• 제목/요약/키워드: Subassembly

검색결과 64건 처리시간 0.023초

생산 흐름 분석을 통한 FAS라인의 최적 배치 설계에 관한 연구 (A Study on Optimized Layout Design of FAS Line Through Production Flow Analysis)

  • 가춘식;정진휘;장봉춘;엄용균
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.1070-1075
    • /
    • 2004
  • Many mid-sized companies in Korean automotive industry have attempted to solve the lack of human power, to control the quality of components, to improve the production rate, and to innovate the manufacturing line. The goals of this study are to analyze the production rate of an automotive component manufacturing line using simulation software, to construct a Flexible Automation Subassembly (FAS) system and to suggest an optimized layout design using FAS line. In this research, the simulation model for manufacturing line was developed and used the realistic data (production planning, component type, working order, process time, queue time, line rules, etc) of a medium sized company in Korean automotive industry. To complete this research, a simulation software 'ARENA' was used.

  • PDF

생산 흐름 분석을 통한 FAS라인의 최적 배치 설계에 관한 연구 (A Study on Optimized Layout Design of FAS Line Through Production Flow Analysis)

  • 가춘식;장봉춘;엄용균
    • 대한기계학회논문집A
    • /
    • 제29권1호
    • /
    • pp.38-44
    • /
    • 2005
  • Many mid-sized companies in Korean automotive industry have attempted to solve the lack of human power, to control the quality of components, to improve the production rate, and to innovate the manufacturing line. The goals of this study are to analyze the production rate of an automotive component manufacturing line using simulation software, to construct a Flexible Automation Subassembly (FAS) system and to suggest an optimized layout design using FAS line. In this research, the simulation model for manufacturing line was developed and used the realistic data of a medium sized company in Korean automotive industry. To complete this research, a simulation software 'ARENA' was used. This research analyzed the work distribution strategy and cycle time element for production flow and proposed an optimized layout to resolve line balancing problem which would bring the improved production rate.

시간차감법에 의한 발주계획연구 (A Study on Order Release Scheduling by Lead Time Offsetting Technique)

  • 민경석
    • 산업경영시스템학회지
    • /
    • 제8권11호
    • /
    • pp.45-56
    • /
    • 1985
  • This thesis studies the order release scheduling by lead time offsetting technique in MRP system. MRP is the process of working backward from the scheduled completion dates of end products or major assemblies to determine the dates and quantities when the various component parts and materials are to be ordered. It aims getting the right quantity of component parts to the right places at the right time with a schedule that puts each parts or subassembly into stock shortly ahead of the need for that parts or subassembly. The planned order release point of a item can be easily decided when the scheduled completion date and planned lead time is certain and known before by lead time offsetting technique in MRP system.

  • PDF

조립을 위한 설계의 체계화 (Systematization of Design for Assembly)

  • 목학수
    • 산업공학
    • /
    • 제4권2호
    • /
    • pp.13-24
    • /
    • 1991
  • The important subject for assembly automation is to improve the assemblability of parts. To do this, parts and subassembly are analyzed and alternatives are constructed systematically. The optimal alternative that has the highest assemblability should be chose among all the constructed alternatives by the proper criteria and evaluating methods.

  • PDF

Physical Media Dependent Prototype for 10-Gigabit-Capable PON OLT

  • Kim, Jongdeog;Lee, Jong Jin;Lee, Seihyoung;Kim, Young-Sun
    • ETRI Journal
    • /
    • 제35권2호
    • /
    • pp.245-252
    • /
    • 2013
  • In this work, we study the physical layer solutions for 10-gigabit-capable passive optical networks (PONs), particularly for an optical link terminal (OLT) including a 10-Gbit/s electroabsorption modulated laser (EML) and a 2.5-Gbit/s burst mode receiver (BM-Rx) in a novel bidirectional optical subassembly (BOSA). As unique features, a bidirectional mini-flat package and a 9-pin TO package are developed for a 10-gigabit-capable PON OLT BOSA composed of a 1,577-nm EML and a 1,270-nm avalanche photodiode BM-Rx, including a single-chip burst mode integrated circuit that is integrated with a transimpedance and limiting amplifier. In the developed prototype, the 10-Gbit/s transmitter and 2.5-Gbit/s receiver characteristics are evaluated and compared with the physical media dependent (PMD) specifications in ITU-T G.987.2 for XG-PON1. By conducting the 10-Gbit/s downstream and 2.5-Gbit/s upstream transmission experiments, we verify that the developed 10-gigabitcapable PON PMD prototype can operate for extended network coverage of up to a 40-km fiber reach.

Shipyard Skid Sequence Optimization Using a Hybrid Genetic Algorithm

  • Min-Jae Choi;Yung-Keun Kwon
    • 한국컴퓨터정보학회논문지
    • /
    • 제28권12호
    • /
    • pp.79-87
    • /
    • 2023
  • 본 연구는 조선소 소조립 공정에서 스키드 투입 순서 최적화를 통해 전체 작업시간을 단축시키는 새로운 유전 알고리즘 방법을 제안한다. 하나의 해는 스키드 번호들의 순열로 표현되며 그러한 표현에 적합한 유전 연산자들을 적용하였다. 또한 탐색 성능의 개선을 위해 UniDev라 불리우는 기존의 휴리스틱 알고리즘을 적절하게 변형하여 유전 알고리즘과 결합하였다. 특히 UniDev에서 느린 스키드 탐색 부분을 그리디 알고리즘의 형태로 변경하였다. 매우 큰 규모의 문제에 대해 시뮬레이션을 수행한 결과 Multi-Start 탐색과 UniDev기반 혼합형 유전알고리즘에 비해 본 연구에서 제안하는 방법이 안정적으로 작업시간을 최소화함을 관찰하였다.

전기체 복합재 무인항공기 제작 (Manufacturing of an All Composite Unmanned Aerial Vehicle)

  • 김동민;허명규;강공진
    • 한국복합재료학회:학술대회논문집
    • /
    • 한국복합재료학회 2002년도 춘계학술발표대회 논문집
    • /
    • pp.163-166
    • /
    • 2002
  • For the development of an all composite unmanned aerial vehicle (UAV), manufacturing consideration in design phase, works for composite parts fabrication, subassembly and final assembly are summarized. In design phase, to maximize the advantage of composite material, manufacturing processes such as cocuring, cobonding and secondary bonding are introduced. For the curing of designed parts, composite tools are designed and manufactured. Assembly jigs are designed to satisfy dimensional tolerance of the structure. Inspection criteria are established and applied to the manufacturing. Technical data about inspection items and methods are summarized as manufacturing specifications for the mass production of the UAV structure.

  • PDF

부품의 리사이클링을 위한 최적 해체경로 생성 (Optimum Disassembly Sequence Generation of Parts for Recycling)

  • 이건상
    • 한국공작기계학회논문집
    • /
    • 제15권1호
    • /
    • pp.70-75
    • /
    • 2006
  • This paper represents a study on disassembly sequence generation system for automobile parts. This system is practically very useful because proper disassembly sequence of end-of-life product becomes crucial as take-back obligations are imposed for environmental reasons. Therefore a disassembly sequence generation system is suggested to automatically derive all the feasible disassembly sequences from the assembly modeling files. As a result, in consideration of the all parts and subassemblies the optimum disassembly sequence is generated. And the optimum disassembly sequence for a certain part or subassembly can be also suggested.