• Title/Summary/Keyword: Supervision Process

Search Result 212, Processing Time 0.024 seconds

Data Collection Methods to Standardize Protocols of Safety Supervision System (안전관제시스템 프로토콜 표준화를 위한 데이터 수집 방법)

  • Shin, Kwang-Ho;Um, Tae-Hwa;Lim, Dam-Sub;Ahn, Jin
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.159-169
    • /
    • 2016
  • The current railway control system in Korea is comprised of signaling, electric rail power, communication, and maintenance systems that are independent of each other. Further, these systems have different mediums and protocols for transmitting the field equipment data to the central control system. The Safety Supervision System has as its purpose the collecting of safety-related data from each system to predict and prevent accidents, this system utilizes standard protocol. Safety-related data need to be collected from field data transmission devices of the existing control system, the data should be collected without affecting the communication of the existing system. In this study, sniffing skill, which is typically used for network traffic monitoring or security, is used to collect data. The problems arising from the use of sniffing devices are noted, and the Packet Conversion Node is proposed as a solution to the problems. Further, functional and performance testing were completed for the prototype, and the software architecture and packet conversion process were verified.

A Study on the Construction Process of Agricultural Facilities (농촌 시설물 건설 프로세스 분석)

  • Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee;Cho, Hyung-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.151-154
    • /
    • 2008
  • In today's agriculture, there has been an increase in the construction of agricultural facilities due to the need to maximize land usage and many customer demands for products. But many agricultural facilities are constructed by not qualified construction company so it often causes many accidents like breakdowns and repairs. this study is to understand the construction process of agricultural facilities. The results of this research are that greenhouse is lack of the law of contract and the performance and need for the construction process supervision. Vinyl House is needed to supervise the design of the structure.

  • PDF

A Study on the Application of Design Process in the Architectural Design Practice (건축설계 실무과정에서 디자인 프로세스의 적용에 관한 연구)

  • Kang, Mi-hyun;Kim, So-ra;Shin, Byeong-uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.3
    • /
    • pp.59-66
    • /
    • 2022
  • This study aims to find out how architectural designers applied the design process and what content is applied in the practical process of architectural design in Korea, and to improve it if there is a problem. So the study is carried out by investigating 13 architects(Including one person who wants to keep his work private) with extensive experience in architectural design. The architects were questioned on how and what content the design process was used for their representative works that had been designed. And interviews and field surveys were conducted on other matters to be improved. The survey was conducted from November 2021 to July 2022. According to the conclusion of this study, First, Most architects were applying the design process in the architectural design practice. These are caused by an impact on education, but there was also an aspect of preparation in terms of guidelines such as the Architects Association and storage rights. Second, Although the design process differed in each name and phase, it was generally carried out in the order of the start phase, the planning work phase, the basic design phase, the intermediate design phase, the implementation quarterly, and construction. Third, The step-by-step work of the design process differed slightly depending on the architect, but counseling and contract work were mainly performed at the start-up phase, and field surveys, legal investigations, and case studys were conducted at the planning phase. In the basic design phase, some contents related to architectural programming, basic drawings, images, and models were used as main work contents. In the intermediate design phase, secondary contents such as licensed books and facility facilities were the main tasks. In the implementation design phase, detailed maps and various frost facilities were finally inspected. Since then, construction and supervision have been carried out in the order of progress. Forth, As for the contents to be improved in the future, the architect's ability, the designer's knowledge of the overall architecture, the design supervision system, and the expansion of time for the initial design process were answered.

Application of JSA and Checklist in Asbestos Sealing (석면 해체제거 보양작업에서 JSA 및 Checklist 적용)

  • Cho, Guy Sun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.61-66
    • /
    • 2020
  • As asbestos-containing buildings are getting older, asbestos deconstruction works are increasing. As a result, accident risks such as falls, cuts, electric shocks, and suffocation are increasing. Existing studies are mostly about health management and institutional policy research and there is little research on work risk. So workplace risk assessments that are easily applicable in the field are required to be applied. Sealing is the first process of asbestos deconstruction and is the first step to ensure worker's safety. Job Safety Analysis(JSA) and Checklist were used to identify the risk factors and to calculate the level of the risk. By comparing the two risk assessment tools, it was figured out that the JSA is appropriate for the initial process and change of work procedure while Checklist is appropriate for repetitive work. Because the sealing process is sort and simple, it is unlikely to cause serious injury. But since the risk of falling and cuts are exist, safety education and supervision are necessary to maintain a safe working environment.

