• 제목/요약/키워드: Structural BIM

검색결과 212건 처리시간 0.024초

Symbol recognition using vectorial signature matching for building mechanical drawings

  • Cho, Chi Yon;Liu, Xuesong;Akinci, Burcu
    • Advances in Computational Design
    • /
    • 제4권2호
    • /
    • pp.155-177
    • /
    • 2019
  • Operation and Maintenance (O&M) phase is the main contributor to the total lifecycle cost of a building. Previous studies have described that Building Information Models (BIM), if available with detailed asset information and their properties, can enable rapid troubleshooting and execution of O&M tasks by providing the required information of the facility. Despite the potential benefits, there is still rarely BIM with Mechanical, Electrical and Plumbing (MEP) assets and properties that are available for O&M. BIM is usually not in possession for existing buildings and generating BIM manually is a time-consuming process. Hence, there is a need for an automated approach that can reconstruct the MEP systems in BIM. Previous studies investigated automatic reconstruction of BIM using architectural drawings, structural drawings, or the combination with photos. But most of the previous studies are limited to reconstruct the architectural and structural components. Note that mechanical components in the building typically require more frequent maintenance than architectural or structural components. However, the building mechanical drawings are relatively more complex due to various type of symbols that are used to represent the mechanical systems. In order to address this challenge, this paper proposed a symbol recognition framework that can automatically recognize the different type of symbols in the building mechanical drawings. This study applied vector-based computer vision techniques to recognize the symbols and their properties (e.g., location, type, etc.) in two vector-based input documents: 2D drawings and the symbol description document. The framework not only enables recognizing and locating the mechanical component of interest for BIM reconstruction purpose but opens the possibility of merging the updated information into the current BIM in the future reducing the time of repeated manual creation of BIM after every renovation project.

사례연구를 통한 RC구조 BIM에서의 물량정보 효율성 분석기반 물량산출 데이터베이스 구축 (Implementation of Quantity Estimation Database based on Efficiency Analysis of Quantity Information about BIM(Building Information Modeling) of Reinforced Concrete Structure through the Case Study)

  • 조영상;배준서;김유리
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2009년도 정기 학술대회
    • /
    • pp.513-516
    • /
    • 2009
  • 본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.

  • PDF

BIM 기반 골조 물량산출 및 도면생성 모듈의 설계와 구현 (Design and Implementation of the Quantity Surveying and Shop Drawing System for Structures)

  • 이병권;김치경
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.132-135
    • /
    • 2011
  • 최근 설계 단계에서 설계품질 향상과 시공 단계에서 비용 절감을 효과를 기대하며 3차원 BIM 관련 기술에 대한 관심이 높아가고 있으며, 또한 부분적으로 기술 도입 효과가 나타나고 있다. BIM 기술은 크게 BIM 도구를 활용하여 설계정보를 디지털화하는 모델링 단계 기술과 BIM 모델로부터 설계 정보를 추출하여 업무 진행에 필요한 형태로 가공, 변환하는 정보 활용 기술로 구분하여 생각할 수 있다. BIM 기술에 대한 근자의 높은 관심에도 불구하고 실제 현장에 적용되어 가시적인 성과를 내는 데에 한계를 보이고 있는 이유 중 하나로 후자의 정보 추출 및 활용 기술의 범위와 완성도의 한계를 들 수 있다. 즉 많은 노력을 통하여 BIM 모델을 구축하더라도 이를 기반으로 물량산출, 도면 생성 등 가장 기본적인 업무조차도 현장에서 바로 사용할 수 있는 수준의 기능이 제공되고 있지 않다. 본 연구에서는 건축 골조를 대상으로 3차원 골조 모델을 이용하여 골조 물량, 특히 정확한 물량산출이 상대적으로 어려운 철근에 대하여 철근의 이음, 정착 등이 고려된 실행물량을 산출할 수 있는 시스템을 설계하고 구현하였다. 또한 3차원 모델을 기반으로 철근 배근시공도와 가공일람표를 관련 기준에 따라 정확히 자동 작성함으로써 골조공사가 효율적으로 수행되고, 특히 정확한 이음 및 정착과 가공 계획을 통하여 철근 손실율을 최소화함이 기대된다. 본 논문에서는 이러한 BIM 기반 골조 물량산출 및 도면생성 시스템과 관련하여 주요 시스템 설계 내용과 구현 결과에 대하여 기술한다.

