• Title/Summary/Keyword: Subsea tunnel

Search Result 78, Processing Time 0.027 seconds

Simulation study of smoke spread prevention using air curtain system in rescue station platform of undersea tunnel (해저터널 구난역 플랫폼 화재연기확산 방지를 위한 에어커튼 시스템 차연성능 시뮬레이션 연구)

  • Park, Sang-Heon;An, Jung-Ju;Han, Sang-Ju;Yoo, Yong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.257-266
    • /
    • 2015
  • This study introduce that we studied optimization and possibility of smoke spread prevention with air-curtain system in undersea tunnel named from Ho-Nam to Jeju line in domestic if a fire break out in train. To verify performance, air-curtain system is installed between rescue station platform and each door of passenger car to provide safety route to evacuator and we studied simulation model of various cases about 15 MW fire severity considering domestic specifications. As a result we verified the fact that CASE1(air jet with 15degree toward passenger car) and CASE 5 (air jet with 15degree toward passenger car and pressure air blast from cross passage) is best Smoke Spread Prevention and less inflow carbon monoxide. Through above results, we expect that air-curtain system is one of the facilities for fire safety and provide us safety platform route in undersea tunnel.

Review of Pre-grouting Methods for Shield TBM Tunneling in Difficult Grounds (특수지반에서 쉴드TBM 굴착 시 프리그라우팅 적용 사례 고찰)

  • Yoon, Youngmin;Jeong, Hoyoung;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.528-546
    • /
    • 2018
  • Cases of TBM tunnelling have been consistently increasing worldwide. In many recent subsea and urban tunnelling projects, TBM excavation has been preferably considered due to its advantages over drill and blast tunnelling. Difficult ground conditions are highly probable to appear in subsea and urban tunnels because of the shallow working depth and alluvial characteristics. Under the difficult ground conditions, ground reinforcement measures should be considered including grouting, while it is of great importance to select the optimal grout material and injection method to cope with the ground condition. The benefits from TBM excavation, such as fast excavation, increased safety, and reduced environmental impact, can be achieved by applying appropriate ground reinforcement with the minimum overrun of cost and time. In this report, various grouting methods were reviewed so that they can be applied in difficult ground conditions. In addition, domestic and international cases of successful ground reinforcement for difficult grounds were introduced for future reference.

Analysis of Advanced Rate and Downtime of a Shield TBM Encountering Mixed Ground and Fault Zone: A Case Study (단층대와 복합지반을 통과하는 쉴드TBM의 굴진율 및 다운타임 발생 특성 분석)

  • Jeong, Hoyoung;Kim, Mincheol;Lee, Minwoo;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.29 no.6
    • /
    • pp.394-406
    • /
    • 2019
  • Difficult ground conditions (e.g., fault zone and mixed grounds) are highly probable to appear in subsea and urban tunnels because of the shallow working depth and alluvial characteristics. TBM usually experienced decrease of penetration rate and increase of downtime when it meets these difficult ground conditions. The problems are usually caused by the adverse geological conditions, and it is preferable to determine the optimal operational parameters of TBM based on the previous operational data obtained while excavating a preceding tunnel. This study carried out for efficient TBM excavation in fault zone and mixed grounds. TBM excavation data from the tunnel site in Singapore and the characteristics of the TBM excavation data was analyzed. The key operational parameters (i.e., thrust, torque, and RPM), penetration rate, and downtime were highly influenced by the presence of fault zones and mixed grounds, and the features was discussed. It is expected that the results and main discussions will be useful information for future tunneling projects in similar geological conditions.

A Case Study of Test Production of Gas from Hydrate Bearing Sediments on Nankai Trough in Japan (일본 난카이 해구 가스하이드레이트 퇴적층으로부터의 가스 시험생산 사례분석)

  • Kim, A-Ram;Lee, Jong-Won;Kim, Hyung-Mok
    • Tunnel and Underground Space
    • /
    • v.25 no.2
    • /
    • pp.133-143
    • /
    • 2015
  • Gas hydrate is a solid substance composed of natural gas constrained in water molecules under low temperature and high pressure conditions. The existence of hydrates has been reported to be world-widely distributed, mainly at permafrost and deep ocean floor. Test productions of small amount of natural gas from the on-shore permafrost have been accomplished in U.S.A and Canada, but, world-first and the only production case from off-shore hydrate bearing sediments was in Nankai trough, Japan. In this study, we introduce key technologies in gas production from hydrates by analyzing the Japanese off-shore gas production project in Nankai trough in terms of depressurization- induced dissociation so as to utilize planned domestic gas production test in Ulleung basin.