공로수송통계의 문제점과 개선방안에 관한 연구

  • 이한준
    • Journal of Korean Society of Transportation
    • /
    • v.7 no.1
    • /
    • pp.43-55
    • /
    • 1989
  • This study is to review the road traffics and its process by the type of business in annual Statistical Yearbook of Transportation published under the supervision of Ministry of Transport, and the main purpose of this study is to find out an recommendations for the result of the review. For this purpose, this study surveyed and analyzed actual results and its output process in Statistical Yearbook by vehicle and business types. The local survey is performed for the nationwide 23 cities to produce passenger (ton) number and passenger (ton)-㎞ number by vehicle and business types. The result of the local survey is compared with the road traffics in Statistical Yearbook of Transpotation. The result of the survey analysis reveals that road traffic in Statistical Yearbook is produced formally and there is remarkable differences between road traffic in Statistical Yearbook and local survey output. Conclusively, statistical output process of road traffics must be improved to solve th se problems mentioned above in respect to system and technic. Also it is recommended to publish its own road traffic statistics (tentatively named Statistical Yearbook of Road Transportation) just like Statistical Yearbook of Railroad for user's expediency and practicality.

  • PDF

Derivation of Key Safety Management Factors by Construction Process through Cross-Tabulation Analysis between Accident Types and Objects (건설공사 공종별 사고유형 및 사고객체 교차분석을 통한 중점안전관리항목 도출)

  • Yoo, Nayeong;Kim, Harim;Lee, Chanwoo;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.127-128
    • /
    • 2022
  • The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

The State-Owned Enterprises Reform in Vietnam

  • Lam, Tran Dinh
    • SUVANNABHUMI
    • /
    • v.6 no.2
    • /
    • pp.37-63
    • /
    • 2014
  • The economic renovation in Vietnam has shown promising achievements. The process of reforming and equitizing state-owned enterprises, and reducing subsidies from the government have made significant progress since 1986. However, this policy has not received the adequate valuation from leaders. Big companies have not been equitized, and are still managed and subsidized by the government, resulted in budget losses. Corporations have been dominated by political interests. This has led to arguments for better and more feasible measures which could save national budget. Corruption in Vietnam mostly originates from state-owned enterprises, for the monopoly was given by government to those enterprises as foreign partners continue to compete under market-oriented mechanism and transparent supervision. Therefore, renovation of the business mechanism, as well as speeding up equitization and minimizing people's properties, have become crucial in the regional integration trend. This is entirely a vital factor in the renovation process. This study explores plans, as well as the merits of the renovation process in Vietnam, ultimately envisioning to overcome current consequences and motivate Vietnam's economy.

  • PDF

A study on supervision and ethical dilemmas in the field of social welfare administration (사회복지 행정영역에서 수퍼비젼과 윤리적 딜레마에 관한 연구)

  • Ae-Ra Lee;Hyun-Seung Park
    • Industry Promotion Research
    • /
    • v.9 no.2
    • /
    • pp.77-83
    • /
    • 2024
  • This study seeks to find ways to make desirable decisions in the face of ethical dilemmas experienced by social workers through research on ethical dilemmas in the social welfare administrative field. Recognizing the importance of ethical issues in the social welfare profession, we have established a social welfare code of ethics, and have opened 'Social Welfare Ethics and Philosophy' in the social welfare major curriculum to address ethical issues as a major issue. However, despite changes and desires in practice and education, the theoretical and practical interest in social welfare academia was very insufficient. Among the various ethical issues in social welfare practice, it can be said that ethical decision-making is the most burdensome for social workers. Therefore, in order to perform a role as an expert in social welfare practice, there is a need to increase awareness of the importance of ethical issues and to seek ethical methods and procedures to make the right decision by considering ethical dilemma situations. In this study, through research on various ethical dilemmas occurring in social welfare practice, it will be possible to understand ethical sensitivity in the supervision process and consider ways to train supervision experts.

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.