  • PDF

BIM and Fire Safety Engineering - Overview of State of The Art

  • Davidson, Anne;Gales, John
    • 국제초고층학회논문집
    • /
    • 제10권4호
    • /
    • pp.251-263
    • /
    • 2021
  • Fire safety engineering is a critical specialization to include in the design of a tall building yet is often excluded from the Building Information Model (BIM) and integrated design process. The design of fire safety systems is interdependent with building/structural geometry, HVAC, mechanical, and electrical systems. A BIM is a 3D visual representation that stores data on these kinds of systems. The compatibility between BIM and fire safety design seems obvious yet has received a dearth of attention in structural (fire) engineering literature. The authors herein have reviewed over 40 recent papers on utilizing BIM for fire safety engineering, focusing on contemporary literature to obtain a more up-to-date review of the state-of-the-art. The resulting trends, technologies, research gaps, and methodologies are presented in this paper. Adoption of BIM in fire safety engineering is slow and behind other disciplines which may be improved if research involved more industry partners. For BIM technology to reach its potential, industry manufacturers need to provide high LOD fire BIM objects, fire engineers and researchers need to collaborate on future advancements, and building owners/management need to be educated on how to use the benefits provided.

BIM 시스템의 장비지원 한계점 분석에 관한 연구 (A Study on Limit Analysis of Constructions Equipment Support through BIM System Information)

  • 전형준;윤석헌;백준홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.450-453
    • /
    • 2008
  • Construction project has been changing to a huge size and speed of construction industrial environment rapidly, therefore construction stakeholder's cooperation is being important. Nowadays, BIM has been used widely to solve the problem. But, the part of equipment planning, the most important part in the actual construction, is lack of studies and information. Therefore, the purpose of this study is to analyze previous BIM tools and research a method to improve affection of information by using BIM equipment database.

  • PDF

BIM 환경에서의 3D 장비 Database 구축에 관한 연구 -Tower Crane Database 구축을 중심으로- (A Study on the establishing a 3D equipment Database for BIM -Focused on the establishing of a Tower Crane Database-)

  • 심태보;윤석헌;백준홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.454-457
    • /
    • 2008
  • The purpose of this study is to establish 3D equipment database for BIM because of efficient using a BIM tool. In this study (or paper), we analysis the mechanism of using equipment database. And then, a based on this results we apply and conduct the results. Therefore we expect to make better using method of BIM and efficient planning method of equipment.

  • PDF

BIM 기반 견적업무 효율성 증대를 위한 마감설계자동화 시스템 개발 (A Development of Finish Drawing Automation System for Improving Efficiency on BIM based Estimation)

  • 김성아;강명구;신태홍;진상윤;윤수원;최철호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.429-434
    • /
    • 2008
  • The objective of this paper is to introduce a project on developing Finish Drawing Automation System. The system aims to improve efficiency of the BIM-based estimation, which is realized by automatic derivation of three-dimensional geometry models of the finish details. First, overall workload differences between the drawing-based estimation methods and the BIM-based methods are analyzed. Second, an automated finish detail design method is proposed as a time-saving measure for the BIM-based estimation, as manual modeling accounts for the most time spent in the model-based estimation process. Finally, the proposed system is evaluated using a case of washboard design.

  • PDF

BIM을 통한 건축기계설비 설계 수준의 이해 (Understanding The MEP Design Level Through BIM)

  • 홍승수;홍원혁;이혁진
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.247-251
    • /
    • 2011
  • 국내에도 BIM이 도입되어 다수의 프로젝트가 수행되고 있으며 정부에서는 정책적으로 BIM 확산을 도모하고 있다. 하지만 기술적 한계와 이해의 부족으로 인한 여러 가지 부작용이 발생하고 있으며 특히 현재 도입이 가장 활성화 되어 있는 설계 엔지니어링 업무 영역에서 보완이 필요한 부분도 가장 많이 발생하고 있는 실정이다. 이에 본 연구에서는 기존의 설계사례의 분석을 통해 협업 관점에서 MEP 작업요소의 주요 이슈를 도출하고 건축기계설비의 관점을 좀 더 정확하게 이해할 수 있도록 타 공종 기준의 MEP 작업요소 이해를 위한 기준을 제시하였으며 이러한 내용이 앞으로의 국내의 BIM 프로젝트의 수행과 지침의 작성에 활용될 수 있는 기초자료로 활용되기를 기대한다.

  • PDF

개방형 BIM 환경에서의 품질검토를 위한 IFC 표준 호환 (IFC Standard Interoperability for Quality Assurance Based on the Open BIM Environment)

  • 김인한;최중식
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2010년도 정기 학술대회
    • /
    • pp.361-364
    • /
    • 2010
  • 본 연구에서는 최근 건설산업의 대형화, 복잡화 등으로 인해 설계와 시공의 불확실성 증가로 대두되고 있는 개방형 BIM 환경에서의 품질검토를 관점으로 표준적인 검증 프로세스에 활용되고 있는 표준 포맷인 IFC를 기반으로 호환성을 시험하였다. 개방형 BIM기반의 품질 검토는 물리정보 품질, 논리정보 품질, 데이터 품질로 구분할 수 있으며, 본 연구에서는 각 품질 검토의 구분에 따라 다양한 측면으로의 호환성 시험을 수행하였다. 그에 따라 호환성 시험 결과를 도출하고, 현 상황의 문제점 및 해결방안을 제시하여 향후 효율적인 개방형 BIM 환경에서의 품질 검토를 위해 필요한 요구 조건 및 적용 방향을 제시하였다.

  • PDF