Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2002.04a
/
pp.167-172
/
2002
Seoul subway system has been constructed to solve traffic difficulties of Seoul metropolitan, and now is the major public transportation. However, the more line has added in the system the deeper the bottom of the tunnel base. And a huge amount of groundwater along the line has seeping into the tunnel. Several subway stations has pumping system to extract the groundwater to the outside and consequently, groundwater table along the line has declined gradually. Groundwater table has dropped about 40 meters at some areas, There was some study for the proper usage of the abstracted groundwater and the project to use the groundwater has launched already by the local government. However. more serious problem is expected on quality degradation of soil and groundwater as the decline of groundwater table along the subway line. This study suggests that the detailed groundwater environmental study should be made as soon as possible for this. If there is any pollution leaking at the surface area of the groundwater depression, the pollution will be seep into the subway tunnel in some day even though the time will be different with the soil material and hydraulic characteristics of the aquifer. And the polluted area of the soil and groundwater would be enlarged along the pathway The study on possibility of the soil subsidence and reducing surface water flow in small creek were also needed. This study suggest one of the counter measurement that restoring the declined groundwater table after groundwater environmental study
$PM_{10}$ concentrations were measured at four monitoring sites at the Daechaung station of the Seoul subway. The four locations included two tunnels, a platform, and a waiting room. The outside site of the subway was also monitored for comparison purposes. In addition, the effect of the platform screen doors (PSDs) recently installed to isolate the $PM_{10}$ in a platform from a tunnel were evaluated, and a comparison between $PM_{10}$ levels during rush and non-rush hours was performed. It was observed that $PM_{10}$ levels in the tunnels were generally higher than those in the other locations. This might be associated with the generation of $PM_{10}$ within the tunnel due to the train braking and wear of the subway lines with the motion of the trains, which promotes the mixing and suspension of particulate matter. During this tunnel study, it was observed that the particle size of $PM_{10}$ ranged from 1.8 to 5.6 ${\mu}m$. It was revealed that the $PM_{10}$ levels in the tunnels were significantly increased by the PSDs, while those in the platform and waiting room decreased. As a result, in order to estimate the effect of ventilation system on $PM_{10}$ levels in the tunnels, fans with inverters were operated. It was found that the concentration of $PM_{10}$ was below 150 ${\mu}g/m^3$ when the air flow rate into a tunnel was approximately 210,000-216,000 CMH.
The screen doors installed in the station of subway are subject to the train-wind pressure caused by the operation of trains. The train-wind pressure has to be correctly estimated for the design of safe structure of screen doors. As three-dimensional numerical flow analysis technology has been significantly developed, the analysis on the train-wind pressure with diverse variables such as train specifications, train speed, tunnel and station configurations, and blockage ratio can be effectively carried out with three-dimensional numerical method. In this study, computational analysis of train-induced wind in a subway tunnel employing the screen doors are carried out by using the three-dimensional numerical method with the model of the moving boundary for the run of trains. While the numerical analysis of train-wind pressure was applied on the one island-type station in the Seoul Subway Line 2, maximum pressure of 494 Pa was estimated on the screen door when two trains pass each other at the speed of 80km/h in the platform.
To effectively reduce PM10 generated in concourses and platforms of subway stations, a research is being conducted to find the PM10 source. The main source of PM10 in subway stations was PM10 generated in the main line tunnels, which was generated in proportion to the frequency of the train operation. Each amount of the PM10 generated when the train was operated once, was constant regardless of the time. On the assumption that the PM10 level in a tunnel of a line is a sum of newly generated amount of dust when the subway passes and the amount carried from the adjacent stations by the wind generated from the subway rolling stocks, the method which estimates the intensive PM10 occurring section was developed and applied to the 12 stations between Cheongdam and Jangseungbaegi in Seoul Subway Line 7.
Journal of Korean Tunnelling and Underground Space Association
/
v.7
no.2
/
pp.153-163
/
2005
This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.
