• Title/Summary/Keyword: Structure Planning

Search Result 1,722, Processing Time 0.035 seconds

A Study on the Models for Production Planning of Multiproduct (복합제품의 생산계획을 위한 모형수립에 관한 고찰)

  • 전만술
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.8
    • /
    • pp.49-53
    • /
    • 1983
  • The purpose of this study is to consider models for the production planning of multiproduct. Because these multiproducts use common facilities, labor, and materials, they are able to be considered jointly instead of planned independently. Initially linear programming models will be considered, followed by some examples of modeling and analysis when the cost structure is nonlinear. Basic model components are the following ; (1) inventory balance equations for each product to link successive time periods, and (2) capacity constraints for each period to represent resource limitations.

  • PDF

Life Cycle Cost Analysis for Korea High-Speed Rail Project (한국형 고속전철 시스템의 비용분석)

  • 이태형;목진용;박춘수
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.376-381
    • /
    • 2002
  • In this study, we have analyzed the cost of korea high-speed rail project. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research St development activity in planning phase is relatively correct.

  • PDF

CIM Implementation through JIT and MRP Integration (JIT 와 MRP 통합에 의한 CIM 추진 사례연구)

  • Lee, Young-Q.;Shin, Hee-Jun;Kim, Myong-Sun
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.39-51
    • /
    • 1994
  • A CIM implementation case is introduced in this paper. It is accomplished through the integration of two fundamental approaches to production planning and control; JIT and MRP. The resultant system is a hybrid where some JIT methodologies prevail, but the benefits of the MRP are also required. A new BOM structure called 'Family-BOM' is designed for the load leveled production with small lot size and the synchronized production. The overall production planning concept is described with actual data.

  • PDF

Conceptual WBS Model for a Large-Scale Information System Acquisition Project (대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구)

  • Nam Yong Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

An Artificial Neural Network for the Optimal Path Planning (최적경로탐색문제를 위한 인공신경회로망)

  • Kim, Wook;Park, Young-Moon
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.333-336
    • /
    • 1991
  • In this paper, Hopfield & Tank model-like artificial neural network structure is proposed, which can be used for the optimal path planning problems such as the unit commitment problems or the maintenance scheduling problems which have been solved by the dynamic programming method or the branch and bound method. To construct the structure of the neural network, an energy function is defined, of which the global minimum means the optimal path of the problem. To avoid falling into one of the local minima during the optimization process, the simulated annealing method is applied via making the slope of the sigmoid transfer functions steeper gradually while the process progresses. As a result, computer(IBM 386-AT 34MHz) simulations can finish the optimal unit commitment problem with 10 power units and 24 hour periods (1 hour factor) in 5 minites. Furthermore, if the full parallel neural network hardware is contructed, the optimization time will be reduced remarkably.

  • PDF

Integrated Structural Design of Oceanic Buildings using STEP (STEP을 이용한 해양건축물의 통합구조설계 기법)

  • 송화철
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.77-86
    • /
    • 2000
  • The planning process of complex projects in oceanic architectural engineering is characterized by the cooperation of many involved specialists and by a high degree of information exchange. In order to improve the quality of the structural design of oceanic buildings, information of different involved partners in the planning process has to be integrated. This paper aims to introduce a concept of the integrated structural design for the floating-type oceanic building using STEP(Standard for the Exchange of Product Model Data). STEP(ISO 10303) is an international standard for the computer-interpretable representation and exchange of product data and it provides a consistent data exchange format and application interfaces between different application systems. In this paper, the structural design process and information of oceanic buildings is analyzed and product models are preposed fir the exchange of the structural design information between superstructure and floating structure. The entities for calculating wind loads, metacenter and restoring forces are represented by Express. As a case study a floating hotel is applicated to describe the STEP physical file.

  • PDF

A Study on the Characteristics of Indeterminate Program based on the Philosophical Concept of Relationship in Post Structuralism (후기구조주의적 사유체계로서의 관계성에 기초한 현대건축공간의 비결정적 프로그램의 특성에 관한 연구)

  • Kim Yun-Jung;Park Chan-I1
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.6 s.53
    • /
    • pp.37-46
    • /
    • 2005
  • This study is focused on the indeterminacy of the contemporary social structure based on the philosophical concept of relationship. The purpose of this study is to present the index of the space planning that the contemporary society demands through analysis of a characteristics of the indeterminate program. As the result, we got a characteristic and a design method of the following indeterminate programs. (1)The characteristic of the interior space programs are in such cases as combined, the continuance, the pile, the juxtaposition, mixing and interference etc. (2) The characteristics of space planning are multiple changes of the space occupation, various sight experiences, folding structure, expansion of flow space, the insertion of a between spates etc. (3) The characteristic of space design expression is addition of various functions tv unification of a structural element and an element of furniture.

A study on analysis of the structure of green space by the types of urban residential areas (도시내 주거지 유형별 녹지구조분석에 관한 연구)

  • 송태갑;김은일
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.3
    • /
    • pp.56-65
    • /
    • 1997
  • This research was conducted to suggest some directions for desirable urban green space planning through 1) establishing a new classification system by examining the existing concept, problems and characteristics of green space and 2) defining the essence of green space environment and finding some analytical and evaluative methods through a clear establishment of functions, indicators of green space. In the research, measurements of the amount of green space was accompanied with measurements of green covered space, green volume, and the structure of greenery within the frame of vision. As result, three-dimensional measurement was possible, three-dimensional measurement was possible, which turned out to be more effective than the existing 2-dimensional measuring method. It is found that the ratio of green covered space is to proportional to the ratio of green volume in this study. Therefore in green space planning process it is desirable to consider the ratio of green volume all together.

  • PDF

A Study on the Village Groves in Chinan-Gun Region, Korea (진안지역 마을 숲에 관한 연구)

  • Park, Jae-Chul
    • Journal of Korean Society of Rural Planning
    • /
    • v.5 no.1 s.9
    • /
    • pp.56-65
    • /
    • 1999
  • The purpose of this study was to identify remained real state of the village groves in human settlement circle. That was practiced in case of Chinan-Gun region which traditional elements had well been conserved. 33 village groves were found by site survey, reference and interview in Chinan-Gun region. 31 of 51 village groves were clarified as complementing village grove by classification of grove character. It was identified through survey that many were partially destructed by development and human overuse. The results of this study showed general, socio-behavioral characteristics, characteristics of forest state and vegetation structure of village groves in Chinan-Gun region. Length, area, form, type, motive, location, relationship of those were analyzed to identify general characteristics. Facilities, human behavior and ownership of those were analyzed to identify socio-behavioral characteristics. Principal dominant species and appearing rate, height, width, density of those, species diversity of groves were analyzed to identify forest state and vegetation structure. Interrelation between each factor were analyzed and comparative review with previous studies was achieved.

  • PDF

Model for the description of disassembly sequence structure (분해순서 구조 기술을 위한 모델)

  • 박홍석;목학수;최흥원
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.422-425
    • /
    • 2001
  • The realization of the avoidance, decrease and utilization of waste can be made through reduction of resource consumption during product production and use. Beside that it is desirable to regain the resource attached to products and components. The same resources can be much used in product and mater all cycle through their reuse and regeneration In order to improve the use productivity of resource the disassembly make up the substantial prerequisite. In this paper a model describing the disassembly sequence structure is introduced under consideration of the influential facts related to disassembly process planning rules for disassembly sequence planning are derived from that.

  • PDF