides total head of pump in Korea.
The results of a study of the coordination effect in stocking and promotional markdown policies for a supply chain consisting of a retailer and a discount outlet (DCO) are reported here. We assume that the product is sold in two consecutive periods: the Normal Sales Period (NSP) and the subsequent Promotional Markdown Sales Period (PSP). We first study an integrated supply chain in which managers in the two periods design a common system so as to jointly decide the stocking quantities, markdown time schedule, and markdown price to maximize mutual profit. Next, we consider a decentralized supply chain. An uncoordinated contract is designed in which decisions are decentralized to optimize the individual party's objective function. Here, three sources of system inefficiencies cause the decentralized system to earn a lower expected system profit than that in the integrated supply chain. The three sources are as follows: in the decentralized system the retailer tends to (1) stock less, and (2) keep a longer sales period, and the DCO tends to (3) stock fewer leftovers inventories and charge a higher markdown price. Finally, a numerical experiment is provided to compare the coordinated model with the uncoordinated model to explore factors that make coordination an effective approach.
This paper describes the capacity calculation of power supply system for light Rail Transit Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we considered all of them for capacity calculation of power supply system for LRT. At first DC-fed-traction system is introduced on an outline, a characteristics of train and fed network, and design method of substation arrangements. Optimal design procedures are described, and program for capacity calculation of the system is presented. In addition, the computer simulated results are computed with the conventional simple calculation method.
This study proposes a collaboration system framework on the web service in a supply chain to implement an efficient virtual supply chain and improve an ability to fulfill received orders over a supply chain. The system based on the framework proposed in this paper plays an important role for automatic order negotiation and placing/receiving an order noticed in web service by the main system. Furthermore, it can evaluate the fulfillment of received orders over a supply chain by using the transaction results from hierarchically related vendors and establish efficient manufacturing plans. In a word, this system is the automated system for creating manufacturing plans, placing and receiving orders. A little more important main function of this system is that it has a dynamic evaluation capability about fulfillment with received orders over a supply chain, and improves the evaluation method of fulfillment ability with received orders with related to direct dealing vendors, which is a main problem in existing system. As a result, this system is able to reduce the work load of the sales and purchasing materials, production control division, to manage accurate inventory promptly, to maintain the optimal inventory level by analyzing the information of fulfillment ability with received orders, and to enhance the level of service for customers.
Park, Jung-Young;Hwang, Soon-Chan;Park, Moo-Ryong;Kim, Young-Chul;Ahn, Kook-Young
한국전산유체공학회:학술대회논문집
/
2008.03b
/
pp.280-283
/
2008
This study is concerned with development of air supply system in 250kW MCFC fuel cell system. The turbo blower is decided as an air supply system to increase the efficiency of fuel cell system. The turbo blower consists of an impeller, two vaneless diffuser, a vaned diffuser and a volute. The cascade diffuser is used to raise the efficiency of turbo blower. An aerodynamic design was done by applying the repeating design procedure including a meanline design, a 3D geometry generation and fluid dynamic calculation. It is confirmed from meanline and 3D flow analysis results that the operating range is enough and design requirements are successfully achieved. The performance test results were also included in this paper.
Proceedings of the Korean Society Of Semiconductor Equipment Technology
/
2004.05a
/
pp.123-128
/
2004
Semiconductor Wet Station has a very important place in semiconductor process. It is important that to discharge chemical with fit concentration and temperature using chemical supply system for clean process. The chemical supply system which is used currently is not only difficult to make a fit mixing rate of chemical which is need in clean process, but also difficult to make fit concentration and temperature. Moreover, it has high stability but it is inefficient spatially because its volume is great. We propose In-line System to improve system with implement analysis of fluid and thermal transfer on chemical supply system and understand problem of system.
Proceedings of the Korean Operations and Management Science Society Conference
/
2007.11a
/
pp.67-89
/
2007
This study addresses manufacturers' ability to influence their supply chain network in order to adapt to their competitive environment. From the perspective of a manufacture, the supply chain comprises a network of suppliers and customers, and is theoretically viewed as a complex adaptive system. This study considers the following questions: (1) How can adaptability of supply chain network be operationally defined? (2) How does adaptability of supply chain network lead to combinative capabilities? (3) What is the influence of adaptability of supply chain network on business performance? Drawing on literature streams in supply chain management, operations strategy, organizational change and learning, and complexity theory, this study develops and tests the constructs and operational measures of adaptability of supply chain network and model the nomological set of relationships among constructs that form the basis of our theory. This study then develops and tests a model describing the outcomes of adaptability of supply chain network and its influence on combinative capability and business performance. Empirical results of this study show that adaptability supply chain network directly and positively affects combinative capability. Further, this study finds that adaptability of supply chain network does not impact business performance directly, but rather is mediated through combinative capability, which provides the requisite variety for firms to survive and thrive in dynamic environments.
This study is the survey of a transition procedure of building services systems(heat source, HVAC, water supply) through the survey of existing office buildings, building design documents. The preference & major consideration of system selection is the engineer's opinions. The results of this survey can be used in selection of building services system design. In this survey, "Hot & cold water generator system" and "single duct CAV+FCU system", "Elevated water tank system" are selected. The most important consideration in system selection is the energy saving in heat source system, and comfort in HVAC system, and water pressure in water supply system. They prefer "steam boiler+absorption chiller system" for heat source system, "steam boiler+ice thermal storage system", "hot & cold water generator system", "district heating+absorption chiller system" : "single duct CAV+FCU system" and "single duct VAV+convector system" for HVAC system: and "booster pump system" for water supply system.
Since a power supply substation of the magnetic levitation train system includes a inverter which is necessary to change the frequency of power, it has a different characteristic comparing to any other railway system. Nowaday a study for determining rating of facilities constituting a power supply system and modeling that system is undergoing. In this paper, a analysis model for the power supply system of the magnetic levitation train using the 3-level inverter is proposed. And the analysis for output characteristic is performed using the PSCAD/EMTDC program. The control method about the output of 3-level inverter for supplying power to loads in magnetic levitation train system is also described.
Since the 9/11 terror attack, the event which caused supply chain disruption, supply chain security has becomes more important than ever before. Furthermore, such company's logistics strategies conflicting supply chain security as increased global sourcing, JIT manufacturing are increasing supply chain vulnerability. It could burden for global companies to strengthen supply chain security because not only it requires additional investment cost but also changes of companiy's global logistics strategy. However, on the other hand, supply chain visibility and resilience can be improved through supply chain security. In addition, it allows companies to stabilize supply chain structure as well as rapid and flexible response to market demand. The key issue is balancing between efficiency and supply chain security. To do this, identifying risk elements under the supply chain and assessing vulnerability of each supply chain components should be performed before developing efficient supply chain security management system without obstructing supply chain efficiency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.