Park, Bong-Ki;Hwang, Je-Don;Park, Chi-Myeon;Kim, Sang-Su
Proceedings of the Korean Geotechical Society Conference
/
2005.10a
/
pp.140-153
/
2005
During the tunnel construction the major failure mode can be categorized as: tunnel failure just after the tunnel excavation without support, failure after application of shotcrete and finally failure after setting the concrete lining. The failure mode just after the tunnel excavation without support, can be further classified as : bench failure, crown failure, face failure, full face failure, failure due to weak strata and failure due to overburden. Moreover the failure after application of shotcrete is classified as heading face failure, settlement of shotcrete support, local failure of shotcrete lining and invert shotcrete. To find out the major causes of tunnel collapse, the investigation was done in case of the second phase of Seoul subway construction. The investigation results depicted that the major causes of tunnel collapse were due to the weak layer of rock/fault and sudden influx of ground water from the tunnel crown. While the investigation results of the mountain road tunnels construction have shown that the major causes of tunnel failure were inadequate analysis of tunnel face mapping results, intersection of faults and limestone cavities. In this paper some recent measurement in order to mitigate such tunnel collapse are presented
This paper presents an experimental study on the radio propagation characteristics in subway tunnel at 18GHz frequency band which has been assigned to video transmission between train and wayside. The radio propagation tests are carried out in the subway tunnel of Seoul Metro using the antenna and communication devices of the prototype video transmission system. The measurement results show that 18GHz radio propagation in subway tunnel has smaller path loss than that of general outdoor radio environment. It is also cleared that the arch-type tunnels have smaller radio propagation losses than rectangular tunnels, and single track tunnels have smaller pass loss than double track tunnels. From the measurements, the radio propagation coverage is worked out as 520 meters. The curved tunnels which cannot have LOS communication between transmitter and receiver have large pass losses and fluctuation profile along distance. The radio propagation coverage along curved tunnels is worked out as 300 meters. These investigation results can be used to design the 18GHz radio transmission system for subway tunnel by providing the optimized wayside transmitter locations and handover algorithm customized to the radio propagation characteristics in subway tunnels.
In this study, the behavior of urban subway tunnels is measured using instrumentation sensors installed in the lining concrete inside subway tunnels in order to analyze their behavior according to temperature variations. It is observed that the stresses of the concrete lining, tunnel convergence, and cracks change according to the temperature variations. However, the crack deformation differs depending on the size and status of the crack. In addition, this study proposes a correction formula for the lining stress and tunnel convergence through numerical analyses of the concrete lining according to the temperature variations. The results of this research can be used in the tunnel maintenance considering the tunnel behavior depending on the temperature variations in the tunnel.
Soil and rock improvement and reinforcement techniques are applied to achieve safe tunnel excavation in difficult geological conditions. The Umbrella Arch Method(UAM), one of the auxiliary techniques, is used to reduce ground permeability and improve stabtility of the tunnel by inserting a series of steel pipes into ground around the crown inclined to the longitudinal axis of the tunnel. Additionally, multi-step grouting is added through the steel pipes. UAM combines the advantages of a modern forepoling system with the grouting injection method. This technique has been applied in subway, road and utility tunneling sites for the last few years in Korea. This paper presents the results of analysis of the case studies on ground movements associated with UAM used in the Seoul Subway line 5 constructon site. Improvement of tunnel stability and decrease of ground settlement expected with pipe insertion are also discussed. Finally, the method to minimize ground settlements caused by NATM tunnelling are suggested.
Journal of Korean Society for Atmospheric Environment
/
v.31
no.2
/
pp.164-172
/
2015
Seoul subway plays an important part for the public transportation service in Seoul metropolitan area. As the subway system is typically a closed environment, frequent air pollution problems occurred and passengers get malhealth impact. Especially particulate matters (PM) is well known as one of the major pollutants in subway environments. The purpose of this study was to compare the concentrations of $PM_{10}$ and $PM_{2.5}$ in the Seoul subway system and to provide fundamental data in order to management of subway system. $PM_{10}$ and $PM_{2.5}$ samples were collected in the M station platform and tunnel of Subway Line 4 in Seoul metropolitan and in an outdoor location close to it from Apr. 21, 2010~Oct. 27, 2013. The samples collected on teflon filters using $PM_{10}$ and $PM_{2.5}$ mini-volume portable samplers and PM sequential sampler. The PM contributions were $48.6{\mu}g/m^3$ (outdoor), $84.6{\mu}g/m^3$ (platform) and $204.8{\mu}g/m^3$ (tunnel) for $PM_{10}$, and $34.6{\mu}g/m^3$ (outdoor), $49.7{\mu}g/m^3$ (platform) and $83.1{\mu}g/m^3$ (tunnel) for $PM_{2.5}$. The $PM_{10}$ levels inside stations and outdoors are poorly correlated, indicating that $PM_{10}$ levels in the metro system are mainly influenced by internal sources. In this study, we compared PM concentrations before and after operation of ventilation and Electrostatic Precipitator (EP). Despite the increased PM concentration at outdoor, $PM_{10}$ concentration at platform and tunnel showed the 31.2% and 32.3% reduction efficiency after operation the reduction system. The overall results of this study suggest that the installation and operation of the ventilating system and EP should have served as one of the important components for maintaining the air quality in the subway system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.