A Study on the Automation Algorithm to Identify the Geological Lineament using Spatial Statistical Analysis (공간통계분석을 이용한 지질구조선 자동화 알고리즘 연구)

  • Kwon, O-Il;Kim, Woo-Seok;Kim, Jin-Hwan;Kim, Gyo-Won
    • The Journal of Engineering Geology
    • /
    • v.27 no.4
    • /
    • pp.367-376
    • /
    • 2017
  • Recently, tunneling under the seabed is becoming increasingly common in many countries. In Korea, there are proposals to tunnel from the mainland to Jeju Island. Safe construction requires geologic structures such as faults to be characterized during the design and construction phase; however, unlike on land, such structures are difficult to survey seabed. This study aims to develop an algorithm that uses geostatistics to automatically derive large-scale geological structures on the seabed. The most important considerations in this method are the optimal size of the moving window, the optimal type of spatial statistics, and determination of the optimal percentile standard. Finally, the optimal analysis algorithm was developed using the R program, which comprehensibly presents variations in spatial statistics. The program allows the type and percentile standard of spatial statistics to be specified by the user, thus enabling an analysis of the geological structure according to variations in spatial statistics. The geotechnical defense-training algorithm shows that a large, linear geological lineament is best visualized using a $3{\times}3$ moving window and a 10% upper standard based on the moving variance value and fractile. In particular, setting the fractile criterion to the upper 0.5% almost entirely eliminates the error values from the contour image.

Experimental study on applicability of compressed air foam fire water using seawater in train fire at subsea tunnel rescue station (해저터널 구난역 열차화재시 압축공기포 소화용수의 해수 적용성에 관한 실험 연구)

  • Park, Byoung-Jik;Shin, Hyun-Jun;Yoo, Yong-Ho;Park, Jin-Ouk;Kim, Hwi-Seong;Kim, Yang-Kyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.705-715
    • /
    • 2017
  • In this study, applicability of compressed air form (CAF) fire water was verified in a bid to use the undersea effluent as fire water. Foam collector was fabricated in accordance with KS B ISO 7203-1 (Specification for low expansion foam concentrates for top application to water-immiscible liquids) and the test was conducted using fresh water as fire water for 19 times and using seawater as fire water 15 times that totaled 34 times. Foam reduction time was 237.73 seconds on average with fresh water and 215.60 seconds with seawater, which proved the applicability of CAF fire water using seawater. Besides, window breaker was fabricated to directly extinguish the fire in train and a full-scale fire test was conducted three times. At the final 3rd test, window glass was broken in 2 seconds to make the hole for fire extinguishing and suppressed the fire in 3 seconds using CAF fire extinguisher.

Study on selection and basic specifications design of shield TBM for power cable tunnels (터널식 전력구 쉴드TBM 선정 및 기본설계 사양 제시에 관한 연구)

  • Jung Joo Kim;Ji Yun Lee;Hee Hwan Ryu;Ju Hwan Jung;Suk Jae Lee;Du San Bae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.3
    • /
    • pp.201-220
    • /
    • 2023
  • Power cable tunnels is one of the underground structures meant for electricity transmission and are constructed using shield TBM method when transitting across urban and subsea regions. With the increasing shaft depth for tunnels excavation when the shield TBM excavated the rock mass, the review of selecting closed-type shield TBM in rocks becomes necessary. A simplified shield TBM design method is also necessary based on conventional geotechnical survey results. In this respect, design method and related design program are developed based on combined results of full-scale tests, considerable amount of accumulated TBM data, and numerical simulation results. In order to validate the program results, excavation data of a completed power cable tunnel project are utilized. Thrust force, torque, and power of shield TBM specification are validated using Kernel density concept which estimates the population data. The robustness of design expertise is established through this research which will help in stable provision of electricity supply.

Development of a TBM Advance Rate Model and Its Field Application Based on Full-Scale Shield TBM Tunneling Tests in 70 MPa of Artificial Rock Mass (70 MPa급 인공암반 내 실대형 쉴드TBM 굴진실험을 통한 굴진율 모델 및 활용방안 제안)

  • Kim, Jungjoo;Kim, Kyoungyul;Ryu, Heehwan;Hwan, Jung Ju;Hong, Sungyun;Jo, Seonah;Bae, Dusan
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.3
    • /
    • pp.305-313
    • /
    • 2020
  • The use of cable tunnels for electric power transmission as well as their construction in difficult conditions such as in subsea terrains and large overburden areas has increased. So, in order to efficiently operate the small diameter shield TBM (Tunnel Boring Machine), the estimation of advance rate and development of a design model is necessary. However, due to limited scope of survey and face mapping, it is very difficult to match the rock mass characteristics and TBM operational data in order to achieve their mutual relationships and to develop an advance rate model. Also, the working mechanism of previously utilized linear cutting machine is slightly different than the real excavation mechanism owing to the penetration of a number of disc cutters taking place at the same time in the rock mass in conjunction with rotation of the cutterhead. So, in order to suggest the advance rate and machine design models for small diameter TBMs, an EPB (Earth Pressure Balance) shield TBM having 3.54 m diameter cutterhead was manufactured and 19 cases of full-scale tunneling tests were performed each in 87.5 ㎥ volume of artificial rock mass. The relationships between advance rate and machine data were effectively analyzed by performing the tests in homogeneous rock mass with 70 MPa uniaxial compressive strength according to the TBM operational parameters such as thrust force and RPM of cutterhead. The utilization of the recorded penetration depth and torque values in the development of models is more accurate and realistic since they were derived through real excavation mechanism. The relationships between normal force on single disc cutter and penetration depth as well as between normal force and rolling force were suggested in this study. The prediction of advance rate and design of TBM can be performed in rock mass having 70 MPa strength using these relationships. An effort was made to improve the application of the developed model by applying the FPI (Field Penetration Index) concept which can overcome the limitation of 100% RQD (Rock Quality Designation) in artificial rock mass.